HomeMy WebLinkAbout05060041 LP101 Master Landscape PlanLANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants,
equipment, and materials to perform landscape operations in connection with this construction
project at the locations shown on the landscape drawing.
LANDSCAPE MATERIALS: FERTILIZER: Granular non - burning product composed of not less
than 50% organic slow acting, guaranteed analysis professional fertilizer; 20% nitrogen, 10%
phosphoric acid, and 5% potash by weight or similarly approved composition.
PLANTING BACKFILL SOIL: Backfill plant pits with the following topsoil mixture: 1 part on -site
topsoil, 1 part imported topsoil, 1 part compost and 1/2 pound plant specified fertilizer per cubic
yard.
PLANT MATERIALS: Provide trees and shrubs as indicated. Comply with sizing and grading
standards of "American Standard for Nursery Stock ". Provide only sound, healthy vigorous
plants free from defects, disfiguring knots, sunscold injuries, frost cracks, plant diseases, insects
or any other form of disease or infestation. All plants shall have fully developed form without
voids or open spaces.
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
PROJECT EXECUTION: SUBSURFACE UTILITIES: Contractor shall determine utility line
locations prior to commencing work. Any conflicts between utility locations, excavation and /or
landscape operations shall be brought to Owner's attention prior to commencing excavation
and /or grading work. Contractor assumes responsibility for any utility damage resulting from
landscape operations. CONTRACTOR SHALL NOTIFY UTILITY LOCATE SERVICE (1.800.
382.5544) A MINIMUM OF TWO WORKING DAYS PRIOR TO EXCAVATION.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
as rubble fill, adverse drainage or obstructions, notify owner before planting. See planting
details for planting, pruning and staking requirements.
SODDED LAWN: Complete all other landscape plantings, mulching, fine grading and staking
prior to sodding lawn areas. Provide sodded lawn for all lawn areas utilizing Warren's Turf Type
Tall Fescue Sod. Apply fertilizer at a rate of 4 pounds of actual nitrogen per 1,000 square feet.
Spread topsoil over lawn areas to a depth of two inches and cultivate soil to a depth of three
inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively
fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days
beyond final acceptance by mowing and watering as required to maintain vigorous growth during
establishment period.
PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one
year after date of substantial completion against defects including death and unsatisfactory
growth, except for defects resulting from neglect by the Owner, abuse or damage by others, or
unusual phenomena or incidents which are beyond installer's control. Remove and replace
trees, shrubs or other plants found to be dead or in unhealthy condition during warranty period.
Replace trees and shrubs which are in doubtful condition at end of warranty period.
TREE SCHEDULE
KEY BOTANICAL NAME SIZE
CO
Celtis occidentalis 'Prairie Pride'
2.5" Cal.
Prairie Pride Hackberry
CZ
CG
Carpinus caroliniona
"
1.5 Cal.
CZ
American Hornbeam
1 Gal.
GT
Gleiditsia tricanthos inermis 'Skycole'
n
2.5 Cal.
Skycole Honeylocust
TO
Thuja occidentalis 'Nigro'
,
6 Ht.
CY
Dark Green Arborvitae
EP l HA HA HA
ZS
Zelkova serrato 'Green Vase'
"
2.5 Cal.
6 5 5 5 4
Green Vase Zelkova
SHRUB SCHEDULE
KEY BOTANICAL NAME SIZE
BK
Buxus x koreana 'Green Velvet'
"
18 Ht.
Green Velvet Boxwood
CZ
HA
Hydrangea arborescens 'Annabelle'
24" Ht.
CZ
Annabelle Hydrangea
1 Gal.
N
itea virginico 'Henry's Garnet`
24° Ht.
Henry's Garnet Sweetspire
JC
Juniperis chinensis 'Sea Green'
"
18 Ht.
CY
Sea Green Juniper
EP l HA HA HA
MP
Myrica pensylvanica
30" Ht.
6 5 5 5 4
Northern Bayberry
VJ
Viburnum x juddii
30' Ht.
SS
Judd's Viburnum
1 Gal.
PERENNIAL /GRASS SCHEDULE
KEY BOTANICAL NAME SIZE
CA
Calamagrostis orundinacea 'Karl Foerster'
1 Gal.
Karl Foerster Feather Reed Grass
CZ
Coreopsis verticillato 'Zagreb'
CZ
Zagreb Coreopsis
1 Gal.
EP
Echinnacea purpurea 'Kim's Knee High'
1 Gal.
Kim's Knee High Purple Coneflower
HS
Hemerocallis 'Stella de Oro'
1 Gal.
CY
Stella de Oro Daylilly
EP l HA HA HA
PH
Pennisetum alopecuroides 'Hameln'
1 Gal.
6 5 5 5 4
Dwarf Fountain Grass
O
Sedum spectabile 'Autumn Joy'
l
BK
SS
Autumn Joy Sedum
1 Gal.
NOT : THIS DRAWING WAS PREPARED FROM A HARD COPY
OF THE SITE ENGINEERING PACKAGE NOT FROM A DETAILED
AUTOCAD BASE FILE. THEREFORE ALL SITE HARDSCAPE
DIMENSIONS ARE APPROXIMATE.
BIOBARRIER® R0,
CONTROL SYSTE
"Holey Maley" says,
"DON'T DIG BLIND"
Cot Monday drat* FRdoy -7 AM to 6 PN
1 -800- 382 -5544
PER INDLW STATE LAW IS -69 -1991, R IS
AGAINST THE LAW TO EXCAVATE WITHOUT
NOTIFYING THE UNDERGROUND LOCATION SERVICE
TWO (2) WORKING DAYS BEFORE COMMENCING WORK.
3" MIN. MULCHED
1/2 WIDTH OF RC
FINISH GRAC
SUB -GRAI
Tree Planting Detail
P 10 Not to Scale
D Root Barrier Control System
P -10 Not Scale
(n
w_
>
CV
BARK MULCH I\1
i -IN -PLACE CONCRETE
HALT PAVEMENT
3ASE COARSE
310BARRIER® ROOT RS
'ONTROL SYSTEM
--- PREPARED
SUBGRADE
BARK MULCH
I -IN -PLACE
.TE
PHALT PAVEMENT
BASE COARSE
PREPARED
SUBGRADE
3110a170
PRUNE DEAD AND DAMAGED BRANCHES, NO MORE
THAN 1 /4TH OF BRANCHES. PRUNE TO SHAPE AS
NECESSARY RETAINING NORMAL PLANT SHAPE. DO
NOT CUT EVERGREEN LEADER.
WRAP ENTIRE TRUNK TO HEIGHT OF SECOND
BRANCH, TIE EVERY 6 ".
ROOT FLARE SHALL BE LEVEL WITH FINISH GRADE.
REMOVE SOIL AS NECESSARY FROM TOP OF
ROOTBALL TO EXPOSE ROOT FLARE.
TOPSOIL
CUT AND REMOVE BURLAP FROM TOP 1 /3RD OF
ROOT BALL.
PLANTING SOIL BACKFILL, SCARIFY SIDES AND
BOTTOM OF HOLE PRIOR TO PLANTING.
LOOSEN HARD SUB -GRADE
Lawn
0
JC
ic
8
PH
15
1T
� Jc
6
PH
19 i
1 I
1
IV
12
�C
C1
CA
19
PRUNE BRANCHES Ak" -A rr-
INTERNALLY BY NO
RETAINING NORMAL I
NEVER CUT OUT EVE
CUT AND REMOVE B
1 /3RD OF BALL. ALI
REMOVED FROM COIF
SCARIFIED PRIOR TO
B
P10
1
6 JC
6
LOCATION OF ROOT BARRIER INSTALLATION;
SEE DETAIL D / LP -101
Underground
Stonnwater
Detention
33
i
i
CC '
2 I
I
IV
JC
7 EP
14
TO
E6
cc
E2 CT CA
27
ZS
3
E 116th St
Path
0
CA
10
IV
5
PH
13
1T
Trash
Lawn
F�
Professional
Z S
CZ
1
Lawn
14
cli
O
:
.�
H
CY
EP l HA HA HA
CC
1
6 5 5 5 4
O
I
l
BK
U
to
v
3
>_
�
C C
_0
0
0
(
5
0
W
E
)
CU
CU
w
LIMITS OF STRUCTURAL SOIL;
Y
SEE DETAIL E / LP -101
CC
Designed By
BI
1
BK
I
-
3
L
PH
i PH
I
31
14
H
CC
EP SS
PH 7
IIU
6 11 11 11
�
0
C?
NCIS
a
o
Q
n
W
11 U
C/'
ROW—
— — — — — — — — — — —
—
Pere s
SS PH
W
�
14 Brick + 18 +Street Trees + SS
SS + +Street Trees +
IBy others)
7
7 y others)
E 116th St
Path
0
CA
10
IV
5
PH
13
1T
Trash
Lawn
F�
HS
15
1
0
0
CA
18
m
0
m
O
;
1
CO
3
BK
1 7
1
AMENDED WITH TOPSOIL TO STORM SEWER
NOTES:
INSTALLATION AND COMPACTION TO BE COMPLETED IN ACCORDANCE
WITH MANUFACTURER'S CU- STRUCTURAL SOIL' SPECIFICATIONS.
E Tree Planting Detail Using CU Structural Soil'--- A Master Landscape Plan
P -10 Not to Scale P 10 Scale:l "= 20' -0" NORTH
G R�..
Y No.
:.80860005
y STATE OF
Professional
IN-0-
v
cli
O
HS
15
1
0
0
CA
18
m
0
m
O
;
1
CO
3
BK
1 7
1
AMENDED WITH TOPSOIL TO STORM SEWER
NOTES:
INSTALLATION AND COMPACTION TO BE COMPLETED IN ACCORDANCE
WITH MANUFACTURER'S CU- STRUCTURAL SOIL' SPECIFICATIONS.
E Tree Planting Detail Using CU Structural Soil'--- A Master Landscape Plan
P -10 Not to Scale P 10 Scale:l "= 20' -0" NORTH
G R�..
Y No.
:.80860005
y STATE OF
U
Professional
cli
O
:
.�
H
CY
V
W
O
Ca
U
to
v
CU
U
0
.�
W
E
CU
CU
w
W
U
Q
Designed By
BI
Drawn By
-
I
-
L
III
H
IIU
O
�
0
C?
NCIS
a
o
Q
CIZI
W
11 U
C/'
W
�
C
w
c
N
T-
U
>
cli
O
:
.�
CY
E
O
Ca
U
to
CU
0
.�
E
CU
CU
w
W
U
Designed By
BI
Drawn By
-
Revisions
-
Project # Datc
200101 8.22.(
LP 1