Loading...
HomeMy WebLinkAbout04110002.7RAD. t R "RAD - ' - L,A= C A iNrRC' '2" I PAVEMEN7 B GAf::7F 1 6" v A L b1'A L K A -'V D, (NO SCALE) .44 K _ f !t �� CONCRETE WHEEL C NA i R I _. ._ _ - -- RAMP P PER L ` i I- -- - -� �— 8' -- i ,A, r,'_)1( AP RAMP DETAIL t .. Eve "AL N NC SCALE) i T EX PA VEMEN Lk rd�lc RSF ' #9 NDOT1 A �;ItirFTL PAVEMENT SFF L1r T ! -3 • •rr•• X PLAN ✓'/E W T. C 5- — ,° PA YEMEN T > Et ; JAr R 34l) ` C' tom' iA,:. 0Mf (- SUd' RA0_F I 9" M,'N. PRECA57 6 CONC_ WAL L S -fi r- S r{;L-JE I VAR. PIPE —_ -_ — VAR_ PIPE- FL 0 W SIZE CONC. BASE r, ELEVA, TI ON PAVEMENT SUB -GRADE E_= OUTSIDE DIAMETER I 1.25 Bc+ 12'(M1N.) )R ` ANE B0, TS INSIDE DIAMETER r d = DEPTH OF BEDDING BACKFILL WITH CLEAN GRANULAR MATERIAL AS READ BY MATERIAL BELOW PIPE INDIANAPOL IS DEPT OF / TRANSPORTATION STANDARDS & B(_�� r Tii ATE ?A ME — - - -� d(MIN.) rS 4 °X4 „Yt14' SPACING ii�MAY FASTENS.' 1 ° BY WlKF 5✓TAPLEJ TIE WIRFS OR L40 !71NC 5 GRANULAR R MAT�RrAL i 7' & SMALLER 6 c� COMPACTED TO 95Z 30" 10 60" 6 STANDARD PROCTOR DENSITr 5 T 0 1 E �?R WIRE TO FENC _&L A RGER 6 -66" 4'X4' TRENCH _10--\ AL1 BEDDING & INITIAL BACKFILL BE BACKF;LLED SHALL BE /NSTALLED /N 6' AND COMPACTED T^, '2 "BALANCED L IF T S 00 M %N 9" OF CLEARANCE SHALL I �6ac BE PRO v /DED ON EACH S %DE #8 CRUSHED S ONE OR EQUl V ?F T fE NSTALLED PIPE CLASS I GRANULAR BEDDING d MA TERIAL 1 PIPE_ BEDDING DETAIL (NO SCALE) STAB L,ZATION JAN FEB. MAR. APR. MAY JUNE JULY AUG. SEPT_ OCT NOV PRACTICE PERMANENT A r���/ ,����■ 'k /l� SEEDING DES:', DORMANT B --� B SEEDING T V 1 )RARY D we E •/// %/// %-9 ----- MULC!-IIN6 C' A = KEN'LICKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 4C LBS /ACRE, D PLL!_; 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE B = KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBSjACRE, PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C = SPP,IvG OATS 3 BUSHEL /ACRE w14EA- OR RYE 2 BUSHEL /ACRE. r = ANNUAL RYEGRASS 40 LBS /ACRE. _ COL T RAW MULCH 2 TONSIACRE. ii• LRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER R• IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD *NOTE. RIGHT -OF -WAY SHALL BE SEEDED OR SODDED, AND SHALL ONLY BE MIXTURE A" OR "B" DEPENDING ON TIME OF YEAR SEASONAL SOIL PROTECTION CHART V ,q; SUHASE ( "6 „M; ;tip (NO SCALE) PAVED AREA !NL E r (NO SCALE) NO TF. L A TERAL CONNECTION TO CL FANOU T STRUT TIRE TO BE W THIN 3.0' (THREE_ FEET) OF THE FOUNDA `ON WALL. FINISH FLOOR Ci_c ANOU T PLUG & ADAPTER d16 �p'0 O Q oO { - NEE.NAN a <" )61 OR EQUAL _PA r4 ✓__iEW „_-- NEENAH F 4' ` ,61 OR EQUAL ! 7 T C ELEV 6 'PRECAST STONE - CONC WALLS w I 24' ROUND INLET _- Q ILO a I� VAR. PIPE SIZE 18' MAX. I 4' -0' SQ. CONC. BASE - - -� (1) LINE 0. 116' PIPE MESH W W. F. ELE VA T10N PAVED AREA INLET (NO SCALE) CCU TS„DE vR CONCRE TE - ENCA SEMEN WHEN NC T ALREADY IN PROPOSED RIGID SURFACF_ TO BE INSTALLED 4" P_ V G PIPE IN DIRECTION OF NTF "JDED FLOW 1/8 STREET BEND - i 4 '" X 6 " INCRE A > FR SIZE VARIES, BASc.:' N APPLICATION I (SEWER LATFRAL OR ROOF DRAIN LEAQER) J G - -- — (MA X ) CLEANO T DETAIL !NO SCALE) DOUBLE STRAND 12 GA. WIRE TW __QOM IN RUBBER �4OS � " £ � ROM Tc ?P of -A*, `, SUITABLE CORD BANDING — CAP PLANTING PIT W/ BURLAP OR HEAVY -� 2 -3" OF CLAY TOPSOIL CREPE TREE WRAP PRIOR TO MULCHING MATE RIA, - PLACE •ROOT FLARE 3" LATER :)g' S.+-fEDDE -D HARDWC'r) AT OR SLIGHTLY HIGHER THAN fl / / - - IN`.. Ax_ 4r 'i.'E h' EXISTING i;RADE TAhLLL OR SPIKES FINAL GRADE EARTH SAUCER MIN. N = NOTE. STAKE & GUY' TREES AS SHOWN IF SOIL BACKFILL TO BE 7 SITE CONDITIONS DICTATE. TOPSOIL & 259 PEAT �� MAX. REMOVE WITHIN: ' YEAR (TAMPED) �1 REMOVE TOP 1 j'3 BURLAP --I \--- EX/STrNG SUBSOIL OR AND TIES & BINDINGS COMPACTED BACKFILL TREE PLANTING D� TAIL (NO SCALE) -- EROSION CONTROL SEEDING LIMITS. EROSION CONTROL SEEDING LIMITS GRASS SWAL, INSTALLED A 10% SLOPE vARIABLE VARIABLE _ A, SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION c ' IL(iPE VARIABLE GRADE AS SHOWN ON PLANS SLOPE W /SEEDING & EROSION CONTROL DRAINAGE SWALE SECTION (NO SCALE) DATE i REVISIONS SYM REVISIONS DRAWN B'' KAK DESGNED ffr MAS CMEICKED Br DA7E October 29, 2004 L"TS NTH 51 /ACRE 'REDTOP GRASS ", 20# /ACRE 'RYE GRASS', 20# /ACRE 'BLUEGRASS', 25j /ACRE "FESCUE' AND 6004 /ACRE 12 -12 -12 FERTILIZER. B. SEEDED AREAS SHALL HAVE A SUITABLE MULCH APPLIED FOR EROSION AND SILT CONTROL MULCH MAY BE STRAW, SHREDDED HARDMKX)D OR EROSION CONTROL NAT. C- DEVELOPERS OPTION: CONSTRUCTION AREAS REWIRING EROSION CONTROL MAY BE HYDROSEEDED IN ACCORDANCE WITH ABOVE SEED AND FERTILIZER SPECIFICATIONS. ?E'S /GHT EZVG17VHA=_H11VG gineers I Lafld Surveyors 1438 aalAsr C/nc% E�sr On've /ndianipo /Is, /nd/ane 40z" 317- 3C'A? -TOS? STAPLE PATTERN "D” 3-112 staple per sq.yd. using 6 -inch, 11 ga wire U" staples. 8 -inch staple and longer may be used for loose soils. 9 ga. staples may be necessary in hard or rocky soils. MATERIAL E ;ther an organic ("straw, excelsior woven paper, coconut, fiber, etc or a synthetic mulch incorporated into a polypropylene or simnor netting material. It may be oiodegradabie, photode- gradable or permanent_ SIL I r L i "ic—" (NO SCALE) `- X x X I x x x EROSION NETTING /.SLOPE ST4BILIZA -,01y EROS /ON CONTROL '5LAN" , T (NO SCALE) 3" LAYER OF SHREDDEE - PLACE SOIL BALL SLIGHTLY r -OGHER "HAN FIN. GRADE. HARDWOOD BARK MULCH A40UND SOIL OVER BAL., CAP PLANTING PIT W/( RHODODENDRONS & OTHER SITE CLAY TOPSOIL PRIOR ERICACEOUS PLANTS, PLACE AND M TO MULCHING (2-j-) -- MOUND pEATMOSS -' OVER BALL & MULCH ARTH SAUCER HEAVILY REMOVE TOP 113 BURLAP AND TIES & BINDINGS rN TRADE —• ` ` S IAL, ^ ERTi iZER TAB! ETS EXISTING SOIL OR T, ,� F ILL BE �% COMPACTED BACKFILL SO L BACK - �t TOPSOIL & 25Z PEs1TMOSS j TAMPED TO PRFVEN ' 6" MAX. -I SETTLEME NT SHRL,B PLANTING; DETAIL (NO SCALE) TREE PROTECTION DETAIL (NO SCALE) TREE PROTECTION SHALL BE A MINIMUM 4' WOVEN PLASTIC FENCE_ MOUNTED ON VERTICAL PIPES SPACED 4' APART LANGENWAL TER MAYFLOWER PARK CARMEL, IN I I I 4 i CURB INLET N PLASTIC FENCE FLOW ;TAPS BETWEEN BAGS " ACTS AS SPILL WAY ALL PAVED AREA �NLFTS SNAL� BF PROTECTED WITH SANDBAGS UN "L VEGETATION IS SECURE INLET PROTEC j'i0ry DETAIL AFTER PAVEMENT PLACEMENT (NO SCAL E) I (J c; G i 4 "X4 ")(1/4" STEEZ (-AP WELDED 7 TOPOF GA TT POS T GRAD£ - T YPCA1. Si.t>T'ED (CAN BE USED IN' OF STRAW BALES X6" T TRAP )R ` ANE B0, TS 4" DIA WOCii) R PL A N ' C ' MAX' / WIRE F E ENC -- & B(_�� r Tii ATE ?A ME 14 GAGE_ MESA 1 rS 4 °X4 „Yt14' SPACING ii�MAY FASTENS.' 1 ° BY WlKF 5✓TAPLEJ TIE WIRFS OR L40 !71NC 5 i ' IBS ;A TF RAVE c� F`1! TER =ABP(_ AL N. - c ENGfH v0 .K)INTS 5 T 0 1 E �?R WIRE TO FENC - - - -- - E , E ,1A 4'X4' TRENCH _10--\ ' A `TANL J BE BACKF;LLED AND COMPACTED 00 UPSLOPE I J4 SLOT'S I i L—j SIL I r L i "ic—" (NO SCALE) `- X x X I x x x EROSION NETTING /.SLOPE ST4BILIZA -,01y EROS /ON CONTROL '5LAN" , T (NO SCALE) 3" LAYER OF SHREDDEE - PLACE SOIL BALL SLIGHTLY r -OGHER "HAN FIN. GRADE. HARDWOOD BARK MULCH A40UND SOIL OVER BAL., CAP PLANTING PIT W/( RHODODENDRONS & OTHER SITE CLAY TOPSOIL PRIOR ERICACEOUS PLANTS, PLACE AND M TO MULCHING (2-j-) -- MOUND pEATMOSS -' OVER BALL & MULCH ARTH SAUCER HEAVILY REMOVE TOP 113 BURLAP AND TIES & BINDINGS rN TRADE —• ` ` S IAL, ^ ERTi iZER TAB! ETS EXISTING SOIL OR T, ,� F ILL BE �% COMPACTED BACKFILL SO L BACK - �t TOPSOIL & 25Z PEs1TMOSS j TAMPED TO PRFVEN ' 6" MAX. -I SETTLEME NT SHRL,B PLANTING; DETAIL (NO SCALE) TREE PROTECTION DETAIL (NO SCALE) TREE PROTECTION SHALL BE A MINIMUM 4' WOVEN PLASTIC FENCE_ MOUNTED ON VERTICAL PIPES SPACED 4' APART LANGENWAL TER MAYFLOWER PARK CARMEL, IN I I I 4 i CURB INLET N PLASTIC FENCE FLOW ;TAPS BETWEEN BAGS " ACTS AS SPILL WAY ALL PAVED AREA �NLFTS SNAL� BF PROTECTED WITH SANDBAGS UN "L VEGETATION IS SECURE INLET PROTEC j'i0ry DETAIL AFTER PAVEMENT PLACEMENT (NO SCAL E) I (J c; G i 4 "X4 ")(1/4" STEEZ (-AP WELDED 7 TOPOF GA TT POS T GRAD£ - T YPCA1. Si.t>T'ED (CAN BE USED IN' OF STRAW BALES X6" T TRAP _A%1; Hi, & -- ONC SL if[ DETQ'L -4 �..�I��t'�:,4� )� ti� �C °ALE PROF'COSED INLET 2')(6" 5 I T TRAP - - MISCELLANEOUS DETAILS qE A TI A PROP()SFD Ir LET STRAW BALE `S BUR'c i 3" #4 n,,"EBAR STAKE PER STRAW EA: E, j - - -- TYP/C AL SLR %TTED RISER (CAN' BE USED lN5 TEAR OF STRAW BALES) #4 REBAR S AKE p R STRAW BALt �-'i - TPAw _ *ALES BURIED ?" A_TF1 . �rri+4► r0 �. STRAW t /? _�, c Vi c^, AT Sly ,V 'L �� = 4 900 , , 103 (N� KJINa�. BY PROIEC' i_ NO. SCALE. 0106 1 )R ` ANE B0, TS PL A N / & B(_�� r Tii ATE ?A ME rS 4 °X4 „Yt14' ' IBS ;A TF RAVE - - - -- - E , E ,1A ' A `TANL J _A%1; Hi, & -- ONC SL if[ DETQ'L -4 �..�I��t'�:,4� )� ti� �C °ALE PROF'COSED INLET 2')(6" 5 I T TRAP - - MISCELLANEOUS DETAILS qE A TI A PROP()SFD Ir LET STRAW BALE `S BUR'c i 3" #4 n,,"EBAR STAKE PER STRAW EA: E, j - - -- TYP/C AL SLR %TTED RISER (CAN' BE USED lN5 TEAR OF STRAW BALES) #4 REBAR S AKE p R STRAW BALt �-'i - TPAw _ *ALES BURIED ?" A_TF1 . �rri+4► r0 �. STRAW t /? _�, c Vi c^, AT Sly ,V 'L �� = 4 900 , , 103 (N� KJINa�. BY PROIEC' i_ NO. SCALE. 0106 1