Loading...
HomeMy WebLinkAbout0001.97.82ND FLOOR ROUGH FR,4MING NOTES: 1. USE (2) 2 X 4 CRIPPLES UNDER EACH END OF HEADER FOR OPENINGS 8' -0' OR GREATER IN WIDTH. 2. REFER TO MECHANICAL PLAN FOR BULKHEAD AND DROP CEILING LOCATIONS. 3. ALL BEAMS TO HAVE MINIMUM (2) 2 X 4 STUDS UNDER EACH END FOR BEARING SUPPORT. 4. PROVIDE (2) 2 X 10 HEADER AT FIREPLACE OPENING. 5. ALL WALLS TO BE 2 X 4 STUDS AT 16' O.C. UNLESS NOTED OTPERWI5E. Co. ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP. 1. STANDARD HEADER HEIGHT TO BE AT 8' -10/8' AFF. (U.N.O.). 8. FINISH FLOOR REFERENCES ARE TO FINISH CONCRETE FLOOR FOR SLAB PLANS AND TO TOP OF DECKING FOR CRAWL, PARTIAL BASEMENT, AND FULL BASEMENT PLANS. .150 WINDOW SCHEDULE FLOOR ROOM WINDOW R/O ONTY. 2ND ENTRY cw2812 -2 wd. casement -FIX 51.88'x12.5' 1 BONUS RP'I. dw2828 dbl, hung 34'xro5. -15' I BR. 02 dw4024dbl. hung 4Co'x5115' I BR. 03 dw2828 dbl, hung 34'xro515' 2 BR. 04 dw4024 dbl. hung 4h'x51.15' I MSTR. BR. REAR dw2828 -3 dbl. hung 100.63'x10515' 1 M5TR. BATH dw2024 -29a dbl. hg. 51.5'x".5715' 1 ATTIC dw2828 dbl, hung 34'x65.15' I BATH dw2024 dbl. hung 2ro'x 5115' 1 I. Lim t-:>o r; p £ r*4 1 nJ 64 To 5f- Q9 1Al7 L. r R N 2' -4' 1' -8' 41' -1' ro' -8' III ' v^ i esms D v �-j 924 INDI (3 N