Loading...
HomeMy WebLinkAbout04110035.573' DIAMETER 3' HIGH #4 GAGE WIRE 6 "x6' 10/10 GAUGE WIRE ANCHOR TO GRATE NON WOVEN FLTER FABRIC YARD CASTING GRASS SILT PROTECTION FOR DITCH GRATE (NEENAH R -4342) CASTINGS. TUCK FILTER FABRIC OR EQUIVALENT UNDER CASTING MAINTENANCE 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT. 2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT AND STABILIZE. YARD GRATE SILT BARRIER EC-8A NO SCALE 0 2' -3° COARSE AGGREGATE o' _ o _o ovy o��g� J� r ern c° _ •p o •G .b Cam. '°c•: Jo 0 p.i t c• �u GEOTDMLE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) MAINTENAN O 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE EC -26 NO SCALE PLAN VIEW MANHOLE / INLET FILTER FABRIC EC-27 0 --� 2, #1 STONE OR RIP -RAP PLAN VIEW END SECTION C rrn-nnKI A A _. ........ _ ROCK DONUT UNTIL TOP MEETS EXISTING GRADE AT SAME HEIGHT 24 IN. (MAX.) AT CENTER. (HEIGHT WILL VARY) MAINTENANCE: 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT RMOVING SEDIMENT AND MAKING NEEDED REPAIRS IMMEDIATELY. 2. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABLZED, REMOVE AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTUCTION MATERIAL AND RE- STABILIZE. NO SCALE ROCK DONUT DETAIL PAVEMENT INLET ✓EN ABRIC CHAIRBACK CURB INLET 4 REBAR STAKE 3' MINIMUM DEPTH. ION WOVEN "ILTER FABRIC ROLL CURB INLET EC-24A NO SCALE 12" MIN. VEN ABRIC INLET SILT BARRIER SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA COMPACTED EMBANKMENT MATERIAL TYP. BERM AROUND PERIMETER 2' MIN. 15'x15' MIN. OR AS REQUIRED TO CONTAIN WASTE CONCRETE STEP 1: EXCAVATE A 6' X 4' DEEP TRENCH 6' STEP 3: 4' PLAN STEP 2: FASTEN FABRIC TO STAKES AND BURY 2' X 2' BOTTOM 8' INTO THE 71-Z"l_DUTY STAKES NON -WOVEN HEAVE rl FABRIC DRIVE STAKES IN TRENCH TO ATTATCH SILT FENCE STEP 4: SILT FENCE SECTION 2" x 2" STAKE 2.5' MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. M'LT FENIEBARRIER INSTALLATION LE MATCH EXISTING GROUND SLOPE MATCH EXISTING GROUND SLOPE, GROUND I� Ax ��F a SURFACES r . _ sr > 12" MIN. 3:1 OR FLATTER SIDE SLOPES NOTE: 1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. 2. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 3. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTE CONCRETE. 4. AT THE END OF CONSTRUCTION ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED WASTE SITE. 5. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE INSPECTOR. �NR ETE W ASHOUT AREA DETAIL N NO SCALE EXISTING SOILS SITE TYPICAL SWALE DETAIL u�