Loading...
HomeMy WebLinkAboutplan-plans-23_M2.1 Mech Floor Plan.PDF7 9 � �' �� �_ �- - EF-1 , ��` _ � o �� m w � 8 �' � 12 2�2 13 10 CU-1 PARTIAL R00 F P LAN SCALE: 1/4" = 1'-0" 0 2' 4' 10 : � CU-2 CU-3 � MECHANICAL FLOOR PLAN SCALE: 1 /4" = 1'-0" 0 2' 4' 8' N A. � C. D. E. F. G. H. I. J � � � CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS AND AS REQUIRED BY CODE. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION, CONTRACT DOCUMENTS AND APPLICABLE CODES AND REGULATIONS. COORDINATE ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL AND ELECTRICAL EXISTING CONDITIONS. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE USED. THE LOCATION OF ALL ITEMS SHOWN ON THE DRAWINGS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS. DO NOT SCALE THE DRAWINGS. ALL PIPING PENETRATION THROUGH RATED WALLS SHALL BE FIRE STOPPED WITH A CODE-APPROVED PRODUCT. MECHANICAL CONTRACTOR SHALL COORDINATE ALL ELECTRICAL REQUIREMENTS AND CONNECTIONS WITH THE ELECTRICAL CONTRACTOR FOR A COMPLEfE AND OPERATIONAL INSTALLATION. ROUTE ALL EXHAUST DUCTWORK TIGHT TO THE STRUCTURE ALL EXPOSED DUCTWORK IS TO BE PAINTED TO MATCH STRUCTURE ABOVE � • � �• 12"x14" EXHAUST UP TO ROOF 2• 14"x12" VENTILATION INTAKE FROM ROOF. PROVIDE 2" IN INSULATION AROUND INTAKE DUCTWORK 3• ROUTE 1" CONDENSATE DRAIN LINE DOWN WALL AND CONNECT TO SINK DRAIN. REFER TO DETAIL #1 ON SHEET M5.1. 4. BALANCE TO 650 CFM 5. BALANCE TO 100 CFM 6. BALANCE TO 350 CFM 7• 12"x14" VENTILATION INTAKE. TERMINATE WITH GOOSENECK. REFER TO DETAIL #2 ON SHEET M5.1 $• 12"x14" EXHAUST DUCT FROM BELOW 9. FURNISH AND INSTALL EXHAUST FAN EF-1. EXHAUST FAN IS TO BE MOUNTED ON RAILS WITH SPRING ISOLATORS. DISCHARGE DUCT IS TO MATCH FAN OUTLET DIMENSIONS. 10. CONDENSING UNIT TO BE MOUNTED ON ROOF. FOLLOW MANUFACTURER'S INSTRUCTIONS FOR ROOF MOUNTING. 11. ROUTE REFRIGERANT LINES DOWN THROUGH ROOF OPENING AND CONNECT TO ASSOCIATED FAN COIL UNIT. PROVIDE OIL TRAPS AS REQUIRED AND AS PER MANUFACTURER'S RECOMMENDATIONS. 12. EXISTING ROOF OPENING. FURNISH AND INSTALL INSULATED CURB AND CURB CAP. SEAL AROUND ALL/ANY OPENINGS TO PREVENT LEAKAGE. REFER TO DETAIL #3 ON SHEET M5.1 13. DISCHARGE FROM EXHAUST FAN IS TO TERMINATE AT LEAST 10-FEET AWAY FROM VENTILATION INTAKE. TERMINATE WITH BIRDSCREEN. 14. FURNISH AND INSTALL BACKDRAFT DAMPER AT EXHAUST FAN OUTLET 15. CONSTRUCT SHEET METAL PLENUM BOX AT FAN COIL UNIT INLET. PROVIDE FILTER ACCESS AS NECESSARY 16. ROUTE 4� DRYER EXHAUST AS INDICATED AND TERMINATE WITH LOUVERED WALL CAP. EXHAUST TERMINATION IS TO BE MINIMUM 24" ABOVE STOREFRONT 17• FURNISH AND INSTALL ELECTRIC DUCT COIL EDH-1. REFER TO MANUFACTURER'S INSTRUCTIONS FOR MOUNTING AND CONNECTING EQUIPMENT. 18. FURNISH AND INSTALL CONTROLLER FOR FCU-2. CONTROLLER TO BE HONEYWELL T775 SERIES 2000 ELECTRONIC STAND-ALONE CONTROLLER WITH THE FOLLOWING OPTIONS: • 2-STAGE FAN OUTPUT FOR CONTROL OF FCU-2 • ON/OFF COOLING FOR CONTROL OF FCU-2/CU-2 • MODULATING HEAT FOR CONTROL OF SCR ON DUCT COIL EDH-1 • ROOM-MOUNTED TEMPERATURE SENSOR IN YOGA-STUDIO 109 • ROOM-MOUNTED HUMIDITY SENSOR IN YOGA-STUDIO 109 19. REMOTE TEMPERATURE SENSOR FOR FCU-2. 20. REMOTE HUMIDITY SENSOR FOR FCU-2 21. FURNISH AND INSTALL MOTORIZED DAMPER IN VENTILATION INTAKE DUCT. DAMPER IS TO BE INTERLOCKED TO OPEN WHENEVER FCU-1 IS RUNNING 22. EXPOSED EXHAUST DUCTWORK IS TO BE SLOPED DOWN AND AWAY FROM THE EXHAUST FAN. 23• 12"x12" RETURN AIR GRILLE TO BE MOUNTED ON TOP SIDE OF RETURN DUCT i L AC UIS CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM Engineer: Y% /' 9.6'.^<:ilL'!' f91.'FZ'. �'*�Y�'Yi � � �• $: �. �v4 s s' ;a� kF> � � �s By: KEY P . . . � . .:� � �- - ..- � � � �. � � ;�; Project: �� ■ � M � � � r � � �--+ . � � � � � � �+ V � � � � L � i 0 � � Z � M � � � 1 � , � • � � � • � — a� � � � U COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. m COPYRIGHT2006, 2007, 2008, 2009, 2010, 2011 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA STATE RELEASE SET Issue Date Drawn By Checked By 10/26/2012 SJO SJO Revisions: STATE RELEASE SET -11/30/2012 L'Acquis Project Number: 12226 Sheet Title: MECHANICAL F L04 R P LAN Sheet Number: ■