HomeMy WebLinkAbout1126.95.3t
SYMBOL
DESCRIPTION
MAN:UF-
SOIL oft WASTE (W.)
VENT (V.)
*4"
*
NFWH
&PLEADER (RL)
S ---
fit -i r
At
..
120' NOT WATER (HW)
..
12O' NOT WATER RETURN (HWR)
160'
160' NOT WATER (160' Mill)
-160' ---
160' NOT WATER RETURN (160r HWR)
L
THREE PIECE FULL PORT BALL VALVE
WCO
OR BALANCING COCK
";
A-
,1
1;
--.- -� JE -
W-1
�M
All
1u .
C
T� I�
L
1
All
1 r
b ifOZ.--,
t'j 002 �tlx/
-5-66 FLtZ . f;k
PLUMBING LEGEND
SYMBOL
DESCRIPTION
MAN:UF-
SOIL oft WASTE (W.)
VENT (V.)
*
NFWH
&PLEADER (RL)
S ---
STORM DRAIN (SO)
COLD MATER (CW)
..
120' NOT WATER (HW)
..
12O' NOT WATER RETURN (HWR)
160'
160' NOT WATER (160' Mill)
-160' ---
160' NOT WATER RETURN (160r HWR)
L
THREE PIECE FULL PORT BALL VALVE
WCO
OR BALANCING COCK
WADE
GATE VALVE
--.- -� JE -
CHECK VALVE
.---- ��-- --
UNION
T
LINE FROM TRAP PRIMER
F.C.O.
FLOOR CLEANOUT
G.C.O.
GRADE CLEANOUT
W.C.O.
WALL CLEANOUT
F.D.
FLOOR DRAIN
R.D.
ROOF DRAIN
L -i
PLUMBING FIXTURE
NF WH
NON- FREEZE WALL HYDRANT
NB
HOSE 8188
RPBP
BACKFLOW PREI/ENTTR
V.T.R.
VENT THRU ROOF
AL BALM" MG VALVES ON NOT WATER RETURN WiALL BE .t QUWM
VnTH MEMORY STOPS
1 - (TTr.) VALVE
(TYPICAL) _\
n tf
i
Ale.ZcM0ejr_' wpr
F-10.. ►z1�
140
�
K i ¢�
�aS..��lr�•
vt WC£' Xzis Gov Tv i
r \ •LL Don `�Y�•L.Y� ��1.¢i.
z�1Ipul.�r�
ter✓ F�-� �t�J _
\/ 19"oj 6J4 ArZlEk
il dospcA.��
DRAIN, CLEANOUT AND HYDRANT SC14EIDULt
SYMBOL
FIXTURE
MAN:UF-
DESCRIPTION
YooEL a SERIES. NOM- �iREEIE AMn -SIPNaM
NFWH
M1ft1R T
WOODFORD
WALL HYDRANt wire+ eR01IZE CASM &
NIEARAL BACKft.OW' PREiIENTER
W-4030 CAST WH CIZANOW WM
FCO
nAM
CLEAHOUT
WAX
SECURED SCONAM cam - PRd1ADE
CLEANOW LOCM►TIOR N CARPETED AREAS
% W- 6430 -0 MR DRY OR 0= 'WALL,
WCO
WALL
WADE
COIISTRtK110N OR / W -0400- 130 -C FOR
PLASUM Olt THE WALL CONSMICTM
GRADE
/ W- 4030 -I CAST IRON C.O. WN LOOSE SET
GCO
WADE
TRACTOR TOP SET IM trxl2rxr CONCRETE PAD
/ W- 1100 -0 CAST iR'OM FLOOR DRAW MW Ir
FD- i
FLOOR
WADE
1r HKZEL IONZ1< STRAINER AMID 0 27
011
FD -2
FLOOR
MADE/
CAW atoll DRAM WITH DOME STPAM
HOSE
/ 2!3 CiIIOME RAM HOSE M W"
HB
W08
CHICAGO
F E27 SPOUT OUTLET VACUUM BREAKER
NO -S-0T REOtXU PRESSURE PRINCIPLE TYPE
RPBP
WATTS
w //t
R
P00RT SUL VAL� SLW►LLVES
TRAP
/ W -2400 -143 CHROME f LATED TRAP PRIMER
PRIMER
WADE
VALVE VRTH VACUTA/ 6REA11=
ROOF
W-3000 CAST IRON ROOF DRAIN W/UHOER
RO
DUN
WADE
O= CLAMS AND Sx-' LEAD FLASHING
CONTRACTOR TO VERIFY ROUGH -lN REOtNEMEH15
Of SELECTED EQUIPMENT w/ OWNER PRIOR TO
COMMENCING ANY WORK FOR LAUHDRY EOUIPMENT.
161
1 `1
1 "(TYP.)
NOSE THREADED
WATER CONNECTIONS
(TYPICAL)
W,_..i SH =R CONNECTION DETAIL
NOT TO SCALE
1. PROVIDE TRAP PRIMERS FOR FLOOR ORANS M Pt*M TdN;ET'S, LAUHM AM MECH. RMS.
LOCATE TRAP PRIMER VALVE AT NEAREST I,AV. 09 SMt AM RUN 1 /r Ir COPPER TO
FLOOR DRA L PROVIDE FLOOR D"N W/ TRAP P OMER CONNEC"OH. ALL EXPOSED
PrMG SHALL BE KEPT TO A MRMUM AIR) SMALL K CHROME PLATED.
2. ALL FLOOR CLEANOM 1N CARPETED AREAS SHALL aE PROV 0ED WITH CARPET MARION
CAPPED
WATTS / U58 PRv
(TYPICAL)
WADE W -20 SWWSTOP
(TYPIC-4J
ESCUTCR
PLATE
1- It 1- x 1 /1i ANKES ANCHORED TO--' W
EACH SIDE OF TROUGH ON EACH
SIDE OF 11tWVABU IM TRAP r
FAMCATIA OF 1- x i /i< FLAT
ALUM. MA ME (1 Y x 12') W/ A32'
WIRE SCREEt1. 10 MESH.
mm
SEE ARCHITECTURAL AND STRUCTURAL PLANS
FOR DUCT DIMENSIONS OF TRENCH.
WAn5iffiR IRENCH DETAIL.
1/E' CAST Cff !0
DROP - M
jC FD-2
NVG '
I
Yl
T'
1c
I,crr
i
01
I
I
N
,u1 i
I it
1
� �G(,Ky► � tit r L ��
PLUMBING NOTES:
1. these drawings are diagrammatic and show general plumbing
layouts and pipe routing and are for bidding purposes only.
2. alt work shalt conform to the plumloing c , local and
state budding codes and health regulallons having jurisdiction.
3. contractor shall obtain all field approvals and permits from
governing agencies as required.
4. rough -in and make tint connections to oil food prep equipment
coordinate with equipment supplier for all rough -ins.
3. furnish and /or install all necessary valves, traps, flow
controls, filters, bockflow presenters, faucets, stops. failpieces.
vacuum breakers, etc. if not furnished on or wit
6. furnish and install hand shut -off valves on all hot and cold
water tines at stub -in and as shown on pions.
7. hold water a minimum of six Inches above floor.
a. insutale all indirect drain Una from ice machines, refigerators,
twos equipment, efr_ with one Inch thick ftbergkm.
9. furnish and install water and drain piping from all food prep.
equipment whether or not shown on draw s.
10. furnish and install approved chrome plated fype vacuum
breakers where required by code and as shown on drawings.
11. contractor shall verify all flow lines prior to roughing in.
12. contractor may re- layout to his advantage code equivalent
plumbing to as to reduce Installation costs or to rerouie to
avoid conflicts with other trades after first receiving approval
of architect /on9lneer.
13. plumbing contractor shall coordinate with electrical contract-
or all voltages. electrical loads, etc. of all electrically
operated equipment prior to ordering equipment.
14. see architectural and stucturol drawings for ail building
dimensions, details, elevations and exact location of plumbing
fixtures.
15. plumbing contractor shall coordinate with amhHectural,
structural, electrical hvac and all other trades for pipe
roufMg and equipment Placement. ovoid interference with
architectural, features, footings, windows, sic. notify architect
16.
17.
18. pr a ufactured compe6ble pipe hangers, rods and inserts,
or clamps for the proper srppori of all piping.
19. band Iron, tie wire. metal stropping or wire strapping will not be
permitted.
20. provide suitable backing and support for all equipment.
21. p vibration and /or pipe Wray will not be permitted.
22. all vtr's shall be a minimum of 15'-d' or as required by code
from a/c intakes.
23. offset all vies as required whether or not shown on drawings.
24. provide all vir's with 4 lb. Ngh boot food flashing.
{ 23.
26. plumbing contractor shoN furnish access panels to be
insfalled by general confrocior as regWred for plumbing
Installations. all valves and shokstaps shall t» oocssible
27. off water piping in exterior waits shall be run between gypboard
and insulation to prevent fneztng. ui coordinate
211. provide opening for drains torn hvac eq pm4wd.
location ;with hvac contractor. furnish
29. upon completion of the work covered by this contract.
the owner with one complob set of reproducible "as -butli
drawings which show all pltmbiri;q installod under this contract.
0
CONTROL PANEL
18" CONC. PiPE
V, BALL VALVE & CHECK VALVE
TO TEE ABV. TRAP
ON FLOOR DRAIN
2" OUTLET
1 1 /4" DISCHARGE LINE
PUMP
6" THICK CONC. BASE ----- r ' ""
SUMP 'UMP DETAIL
NOT TO SCALE