HomeMy WebLinkAbout0001.97.82ND FLOOR ROUGH FR,4MING NOTES:
1. USE (2) 2 X 4 CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS 8' -0' OR GREATER IN WIDTH.
2. REFER TO MECHANICAL PLAN FOR BULKHEAD AND
DROP CEILING LOCATIONS.
3. ALL BEAMS TO HAVE MINIMUM (2) 2 X 4 STUDS UNDER
EACH END FOR BEARING SUPPORT.
4. PROVIDE (2) 2 X 10 HEADER AT FIREPLACE OPENING.
5. ALL WALLS TO BE 2 X 4 STUDS AT 16' O.C. UNLESS
NOTED OTPERWI5E.
Co. ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP.
1. STANDARD HEADER HEIGHT TO BE AT 8' -10/8' AFF. (U.N.O.).
8. FINISH FLOOR REFERENCES ARE TO FINISH CONCRETE FLOOR
FOR SLAB PLANS AND TO TOP OF DECKING FOR CRAWL,
PARTIAL BASEMENT, AND FULL BASEMENT PLANS.
.150 WINDOW SCHEDULE
FLOOR
ROOM
WINDOW
R/O
ONTY.
2ND
ENTRY
cw2812 -2 wd. casement -FIX
51.88'x12.5'
1
BONUS RP'I.
dw2828 dbl, hung
34'xro5. -15'
I
BR. 02
dw4024dbl. hung
4Co'x5115'
I
BR. 03
dw2828 dbl, hung
34'xro515'
2
BR. 04
dw4024 dbl. hung
4h'x51.15'
I
MSTR. BR. REAR
dw2828 -3 dbl. hung
100.63'x10515'
1
M5TR. BATH
dw2024 -29a dbl. hg.
51.5'x".5715'
1
ATTIC
dw2828 dbl, hung
34'x65.15'
I
BATH
dw2024 dbl. hung
2ro'x 5115'
1
I. Lim t-:>o r; p £ r*4 1 nJ 64 To 5f-
Q9 1Al7 L.
r
R
N
2' -4'
1' -8'
41' -1'
ro' -8'
III ' v^
i
esms
D v
�-j 924
INDI
(3
N