Loading...
HomeMy WebLinkAbout0363.97.15S U P E R V I S 0 R W R K H E E T D FOUNDATION CHECKLIST FRAME PUNCH -OUT CH K LIST BASEMENT SLAB 1. GARAGE GARAGE DOOR OPENING FRAMED TO CC E SIZE: Z' HT., S' OR 16' WIDE. PROJECT INFORMATION PROJECT INFORMATION GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. NAILERS AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR HOUSE NAME / ELEV. HOUSE NAME / ELEV. BOW - P AN STRAP ANCHOR NAILED CORRECTLY SET NUMBER SET NUMBER 2. HOUSE CHECK FOR BOW STUDS ' PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE STANDARD OR REVERSED STANDARD OR REVERSED CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY SIZES IN RELATION TO WALL SPACE FRONT OR SIDE LOAD FRONT OR SIDE LOAD CHECK VANITY DEPTH TO DOOR OPENING (MIN. 241/2") CHECK DOOR OPERATION AND INSTALLATION STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT CHECK WINDOW OPER'A'TION AND INSTALLATION CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION (IN SET •) (OPT. 293) (OPT. 295) (IN SET M) (OPT. 490) -- PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 11/2" SHORT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) ALL SIDING OR BRICK FRONT MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 1!2" (IN SET 10) (OPT. 49m) FIREPLACE OPT. PRE -FAB TUB PLATFORM BUILT CORRECTLY ib 1/2" HT., 39" X 51" INSIDE BSMT. WINDOW OPT. QTY■ NO STUDS 0 24" O.C. AT CERAMIC AREAS. (I6" O.C. MAX.) NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES TUB BLOCKS INSTALLED AT CERAMIC AREAS. (MARK LOCATION(S) ON PRINT BUILDING PERMIT NUMBER HAILERS FOR FIBERGLASS CUBS INSTALLED FRONT PORCH WALL HT. TO BE MEASURE VINYL Af;a=-AB FOR SQUARE ABOVE TOP OF FTN. WALL CB PANELS HAVE BLOCKS ON ENDS LOT ADDRESS CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER FLUSH W/ c31/4" let FLR t J.l.'s 2" ABOVE W/ it 1 /5" let FLR T.J.L's 6" ABOVE W/ 14" let FLR T.J.i.'s STRAP ANCHORS SECURED IN HOUSE MASONRY CRAWL SPACE AND BASEMENT CLEANED OUT FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX. 1/2" GAP EAC4 SIDE) let AND 2nd FLOORS LINE UP IN STAIR WELL NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES — __._^_ NO GAPS ABOVE STAIRWAY DRAFTSTOP BUILDING PERMIT NUMBER STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) FROM STAIR NOSING _.� HANDRAIL BLOCKS INSTALLED 32" SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER LOT ADDRESS CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND T.J.I. DETAIL SHEET FLOOR SHEATHING NAILED PER SPEC.'S TOWNSHIP MARK OUT ALL HAUNCHES NOT USED FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE CHECKLIST WATER SLEEVE LOCATION MARKED _ ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS ALL TYVECK STAPLED IN -PLACE EXTERIOR SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEV E �._ HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL HOLES PATCHED IN INSULATION BOARD LOCATIONS MARKED (3'W/ 4" SEWER SUMP PUMP SLEEVE LOCATION MARKED COUPLER, 5'W/ 1 1/2" SLEEVE) HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL TRIM INSTALLED PER PRINT MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS BEAM TAKEOFF SHEET COMPETE AND TUNED IN TO FOUNDATION SUPERVISOR 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES IF NOT ON PRINTS ALL DOORS TAPED ABOVE BEAM TAKE -OFF SHEET COMPETE AND TURNED IN PRINT NUNCx ON NAIL IN GARAGE TO FOUNDATION SUPERVISOR (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN ` D O NOT R E M V E O BLUEPRINTS FROM J O B S I T E INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW SET TUBS INTO ROOM AND WIPE -OUT 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES AND o ALL WINDOWS INSTALLED PER PRINT, ELEVATION STACK 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. JOIST HANGERS NAILED FRONT AND SIDES SITE PICKED UP AND PUT N PILE EACH DAY � 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 2X4 AROUND TOP OF CHIMNEY, 1 V2" PAST CHIMNEY FLAT ALL GIRDER TRUSSES NAILED PER ENGINEERING u 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. REVISED 3n1r11 AP