S U P E R V I S 0 R W O R K S H E E T
RYLAND
FOUNDATION CHECKLIST
FRAME PUNCH -OUT CHECK LIST
BASEMENT
SLAB
1. GARAGE
GARAGE DOOR OPENING FRAMED TO CORRECT 51ZE: ?' HT., 8' OR lb' WIDE.
PROJECT INFORMATION
PROJECT INFORMATION
_ _ GARAGE ATTIC ACCESS FRAMED TO CORRECT 61ZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
_ -__ -- GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
HOUSE NAME / ELEV.
HOUSE NAME / ELEV.
_ _- BOW STUDS
_ STRAP ANCHOR NAILED CORRECTLY
SET NUMBER
SET NUMBER
2. HOUSE
PLAN / JOB NUMBER
PLAN / JOB NUMBER
_ CHECK FOR BOW STUDS
CHECK FOR NAILERS
-_ MARK DOOR SWING DIRECTION AND SIZE
STANDARD OR REVERSED
STANDARD OR REVERSED
C-HECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
ANY NON -STD. CHANGES?
ANY NON -STD. CHANGES?
CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CAE3I14ETS)
CHECK WALL SIZE5 IN RELATION TO CABINET SPACE
- CHECK VANITY SIZE5 IN RELATION TO WALL SPACE
FRONT OR SIDE LOAD
FRONT OR SIDE LOAD
CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1,'2 ") .0
CHECK DOOR OPERATION AND INSTALLATION
STD., ENLARGED, OR FULL BSMT.
ALL SIDING OR BRICK FRONT
CHECK WINDOW OPERATION AND INSTALLATION
(!N SET ") COPT. 2931 (OPT. 295)
(IN SET "i (OPT. 4W)
— CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
�
-- PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SNORT
ALL SIDING OR BRICK FRONT
HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
MASONRY
- -- HALF -WALL AT STAIRS PAST STRINGER 1 I/2"
(IN SET ") (OPT. 490)
FIREPLACE OPT. PRE -FAB
- -- TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE
WINDOW OPT. QTY.
BSMT.LOCATION(5)
NO STUDS A 24" O.G. AT CERAMIC AREAS. (Ib" OTC. MAX.)
NOTE: INSTAL BRICK SEDGE ON MASONRY FIREPLACES
_ _ TUB BLOCKS INSTALLED AT CERAMIC AREAS.
(MARK ON PRINT
BUILDING PERMIT NUMBER
NAILERS FOR FIBERGLASS TUBS INSTALLED
FRONT PORCH WALL HT. T O BE
MEASURE VINYL AREAS FOR SQUARE
ABOVE TOP OF FTN. WALL
GB PANELS HAVE BLOCKS ON ENDS
'TR
LOT ADDRESS
- -- CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD 048F'ER
„ 7 "
FLUSH W/ 9 1/4 let FLR J.L's 2 ABOVE W/ 11 1/8 lst FLR T J.I. e b' ABOVE L/ 14 Rat FLR T J.I_'a
STRAP ANCHORS SECURED IN HOUSE
MASONRY
CRAWL SPACE AND BASEMENT GLEANED OUT
FIREPLACE OPT. PRE -FAB
TOWNSHIP
-- STAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE)
lat AND 2nd FLOORS LINE UP IN STAIR WELL
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
__ —_ NO GAPS ABOVE STAIRWAY DRAFTSTOP
BUILDING PERMIT NUMBER
STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
LOT ADDRESS
SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER
AND TJ.I. SHEET
CHECKLIST
SQUASH BLOCKS INSTALLED PER PLAN DETAIL
- --
FLOOR 5HEATHING NAILED PER SPEC.'S
TOWNSHIP
^1.4RK OUT ALL LiAUNCHES NOT USED
— FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
IN FRONT PORCH WALLS IF NOT ON PRINTS
_ EYEBOLT AND ANCHOR POINT IN PLACE
CHECKLIST
_ W +TER SLEEVE LOCATION `'ARKED
____— ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
- HIGHLIGHT ALL THIGKEINEC SLAB FCOT'NGS
- -___ ALL TYVECK STAPLED IN -PLACE EXTERIOR
SUM P Pl;MF LOCATION MARKED _ SEWER AND WATER SLEEVE
_ -_ ALL HOLES PATCHED IN INSULATION BOARD
LOCATIONS MARKED (3' Wi 4" SEWER
SUMP PUMP SLEEVE LOCATION MARKED COUPLER, 5' WI 1 1/2" SLEEVE)
- -- HlriHLiG+-IT ALL PAC FOOTING LOCATIONS
_ ALL TRIM INSTALLED PER PRINT
MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS
- --
-- - BEA' -1 TAKE -OFF SHEET C X -TPLTE AND TURNED 1N
TO FOUNDATION SUPERVISOR
3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS
_ MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS
(TO BE COMPLTED EVEN IF NO BEAMS REQUiRED)
ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
IF NOT ON PRINTS
ALL DOORS TAPED ABOVE
-— BEAM TAKE -OFF SHEET COMPLTE AND TURNED IN
PRINT HUNG ON NAIL IN GARAGE
TO FOUNDATION SUPERVISOR
(TO BE GOMPLTED EVEN IF NO BEAMS REQUIRED )
_
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
DO NOT REMOVE BLUEPRINTS FROM JOBSITE
-{ _ INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
SET TUBS INTO ROOM AND WIPE -OUT
1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. �
ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
4
S, 2. WALL CONTRACTOR LEAVE ON TOP OF WALL.
JOIST HANGERS NAILED FRONT ANC SIDES
, _
SITE PICKED UP AND PUT IN PILE EACH DAY
F-
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL.
2X4 AROUND TOP OF CHIMNEY, 1 112" PAST CHIMNEY FLAT
-. ALL GIRDER TRUSSES NAILED PER ENGINEERING
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL.
REVtSEF3 3f?�9i
i
l
T
7