Loading...
HomeMy WebLinkAbout0071.97.23t ,4 44�k FOUNDATION CHECKLIST BASEMENT PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER ai_eN / .IaB NUMBER STANDARD OR REVERSED ANY NON -STD, CHANGES? FRONT OR SIDE LOAD STD., ENLARGED, OR FULL BSMT. (IN SET ') (OPT. 293) (OPT. 2%) ALL SIDING OR BRICK FRONT (IN SET •) (OPT. 4W) BSMT. WINDOW OPT. QTY. (MAW LOGATION(S) ON PRINT FRONT PORCH WALL HT, TO BE ABOVE TOP OF FTN. WALL FLUSH W/ 9 1/46 Ist FLR T.iJ's 2" ABOVE W/ Il 1/8" lot FLR. TJJ.'& V ABOVE W/ 14. 16t FLR TJ.I.'s MASONRY FIREPLACE OPT, PRE -FAB NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST SU1P PU1P LOCATION MARKED SEWER AND WATER SLEEVE LOCATIONS MARKED (3'W/ 4" SEWER SUMP PUMP SLEEVE LOCATION MARKED COUPLER 5- W/ 1 1/2- SLEEVE) MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS MARK IN FRONT P"OF —'W WALL HIGHLIGHT ALL PAD FTG. LOCATIONS '—� IF NOT ON PRINTS SLAB PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER PLAN / JOB NUMBER STANDARD OR REVERSED ANY NON -STD. CHANGES? FRONT OR SIDE LOAD ALL SIDING OR BRICK FRONT (IN SET 0) (OPT. 4W) MASONRY FIREPLACE OPT. PRE -FAB NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST MARK OUT ALL HAUNCHES NOT USED MARK IN FRONT PORCH WALLS IF NOT ON PRINTS WATER SLEEVE LOCATION MARKED HIGHLIGHT ALL THICKENED SLAB FOOTINGS HIGHLIGHT ALL PAD FOOTING LOCATIONS DO NOT REMOVE BLUEPRINTS FROM JOBSITE 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. G 3, PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. 0 E T RVLM FRAME PUNCH -OUT CHECK LIST 1. GARAGE ~ GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: 1'14T. 8' OR * WIDE- GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION: - NAILERS AT ALL CORNERS OF GARAGE AND CEILING. T GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR BOW STUDS STRAP ANCHOR NAILED CORRECTLY 2. HOUSE — C44ECK FOR BOW STUDS CHECK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE CHECK FOR CASING ROOM (MIN. 2" ON EAC" SIDE) CHECK CENTERLINE OF KITCHEN WINDOW CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" ii IVER THAN GAmo4r:TW CHECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY SIZES IN RELATION TO WALL SPACE CHECK VANITY DEPTH TO DOOR OPENING (MIN 24 1/2 ") CHECK DOOR OPERATION AND INSTALLATION CHECK WINDOW OPERATION AND INSTALLATION CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION PITCH RAIL WALL INSTALLED 1/2" BELOW STRWIER AND 1 I/2u SWORT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAORWAY8) HALF -WALL AT STAIRS PAST STRWIER 1 1/2' TUB PLATFOF 1 BUILT CORRECTLY 16 I/2" NT., 39" X 51- INSIDE NO STUDS • 24" OZ. AT CERAMIC AREAS. (16 " OTC. MAX.) TUB BLOCKS INSTALLED AT CERAMIC AREAS NAILERS FOR FIBERGLASS TUBS INSTALLED MEASURE VINYL AREAS FOR 6GIL41RE GB PANELS HAVE BLOCKS ON ENDS CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TR*49MR - STRAP ANCHORS SECURED IN HOUSE GRAM SPACE AND BASEMENT CLEANED OUT STAIRWAY SHIMMED (MAX. 1/I" GAP EACH SIDE) let AND 2nd FLOORS LINE UP IN STAIR WELL NO GAPS ABOVE STAIRWAY DRAFTSTOP STAIRWAY DROP CEILING DONE CORRECTLY (CHECK FW44T$) HANDRAIL BLOCKS INSTALLED 32" FROM STAIR N031Ncs _ SAFETY BOOTS AND RAILS NSTALLED 3 1/7u FROM STRINGER SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL- SWEET may` FLOOR SNEA,THING NAILED PER BPEC.'s FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS h �,:. _, _ EYEBOLT AND ANCHOR POINT IN PLACE ' ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS ALL TYVECK STAPLED N -PLACE EXTERIOR =: ALL HOLES PATCHED IN INSULATION BOARD ' ALL TRIM INSTALLED PER PRINT - 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES _ ALL DOORS TAPED ABOVE PRINT HUNG ON NAIL IN GARAGE j a PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN . INTERIOR AND EXTERIOR WALLS NAILED INTO TRI.ISSES, 5ELOW Y SET TU55 INTO ROOM AND WIPE -OUT = { 1 ' -- ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" 81DES" / t ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK JOIST HANGERS NAILED FRONT AND SIDES Rr SITE PICKED UP AND PUT IN PILE EACW DAY 2X4 AROUND TOP OF CHIMNEY, i 1/2" PAST CHIMNEY FLAT 4 ALL GIRDER T>kASES NAILED PER ENGINEERING y 3 f