HomeMy WebLinkAboutPorte Cochere renovation approval 2-6-20131
Conn, Angelina V
From:Conn, Angelina V
Sent:Wednesday, February 06, 2013 9:27 AM
To:'Bill Malarski'
Cc:Scott@ctr-line.com; 'Rolf Tweeten'; 'Mark Antolik'; 'Robert Utz'; Mishler, Nicholas F;
Blanchard, Jim E
Subject:RE: Holiday Inn Carmel Porte Cochere Renovation - 251 Pennsylvania Pkwy
Attachments:NW Corner-Wide.jpg; Holiday Inn Porte Cochere 1-25-13.pdf
Good morning, Bill –
These proposed changes to the porte cochere have now been reviewed and approved administratively by the Planning
& Zoning Dept. Please retain a copy of this email for your records, and please continue to work with the Carmel Building
Permits Dept. to gain approvals for any remodel or building permits needed.
Thank you, and have a great day.
Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Bill Malarski [mailto:Bill@ctr-line.com]
Sent: Monday, February 04, 2013 3:12 PM
To: Conn, Angelina V
Cc: Scott@ctr-line.com; 'Rolf Tweeten'; 'Mark Antolik'; 'Robert Utz'
Subject: Holiday Inn Carmel Porte Cochere Renovation
Angie,
Per our voice mail this morning, attached are some photos and plans for the porte cochere renovation
planned for the Holiday Inn at 251 Pennsylvania Parkway.
There are three photos from a distance showing the existing porte cochere and its relationship to the
rest of the building. I have also attached the preliminary construction drawings showing the proposed
renovations:
The bottom is to be raised from just under 11'-0" to allow 12'-8" clearance per new franchisee
requirements
The arch and "steeple" above are being removed and being replaced by a classical style
pediment façade type wall with straight lintel.
The existing "block" columns are being stripped of EIFS and rebuilt with a square profile in
EIFS but with stone bases. There will be a vertical reveal in each face of the new columns.
There will be no work to the existing roof or overall footprint of the porte cochere, except where
the new façade requires it..
Colors and stone materials will match the newly installed and painted colors approved by
Carmel last fall (and shown in the attached photos).
Final drawings will be issued in the next few days.
2
Hopefully Carmel can approve this package like our previous submittal last fall. Please review and
comment.
Thanks for your time with this.
Thanks,
Bill Malarski
645 Tollgate, Suite 110
Elgin, IL 60123
(T) 847.531.4450 x 20
(F) 847.531.4444
bill@ctr-line.com
F:
\
2
0
1
1
\
L
e
e
\
1
1
-
L
E
-
0
1
\
1
1
L
E
0
1
-
A
D
0
2
0
4
.
d
w
g
1/
2
5
/
2
0
1
3
No.Description Date
SEAL
DEVELOPER
PROJECT NAME
CONSULTANTS
E
D
C
B
A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F 11-LE-01
JANUARY 25, 2013
Scale
Project number
Date
Drawn by
Checked by
HOLIDAY INN
CONVERSION
Loc.# 15876
251 Pennsylvania Pkwy
Carmel, IN 46280
ALLIANCE
HOSPITALITY
5811 Glenwood Avenue, Ste. 300
Raleigh, NC 27612
a r c h i t ec t u r e
E
C
B
A
F
3/16' = 1'-0"
SCALE:
2
AD2.04
DEMOLITION
CANOPY ELEVATION
1/4" = 1'-0"SCALE:
1
AD2.04
DEMOLITION
CANOPY ELEVATION
1/4" = 1'-0"
SCALE:
A
AD2.04
DEMOLITION
CANOPY SECTION
1/4" = 1'-0"
F:
\
2
0
1
1
\
L
e
e
\
1
1
-
L
E
-
0
1
\
1
1
L
E
0
1
-
A
D
0
4
0
3
.
d
w
g
1/
2
5
/
2
0
1
3
No.Description Date
SEAL
DEVELOPER
PROJECT NAME
CONSULTANTS
E
D
C
B
A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F 11-LE-01
JANUARY 16, 2013
Scale
Project number
Date
Drawn by
Checked by
HOLIDAY INN
CONVERSION
Loc.# 15876
251 Pennsylvania Pkwy
Carmel, IN 46280
ALLIANCE
HOSPITALITY
5811 Glenwood Avenue, Ste. 300
Raleigh, NC 27612
a r c h i t ec t u r e
E
C
B
A
F
3/16' = 1'-0"
SCALE:
3
AD4.03
DEMOLITION
WALL SECTION
3/4" = 1'-0"SCALE:
2
AD4.03
DEMOLITION
WALL SECTION
3/4" = 1'-0"SCALE:
1
AD4.03
DEMOLITION
WALL SECTION
3/4" = 1'-0"
F:
\
2
0
1
1
\
L
e
e
\
1
1
-
L
E
-
0
1
\
1
1
L
E
0
1
-
A
0
2
0
4
.
d
w
g
1/
2
5
/
2
0
1
3
No.Description Date
SEAL
DEVELOPER
PROJECT NAME
CONSULTANTS
E
D
C
B
A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F 11-LE-01
JANUARY 25, 2013
Scale
Project number
Date
Drawn by
Checked by
HOLIDAY INN
CONVERSION
Loc.# 15876
251 Pennsylvania Pkwy
Carmel, IN 46280
ALLIANCE
HOSPITALITY
5811 Glenwood Avenue, Ste. 300
Raleigh, NC 27612
a r c h i t ec t u r e
E
C
B
A
F
3/16' = 1'-0"
SCALE:
2
A2.04
CANOPY ELEVATION
1/4" = 1'-0"SCALE:
1
A2.04
CANOPY ELEVATION
1/4" = 1'-0"
SCALE:
A
A2.04
CANOPY SECTION
1/4" = 1'-0"
F:
\
2
0
1
1
\
L
e
e
\
1
1
-
L
E
-
0
1
\
1
1
L
E
0
1
-
A
0
4
0
3
.
d
w
g
1/
2
5
/
2
0
1
3
No.Description Date
SEAL
DEVELOPER
PROJECT NAME
CONSULTANTS
E
D
C
B
A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F 11-LE-01
JANUARY 25, 2013
Scale
Project number
Date
Drawn by
Checked by
HOLIDAY INN
CONVERSION
Loc.# 15876
251 Pennsylvania Pkwy
Carmel, IN 46280
ALLIANCE
HOSPITALITY
5811 Glenwood Avenue, Ste. 300
Raleigh, NC 27612
a r c h i t ec t u r e
E
C
B
A
F
3/16' = 1'-0"
SCALE:
A
A4.03
STONE WALL DETAIL
1 1/2" = 1'-0"
SCALE:
3
A4.03
WALL SECTION
3/4" = 1'-0"SCALE:
2
A4.03
WALL SECTION
3/4" = 1'-0"SCALE:
1
A4.03
WALL SECTION
3/4" = 1'-0"