HomeMy WebLinkAbout05050155-As builtTHE E×ISTINc :CURB :,~ND:
ASPHALT FROM SECTION
MUST BE SAW CUTTo
PROVIDE A SMOOTH
TRANSfflON7:
100.00
26' D.&U.E.
25 BSL
~0% ~2o. oo'
914.8
25' D.&:U:E.
915.8
5 D.U.&S.E
25'
E
29 / t
915.7
25' D.U.
915.1
COOK
INST. #2C
A.V.D.
ED "LEE
BRASS CONTROL STATION
SET IN THE TOP OF A
QUARTER OF THE
EARTHWORK:
1. EXCAVATION
A, Excevatea meter
B. PrOVide and
required on
sOUrce dpproved
fill needed.