Loading...
HomeMy WebLinkAbout05060041 LP101 Master Landscape PlanLANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants, equipment, and materials to perform landscape operations in connection with this construction project at the locations shown on the landscape drawing. LANDSCAPE MATERIALS: FERTILIZER: Granular non - burning product composed of not less than 50% organic slow acting, guaranteed analysis professional fertilizer; 20% nitrogen, 10% phosphoric acid, and 5% potash by weight or similarly approved composition. PLANTING BACKFILL SOIL: Backfill plant pits with the following topsoil mixture: 1 part on -site topsoil, 1 part imported topsoil, 1 part compost and 1/2 pound plant specified fertilizer per cubic yard. PLANT MATERIALS: Provide trees and shrubs as indicated. Comply with sizing and grading standards of "American Standard for Nursery Stock ". Provide only sound, healthy vigorous plants free from defects, disfiguring knots, sunscold injuries, frost cracks, plant diseases, insects or any other form of disease or infestation. All plants shall have fully developed form without voids or open spaces. PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch. PROJECT EXECUTION: SUBSURFACE UTILITIES: Contractor shall determine utility line locations prior to commencing work. Any conflicts between utility locations, excavation and /or landscape operations shall be brought to Owner's attention prior to commencing excavation and /or grading work. Contractor assumes responsibility for any utility damage resulting from landscape operations. CONTRACTOR SHALL NOTIFY UTILITY LOCATE SERVICE (1.800. 382.5544) A MINIMUM OF TWO WORKING DAYS PRIOR TO EXCAVATION. PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such as rubble fill, adverse drainage or obstructions, notify owner before planting. See planting details for planting, pruning and staking requirements. SODDED LAWN: Complete all other landscape plantings, mulching, fine grading and staking prior to sodding lawn areas. Provide sodded lawn for all lawn areas utilizing Warren's Turf Type Tall Fescue Sod. Apply fertilizer at a rate of 4 pounds of actual nitrogen per 1,000 square feet. Spread topsoil over lawn areas to a depth of two inches and cultivate soil to a depth of three inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days beyond final acceptance by mowing and watering as required to maintain vigorous growth during establishment period. PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one year after date of substantial completion against defects including death and unsatisfactory growth, except for defects resulting from neglect by the Owner, abuse or damage by others, or unusual phenomena or incidents which are beyond installer's control. Remove and replace trees, shrubs or other plants found to be dead or in unhealthy condition during warranty period. Replace trees and shrubs which are in doubtful condition at end of warranty period. TREE SCHEDULE KEY BOTANICAL NAME SIZE CO Celtis occidentalis 'Prairie Pride' 2.5" Cal. Prairie Pride Hackberry CZ CG Carpinus caroliniona " 1.5 Cal. CZ American Hornbeam 1 Gal. GT Gleiditsia tricanthos inermis 'Skycole' n 2.5 Cal. Skycole Honeylocust TO Thuja occidentalis 'Nigro' , 6 Ht. CY Dark Green Arborvitae EP l HA HA HA ZS Zelkova serrato 'Green Vase' " 2.5 Cal. 6 5 5 5 4 Green Vase Zelkova SHRUB SCHEDULE KEY BOTANICAL NAME SIZE BK Buxus x koreana 'Green Velvet' " 18 Ht. Green Velvet Boxwood CZ HA Hydrangea arborescens 'Annabelle' 24" Ht. CZ Annabelle Hydrangea 1 Gal. N itea virginico 'Henry's Garnet` 24° Ht. Henry's Garnet Sweetspire JC Juniperis chinensis 'Sea Green' " 18 Ht. CY Sea Green Juniper EP l HA HA HA MP Myrica pensylvanica 30" Ht. 6 5 5 5 4 Northern Bayberry VJ Viburnum x juddii 30' Ht. SS Judd's Viburnum 1 Gal. PERENNIAL /GRASS SCHEDULE KEY BOTANICAL NAME SIZE CA Calamagrostis orundinacea 'Karl Foerster' 1 Gal. Karl Foerster Feather Reed Grass CZ Coreopsis verticillato 'Zagreb' CZ Zagreb Coreopsis 1 Gal. EP Echinnacea purpurea 'Kim's Knee High' 1 Gal. Kim's Knee High Purple Coneflower HS Hemerocallis 'Stella de Oro' 1 Gal. CY Stella de Oro Daylilly EP l HA HA HA PH Pennisetum alopecuroides 'Hameln' 1 Gal. 6 5 5 5 4 Dwarf Fountain Grass O Sedum spectabile 'Autumn Joy' l BK SS Autumn Joy Sedum 1 Gal. NOT : THIS DRAWING WAS PREPARED FROM A HARD COPY OF THE SITE ENGINEERING PACKAGE NOT FROM A DETAILED AUTOCAD BASE FILE. THEREFORE ALL SITE HARDSCAPE DIMENSIONS ARE APPROXIMATE. BIOBARRIER® R0, CONTROL SYSTE "Holey Maley" says, "DON'T DIG BLIND" Cot Monday drat* FRdoy -7 AM to 6 PN 1 -800- 382 -5544 PER INDLW STATE LAW IS -69 -1991, R IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 3" MIN. MULCHED 1/2 WIDTH OF RC FINISH GRAC SUB -GRAI Tree Planting Detail P 10 Not to Scale D Root Barrier Control System P -10 Not Scale (n w_ > CV BARK MULCH I\1 i -IN -PLACE CONCRETE HALT PAVEMENT 3ASE COARSE 310BARRIER® ROOT RS 'ONTROL SYSTEM --- PREPARED SUBGRADE BARK MULCH I -IN -PLACE .TE PHALT PAVEMENT BASE COARSE PREPARED SUBGRADE 3110a170 PRUNE DEAD AND DAMAGED BRANCHES, NO MORE THAN 1 /4TH OF BRANCHES. PRUNE TO SHAPE AS NECESSARY RETAINING NORMAL PLANT SHAPE. DO NOT CUT EVERGREEN LEADER. WRAP ENTIRE TRUNK TO HEIGHT OF SECOND BRANCH, TIE EVERY 6 ". ROOT FLARE SHALL BE LEVEL WITH FINISH GRADE. REMOVE SOIL AS NECESSARY FROM TOP OF ROOTBALL TO EXPOSE ROOT FLARE. TOPSOIL CUT AND REMOVE BURLAP FROM TOP 1 /3RD OF ROOT BALL. PLANTING SOIL BACKFILL, SCARIFY SIDES AND BOTTOM OF HOLE PRIOR TO PLANTING. LOOSEN HARD SUB -GRADE Lawn 0 JC ic 8 PH 15 1T � Jc 6 PH 19 i 1 I 1 IV 12 �C C1 CA 19 PRUNE BRANCHES Ak" -A rr- INTERNALLY BY NO RETAINING NORMAL I NEVER CUT OUT EVE CUT AND REMOVE B 1 /3RD OF BALL. ALI REMOVED FROM COIF SCARIFIED PRIOR TO B P10 1 6 JC 6 LOCATION OF ROOT BARRIER INSTALLATION; SEE DETAIL D / LP -101 Underground Stonnwater Detention 33 i i CC ' 2 I I IV JC 7 EP 14 TO E6 cc E2 CT CA 27 ZS 3 E 116th St Path 0 CA 10 IV 5 PH 13 1T Trash Lawn F� Professional Z S CZ 1 Lawn 14 cli O : .� H CY EP l HA HA HA CC 1 6 5 5 5 4 O I l BK U to v 3 >_ � C C _0 0 0 ( 5 0 W E ) CU CU w LIMITS OF STRUCTURAL SOIL; Y SEE DETAIL E / LP -101 CC Designed By BI 1 BK I - 3 L PH i PH I 31 14 H CC EP SS PH 7 IIU 6 11 11 11 � 0 C? NCIS a o Q n W 11 U C/' ROW— — — — — — — — — — — — — Pere s SS PH W � 14 Brick + 18 +Street Trees + SS SS + +Street Trees + IBy others) 7 7 y others) E 116th St Path 0 CA 10 IV 5 PH 13 1T Trash Lawn F� HS 15 1 0 0 CA 18 m 0 m O ; 1 CO 3 BK 1 7 1 AMENDED WITH TOPSOIL TO STORM SEWER NOTES: INSTALLATION AND COMPACTION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S CU- STRUCTURAL SOIL' SPECIFICATIONS. E Tree Planting Detail Using CU Structural Soil'--- A Master Landscape Plan P -10 Not to Scale P 10 Scale:l "= 20' -0" NORTH G R�.. Y No. :.80860005 y STATE OF Professional IN-0- v cli O HS 15 1 0 0 CA 18 m 0 m O ; 1 CO 3 BK 1 7 1 AMENDED WITH TOPSOIL TO STORM SEWER NOTES: INSTALLATION AND COMPACTION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S CU- STRUCTURAL SOIL' SPECIFICATIONS. E Tree Planting Detail Using CU Structural Soil'--- A Master Landscape Plan P -10 Not to Scale P 10 Scale:l "= 20' -0" NORTH G R�.. Y No. :.80860005 y STATE OF U Professional cli O : .� H CY V W O Ca U to v CU U 0 .� W E CU CU w W U Q Designed By BI Drawn By - I - L III H IIU O � 0 C? NCIS a o Q CIZI W 11 U C/' W � C w c N T- U > cli O : .� CY E O Ca U to CU 0 .� E CU CU w W U Designed By BI Drawn By - Revisions - Project # Datc 200101 8.22.( LP 1