Loading...
HomeMy WebLinkAbout0257.97.44 ! i 294" 6' -0' 6'-8" i I r — — — — — — — — — — — — — — — — — — - � I I I i i I I t i i I i I I i t I I I f I I i i I I PORG BLAB I I 4' CONIC. GAD OVER 1 1 4' MK GRAVEL FILL ! i i 1 1 i I I 1 i 1 I 21' -lei" 6' -i0%" 5' -2" c Al .. LINTEL G OVERDID • — — — — _ _ _ _ — AS RI C-0, POCKETS BY WALL CONTRACTOR - I LL I lI -- - - - - - - - - - - - - - - - - - - - — - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -L ►' I CsW4836 I 3; r - -- - - - - - - - . - - - -- - --1 � �. -------------------------------- - -.- -_ -I -- - - - - -. - - - - - - - - - - - - - - - - - - - - � I.• I -- - - - - - - - - - L9 I I I \ ► I I2' DEEP CONCRETE PAD r I I I FOR MASONRY FIREPLACE • 1 SU3°PORT FOR NAERTW AS NECE6 MY \ \ \ \ I I I _ 13,-0" J 44" I I = i I i 17 OUT P I I 8" X 9' POURED CONIC. WAI1S I I r ' 4 CONC. SLAB OVER ! / — r 4" MIN. GRAVEL FILL 2X6 BEARING WALL ( I i W/ TMCKEtE;D SLR 20' -31'2" 1444" I 3 .. ! BY FLOOR CONTRACTOR — 3" d1e POST BURIED 1 I I I IN WALL ON 36'X36"X12" PAD I ' • I l I� ►► I I - - - -I I - - - -i I I I ., - ------- -r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I -- BEAM AS REQUIRED I I I I DROP BRIGK LEDGE tFTo 1 24' BASED ON EXISTING GRADE - ----- - - - - -- - - -- ± r -- - - - - - - - - - - - - - - -- - -- - �- - I 1 ! I ►► I . I F /AC t O O WA WIS. TANK DROP FOR HVAC RUN I I BATH - - - - - - - - - - - - - - - - - - - - - - - - - -i- - - - - - - - - - - - - - - - - - - - - - - - I I i l I Q FLOOR DRAM I I i 4 to ! 8 -C It 134" d EXMV Ate DROP CONIC AS REab, POCKETS I I i , LINTEL +g OVERDID WALL " --� L T10N TO BY WALL CONTRACTOR I I AS REab, POCKETS A I I BY WALL CONTRACTOR 48'-4" B' -b" EXCAVATOR TO HOLD OVERDID TO 42' MAX- AT THIS LOCATION FOR PORCH FOUNDATION LAYOUT SCALE -1/4" - I' -0" 4 Ln N IM! I CIAR;4CSE SLAB o I t 1 Y 4' CONC. SLAB OVER p I I i N 4' MX GRAVEL FILL I I N I I I m I f w I 1 I I I L I I i I i I i i I I I i I t I I I i I I I I t I I I I t I I I i i I I i I i i -- - - - - - - - - - - - - - - -I I I 1- - - - - - - - - - - - - - - - - t i DROP I COURSE 0 ALL OPENINGS k 1 —4 ------ I---------------------- -- 4---- - - --'j 4'-21'2" i 16' -3" 1 4' -2V2" 5' -lib" Q fV HOTES• 0 ALL SOS. BAG? ON 3000 PA,L 2) ALL CONCRETE MIH. 3000 PBJ, tr 20 DAYS. 3) ALL FOOTINGS ARE 16' ODE X 8' DEEP MUMS NOTED OTFEIllUISE, 4) ALL WALLS ARE 8' TWICK W/ SAGNMENT WALL WT. AS NOTED AND "RAGE/ CRAK./ 6LAB VAI1.6 Y'-8' w*w uNLm NOTED orAmtmL 5) TIE CONTRACTOR GWALL VERIFY ALL COWTIONS AND illUDGE FOR TWEMOLVES T14E SWxTABLITY OF TI4E PLANS IN RELAWNSW TO TW VA Gm 6) DRAWINGS SIIRVE AS A GUIDE TO IM CONSTRUCTION OF TIE BUILDING, AND IN NO WAY DICTATE ANY OF TNE LOCAL AND / OR STATE BU3LOM COM, TW@REFOR IT IS TIC CONTRACTORS RESPONSOLITY TO REVEW ALL PLANET FOR ACCURACY AND CLARITY AND TO MIRE THAT ALL GU BS ARE CLEAR AS TO THE SCOPE OF TWER WORK. TWE CONTRACTOR ULL ASSUME ALL RESPONMILITY FOR ERRORS OR OMISSIONS IN DESIGN OR DISN&I", 1) ALL STRUCTURAL. MiEMIlIRS AND BEAMS, ARE BASED ON AN ASSUME NEW, CONTRACTOR TO VERIFY ACTUAL NEEDS AND 6M IF NOT SWONK 111 11.1 111 I NI Q c C woe DATE: 0312-8 DRAWN BTU J.FIp►,k, bGALE� AS SR mumommosowmwo R I IONB: SWEET I 13'-4' � 3= ' -0" � 8, �" Ice ; I ► 2X6 BEARING WALL i I o I I Q W/ THICKENED SLAB I I = �^ e BY FLOOR CONTRACTOR I C-4 ► I f ! �-- I I N ... - - - -- -- - -1 -$p - - - - - - - - --i I I - - - - - 1 I I LIECTION PIT t ► FORM AND DROP SLAB UP 15 . , ► i I 48 THIS AREA AS SHOWN bump I_ - - - - - - - - - - - - - - - - - - - - - - - - - - - -• I I ICI - - - - _ _ _ _ - - - - - - - - - - - '" r - - - - - - ___ - - - - - I I ► I PORCH SLAB OF SAAAa t N I I ► it 10'-20 1 left Id -0n - 1 Q - SEWER OUT - - - m -- I 1 I -- 1 o e - — LINTEL90VERDIG i I t--- - - - - - - - - - - - - - - - - - - - -1— i 4 to ! 8 -C It 134" d EXMV Ate DROP CONIC AS REab, POCKETS I I i , LINTEL +g OVERDID WALL " --� L T10N TO BY WALL CONTRACTOR I I AS REab, POCKETS A I I BY WALL CONTRACTOR 48'-4" B' -b" EXCAVATOR TO HOLD OVERDID TO 42' MAX- AT THIS LOCATION FOR PORCH FOUNDATION LAYOUT SCALE -1/4" - I' -0" 4 Ln N IM! I CIAR;4CSE SLAB o I t 1 Y 4' CONC. SLAB OVER p I I i N 4' MX GRAVEL FILL I I N I I I m I f w I 1 I I I L I I i I i I i i I I I i I t I I I i I I I I t I I I I t I I I i i I I i I i i -- - - - - - - - - - - - - - - -I I I 1- - - - - - - - - - - - - - - - - t i DROP I COURSE 0 ALL OPENINGS k 1 —4 ------ I---------------------- -- 4---- - - --'j 4'-21'2" i 16' -3" 1 4' -2V2" 5' -lib" Q fV HOTES• 0 ALL SOS. BAG? ON 3000 PA,L 2) ALL CONCRETE MIH. 3000 PBJ, tr 20 DAYS. 3) ALL FOOTINGS ARE 16' ODE X 8' DEEP MUMS NOTED OTFEIllUISE, 4) ALL WALLS ARE 8' TWICK W/ SAGNMENT WALL WT. AS NOTED AND "RAGE/ CRAK./ 6LAB VAI1.6 Y'-8' w*w uNLm NOTED orAmtmL 5) TIE CONTRACTOR GWALL VERIFY ALL COWTIONS AND illUDGE FOR TWEMOLVES T14E SWxTABLITY OF TI4E PLANS IN RELAWNSW TO TW VA Gm 6) DRAWINGS SIIRVE AS A GUIDE TO IM CONSTRUCTION OF TIE BUILDING, AND IN NO WAY DICTATE ANY OF TNE LOCAL AND / OR STATE BU3LOM COM, TW@REFOR IT IS TIC CONTRACTORS RESPONSOLITY TO REVEW ALL PLANET FOR ACCURACY AND CLARITY AND TO MIRE THAT ALL GU BS ARE CLEAR AS TO THE SCOPE OF TWER WORK. TWE CONTRACTOR ULL ASSUME ALL RESPONMILITY FOR ERRORS OR OMISSIONS IN DESIGN OR DISN&I", 1) ALL STRUCTURAL. MiEMIlIRS AND BEAMS, ARE BASED ON AN ASSUME NEW, CONTRACTOR TO VERIFY ACTUAL NEEDS AND 6M IF NOT SWONK 111 11.1 111 I NI Q c C woe DATE: 0312-8 DRAWN BTU J.FIp►,k, bGALE� AS SR mumommosowmwo R I IONB: SWEET