Loading...
HomeMy WebLinkAbout04110043.6�S 8% � UZ i i i W ry 0 i m" W Q GET B 1AL NOMS 1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY. AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2) IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION. 3) IT SHAD. BE THE CONTRACTOR'S RESPONSIBILITY TO NDTIFY AND COORDINATE CONSTRUC110N WITH ALL RESPECTIVE UTILITIES. 4) ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART 'P' APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. 6) IN ADDITION, EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 7) IT SWILL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 8) TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 9) BEARINGS, DIMEH?SIONS, AND EASEMENTS ARE SHOWN FOR REFMCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 10) ANY DRAINAGE 71E SYSTEM COMING ONTO THE SITE SHALL BE CONNECTED INTO THE PROPOSED DRAINAGE SYSTEM IN ORDER TO MAINTAIN POSITIVE DRAINAGE FOR THE OFFSITE SYSTEM. 11) ALL SANITARY MANHOLES IN NON -PAVED AREAS SHALL BE 3- ABOVE GRADE. IM TrE LAW 2 WORKING DAYS BEFORE YOU DIG. WITHIN INDIANA OUTSIDE INDIANA 1 -500 -3!122 -5544 1 -800- 428 -5200 IAiNN IMBIF1pIlONIO mom S9WIOE, mt 191 mu Sm Lo 6- 11 -HIt. rt 6 IQl o IK UM TO E>aJ1 a am MORF11N0 x uC91011om I,oC o sow = m rM oars ffm oo0o= "m SCALE: 1 " = 20' 0 10 20 40 m °moo LZ Z Y O N *�15 T E,p�o.•Q�/ *� N0. •* PE10100401� o.. STATE OF Z a z O 0 W Q L u J ~ � Q V JLL.� Cn Q O � Z � a� Z � o F_ c to � V O Q U oOZZ LEGEND W J C� NJm = STORM SEWER LINE N a CL O = STORM SEWER MANHOLE N a O = SANITARY SEWER MANHOLE O W ao Z = SANITARY SEWER LINE = FLOW ARROW -� ,.°J0°° = EXISTING SPOT ELEVATION�� = EXISTING CONTOURS — — = SWALE ME = MATCH EXISTING GRADE co ° = CLEAN OUT IN coo 0 0 = STORM SEWER CURB INLET Lq � Lq C' = CONCRETE END SECTION 1'v 1* DDoo -00110 INV. RCP = INVERT = REINFORCED CONCRETE PIPE r` r-: c n M M.H. = MANHOLE co STIR. = STRUCTURE W D. & U. E. - DRAINAGE AND UTILITY EASEMENT S. D. & U. E. = SANITARY, DRAINAGE, AND UTILITY W EASEMENT pit SAN = SANITARY SEWER CD H.C. = HANDICAP RAMP GET B 1AL NOMS 1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY. AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2) IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION. 3) IT SHAD. BE THE CONTRACTOR'S RESPONSIBILITY TO NDTIFY AND COORDINATE CONSTRUC110N WITH ALL RESPECTIVE UTILITIES. 4) ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART 'P' APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. 6) IN ADDITION, EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 7) IT SWILL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 8) TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 9) BEARINGS, DIMEH?SIONS, AND EASEMENTS ARE SHOWN FOR REFMCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 10) ANY DRAINAGE 71E SYSTEM COMING ONTO THE SITE SHALL BE CONNECTED INTO THE PROPOSED DRAINAGE SYSTEM IN ORDER TO MAINTAIN POSITIVE DRAINAGE FOR THE OFFSITE SYSTEM. 11) ALL SANITARY MANHOLES IN NON -PAVED AREAS SHALL BE 3- ABOVE GRADE. IM TrE LAW 2 WORKING DAYS BEFORE YOU DIG. WITHIN INDIANA OUTSIDE INDIANA 1 -500 -3!122 -5544 1 -800- 428 -5200 IAiNN IMBIF1pIlONIO mom S9WIOE, mt 191 mu Sm Lo 6- 11 -HIt. rt 6 IQl o IK UM TO E>aJ1 a am MORF11N0 x uC91011om I,oC o sow = m rM oars ffm oo0o= "m SCALE: 1 " = 20' 0 10 20 40 m °moo LZ Z Y O N *�15 T E,p�o.•Q�/ *� N0. •* PE10100401� o.. STATE OF Z a z z 0 W Q L u J ~ � Q V JLL.� Cn Q O � Z � Ix LL ``� Z � o F_ c p � V a. Q SHEET NO 5 �. r` o J � 0 U Z) W LI C-4 PROJECT NO. 040034 a z � o W z J Ww U Cn Y a Ix LL ``� o Z�� Qo^ LL o F_ c } ,� m SHEET NO 5 �. r` o J � 0 U Z) W LI C-4 PROJECT NO. 040034