Loading...
HomeMy WebLinkAboutO&M Manual PP 1-17-13The LEGACY TOWNS & FLATS PHASE II OPERATIONS & MAINTENANCE MANUAL BMP TYPE: SUMP CATCH BASIN VEGETATED SWALE (VS6) DRY DETENTION (DD10) BMP OWNER: Falcon Nest II, L.L.C. C /0: Platinum Properties, L.L.C. 9757 Westpoint Drive, Suite 600 Indianapolis, Indiana 46256 Contact Pelson: Tim Walter Phone: (317) 216 -8636 PREPARED BY: Gordan D. K,iq Stoeppehvertb and Associates, Inc: (317) 5704701 DATE PREPARED: James y 17, 2013 OPKRATIONS AND MAIN T1-1,N MANUAL THE LEGACY TOWNS & FLATS, PHASE II JOB# 57810JCH -S2 TABLE OF CONTENTS OPERATIONS AND MAINTENANCE MANUAL PURPOSE AND BACKGROUND STORM WATER QUALITY CONTROL REQUIREMENTS INSPECTION AND ILJINTENANCE REFERENCES APPENDIX A - BMP DESCRIPTION SUMP CATCH BASIN VEGETATED SWALE (VS6) DRY DETENTION (DD10) PURPOSE & BACKGROUND INSPECTION & MAINTENANCE ACTIVITIES EMERGENCY CONTACT INFORMATION INVASIVE PLANT SPECIES APPENDIX B BMP LOCATION 1\L-3P DETAIL DRAWINGS APPENDIX C INSPECTION & MAINl'ENANCE CHECKLIST VEGETATED SWALE DRY DE l'ENTION SUMP CATCH BASINS APPENDIX D OWNER ACKNOWLEDGMENT AGREEMENT OP KRATI ON S AND MAIN T ANC MANUAL THE LEGACY TOWNS & FLATS, PHASE II PURPOSE AND BACKGROUND Each year thousands of acres of Indiana land undergoes disturbance and /or is converted for the construction of subdivisions, commercial and industrial centers, highways, and other land uses. Agriculture and urban development are the two major types of land - disturbing activities in Indiana. Both are very important to the economic well being of the citizens of the state. Without proper planning and the wise selection of storm water management measures, these areas of soil disturbance are very vulnerable to accelerated erosion and sedimentation. Whenever vegetation is removed from the land's surface, the soil becomes exposed to the erosive effects of wind and water. Although erosion is a natural process, it can be greatly accelerated by human action that disturbs the land's surface. While it is true that the tons of soil eroded on agricultural lands is much greater, it has been proven that the amount of soil eroded on a per -acre basis can be many times greater on active construction sites. The loss of soil through erosion commonly results in the loss of good topsoil and the associated minerals and nutrients required for plant establishment and growth. Soil erosion not only causes on -site damage problems, but can also negatively impact water quality downstream through sediment pollution. It has been shown that sediment is the number one water quality pollutant by volume in Indiana. Sediment damage can take many forms. Sediment accumulation in wetlands can reduce their capacity to retain storm water and its value to wildlife. Sediment deposition in storm sewers can reduce their efficiency and capacity. Sediment and accompanying nutrients often reaches lakes and leads to algal blooms, a decrease in lake depth, and a decrease in the recreational and aesthetic value of the lake. In addition to erosion and sediment damage, the building of residential subdivisions, shopping centers, industrial parks, schools, recreational attractions, etc. can have a significant effect on the patterns and amounts of storm water runoff during and after construction takes place. This often leads to water quality degradation and more frequent flooding events. The final land use associated with many projects will also contribute to the discharge of pollutants. These pollutants will typically be generated by the activities that are associated with the final land use. It is important to practice effective storm water management and treatment of storm water runoff before, during, and after construction. Otherwise, the landowner and /or public may end up paying more for project reconstruction and replacement /maintenance of existing infrastructure. Furthermore, public environmental awareness demands that land users work with nature, and not against it, to protect Indiana's land and water resources. There are many ways to minimize the impacts of urbanization and protect the integrity of Indiana's natural resources. One method is through careful planning and inclusion of proven storm water management measures in a project's construction and development plans. Careful planning can prevent or at the very least alleviate much of the damage caused by erosion and sedimentation and the pollutants that will be associated with the final land use. However, careful planning and incorporation of appropriate storm water quality measures into a project's construction plans is not enough. These measures must be deployed and maintained on the site throughout all construction phases. (Indiana Storm Water Quality Manual, 2007) This manual provides engineers, developers, builders, contractors, government officials, and other with guidance on the inspection and maintenance of installed post - construction storm water quality measures for The Legacy Towns & Flats, Phase II. STORM WATER QUALITY CONTROL REQUIREMENTS BMP OWNER CONTACT INFORMATION Falcon Nest II, L.L.C. C /O: Platinum Properties, L.L.C. 9757 Westpoint Drive, Suite 600 Indianapolis, Indiana 46033 Contact Person: Tim Walter Phone: (317) 216 -8636 The project site owner must submit to the City of Carmel a Storm Water Pollution Prevention Plan (SWPPP) that would show the placement of appropriate BMP(s) specified in the City of Carmel Stormwater Technical Standards Manual. The noted BMP(s) must be designed, constructed, and maintained according to guidelines provided or referenced in the City of Carmel Stormwater Technical Standards Manual. It is the policy of the City of Carmel that the water quality management program be performance - based. To that end, a best management practice (BMP) approved for use in the City of Carmel will be capable of meeting or exceeding the 80% removal target for TSS whether the control be a single structure or a series of controls. In addition to TSS removal, a BMP must also be designed to store and treat the water quality volume (WQv). The water quality volume is the storage needed to capture and treat the runoff from the first inch of rainfall. Once the site is turned over to the HOA, they (the HOA) will be encouraged to install Pet Waste Stations at the entrances of the walking paths. Until the site is turned over to the HOA, the developer shall install signs at the entrances of the walking paths requesting individuals pick up their pets waste. INSPECTION AND MAINTENANCE It is essential that any approved BMP be properly inspected and maintained in order to assure the TSS removal performance. Therefore, an inspection and maintenance plan is required. The City of Carmel encourages the use of a high- efficiency, low maintenance BMP(s) that has the potential for removal of multiple stortn water pollutants. The City of Carmel and /or its representatives will perform annual inspections of permanent BMP(s) to ensure compliance. Routine monthly and annual inspections are the responsibility of the BMP owner. The BMP owner shall be financially responsible for any maintenance or repairs required by the City of Carmel and /or its representatives during the City of Carmel's inspections. The City of Carmel and /or its representatives have the right to enter the property to inspect the BMP(s). In the event that the City of Carmel finds a BMP in need of maintenance or repair, the City of Carmel will notify the BMP owner of the necessary maintenance or repairs and give the BIvIP owner a timeframe for completing the maintenance or repairs. If the maintenance or repairs are not completed within the designated timeframe, the City of Carmel shall perform the maintenance or repairs and bill the BLIP owner for the actual costs for the work. Annual inspection reports are required to be submitted to the City of Carmel Engineering Department, Attn: Storm Water Administrator, One Civic Square, Carmel, IN 46032. The first report is due one year after construction is completed, with subsequent reports due each year within the same month of the initial report. If there are any deficiencies found during the inspection, these should be addressed. If the inspection report is not received within the month it is due, if there are deficiencies which were not included in the report, or if any deficiencies included in the report are not addressed in a timely manner, the BMP owner faces enforcement action from the City of Carmel.. Legacy lies within a designated wellhead protection area (WHPA). To meet existing water quality regulations and to help address WHPA concerns expressed by local agencies, stormwater basins at Legacy will contain liners designed to manage potential contaminants that may be present within stormwater during infiltratation into the groundwater table. Please refer to the Spill Prevention Plan listed below for a listing of possible pollutants and instructions in case of a spill. Spill Response Plan The proposed land use will consist of single family residential houses. The pollutants and sources of each pollutant normally expected from these types of land uses are listed below: • Pollutant Source: Passenger vehicles, delivery vehicles, and trucks o Type of Pollutant: Oil, gasoline, diesel fuel, any hydrocarbon associated with vehicular fuels and lubricants, grease, antifreeze, windshield cleaner solution, brake fluid, brake dust, rubber, glass, metal and plastic fragments, grit, road de -icing materials • Pollutant Source: Residence o Type of Pollutant: Cleaning solutions or solvents, leaks from HVAC equipment, grit from roof drainage, aggregate or rubber fragments from roofing system • Pollutant Source: Trash dumpster o Type of Pollutant: Cleaning solutions or solvents, litter (paper, plastic, general refuse associated with distributions operations), uneaten food products, bacteria • Pollutant Source: Roadway o Type of Pollutant: Any pollutant associated with vehicular sources, grit from asphalt wearing surface, bituminous compounds from periodic maintenance (sealing, resurfacing and patching), pavement de -icing materials, paint fragments from parking stall stripes, concrete fragments, wind -blown litter from off -site sources, and elevated water temperatures from contact with impervious surfaces • Pollutant Source: Lawn and landscape areas o Type of Pollutant: Fertilizers, herbicides, organic material (leaves, mulch, grass clippings) and pesticides. In case of spill, contact the City of Carmel Fire Department (317 -571- 2625), City of Carmel Utilities (317- 571 - 2442), City of Carmel Engineering (317- 571- 2441), and the IDEIvi Spill Hotline (317 -233- 7745). REFERENCES 1. Indiana Storm Water Quality Manual - October 2007 2. Hamilton County Stormwater Technical Standards Manual - January 2006 3. City of Carmel Stormwater Technical Standards Manual — July 2006 4. The Legacy Overall Master Plan — prepared by Williams Creek Consulting HAMILTON COUNTY SURVEYOR: 317 - 776 -8495 CARMEL FIRE DEPARTMENT: 317 -571 -2600 IDEM: 317 - 356 -2411 CARMEL UTILITIES: 317 - 571 -2645 LOCAL EMERGENCY RESPONSE: 911 PLATINUM PROPERTIES, L.L.C.: 317 -863 -2057 APPENDIX BMP DESCRIPTION SUMP CATCH BASINS THE LEGACY TOWNS & FLATS, PHASE II PURPOSE & BACKGROUND The BMP for The Legacy Towns & Flats, Phase II are sump catch basins located at each curb inlet (structures 390,395) prior to entering the vegetated swale. The sump catch basins are storm structures constructed with a sump which serves as a sediment storage basin that can be accessed and cleaned out when necessary. INSPECTION & MAINTENANCE ACTIVITIES The performance of a sump catch basin is highly dependant on the inspection and maintenance of the structure. If the structure is not properly maintained, the ability to remove pollutants will decrease. The BIVIP owner will need to provide the maintenance for the sediment removal. The BMP owner agrees to the following monthly inspection program: 1. Remove manhole lid or open pavement grate to expose inside of box structure. 2. Lower a dip stick equipped with a ball valve (Sludge Judge or similar device) into opened box structure. 3. Measure the depth of sedimentation. The level of sedimentation shall not exceed 12 inches before maintenance. 4. In the event that maintenance is required, call a local vactor company to remove sediments and other debris with a vacuum truck. Dispose of all waste in accordance with the City of Carmel and any applicable state, and /or federal requirements. EMERGENCY CONTACT INFORMATION Hamilton County Surveyor's Office - (317) 776 -8495 Carmel Fire Department - (317) 571 -2600 Indiana Department of Environmental Management (IDEM) - (317) 356 -2411 REFERENCES 1. Indiana Storm Water Quality Manual - October 2007 2. Hamilton County Stormwater Technical Standards Manual - January 2006 3. City of Carmel Stormwater Technical Standards Manual — July 2006 4. The Legacy Overall Master Plan — prepared by Williams Creek Consulting L =y3_y Slot, • Mt:; 2612 Cily i,i C'•r,; :1 VEGETATED SWALES OPERATION AND MAINTENANCE PLAN Legacy Detention System Drainage Report Hamilton County, Indiana 11','0, 51 .Ir ►.� al • l;010,4 a:'l ±.r::,;i: �J24;cfi ►r. :i_rrlr7r;y Nil eilY of Ci;ni d, ►r; rn:iic• i Co:c,t,t 6:i arta D.1 IFITRDDUCTION This document defines responsibilities for operating, inspecting and maintaining the vegetated swab BMPs within the Legacy Detention System in the City of Carmel, Indiana. The proposed BMPs intend to provide natural and sustainable water quality improvement, passive recreation, and natural habitats to support wildlife and native plants. In order to maintain water quality and vegetative health trilhin the BMPs, inspection and Tight maintenance activities will be needed. An 11x17 BMP location map has been included at the end of this Manual. D.2 VEGETATED SWALE I3MP The vegetated swale BMPs were designed to incorporate natural and sustainable water quality improvements into an aesthetically pleasing site landscaping feature. The planting and seeding plans were developed with the goal of providing a diverse, native plant community extending from the bottom of the basin elevations to the lop of the finished grade. Although the BMPs are expected to develop into dynamic ecosystems that will eventually require Tittle vegetation maintenance, the following inspection, monitoring and maintenance schedule was developed to ensure that the BMPs are properly installed and are developing in accordance with intended design goals. D.3 Monthly Inspections Town of Carmel as well as Hamilton County personnel will have the right to enter the premises to perform compliance inspections of all permanent BMPs. However, routine monthly and annual inspection & monitoring of the BMPs are the responsibility of the owner. Sample monthly inspection Togs are included in at the end of this Appendix. The following areas should be inspected on a monthly basis for the first two years after construction of the wetland: D.3.1 Vegetation • Vegetation cover should be greater than 85 %. • Vegetation should be healthy. o Vegetation species should be consistent with plans. • Some species of plants such as reed canary grass (Phalatis aruudrracea), purple loosestrife (Lythruur salfcario), common reed (Phmgmifes ausfrafis), and cattails (Typha spp.) are considered invasive and should be eradicated within one month of discovery. Invasive species will be documented during the monthly inspections according to species, location and approximate percent cover. Photos of these species are included in Appendix E for reference. • Landscaped areas of the hanks that are eroded or have exposed bare oath shall be restored to proper grade, stabilized and re- seeded with the appropriate seed mixtures. D.3.2 Pollutants o Remove all iloalah!e debris. ▪ Remove visible pollution such as oily sheens, discoloration, and cloudy or muddy water. • If sediment accumulation is impairing flow of storm :rater into wet ponds, the sediments should be roritoverl. D.3.3 Erosion o There should be no exposed earth on batiks. o Other evidence of erosion will be noted 1eys::y.Sror ;a.,:::::r,.. , .. Gr1; ofCiAurl, liarrl2c;i 1. „ 1 ,.r,2; 201 Areas of severe erosion or other conditions that may constitute a public hazard will be corrected as soon as possible and prior to the next monthly inspection. D.4 Annual Monitoring Annual monitoring will be performed for three years after conslruclion to document the development of the BMP. The following infotmalion will be collected as part of the annual monitoring. O A letter report will be issued that includes monitoring forms, a summary of monthly inspections, and recommendations for routine or special maintenance activities. D,5 Maintenance Maintenance responsibilities shall remain in effect for the life of the BMP from the date the construction is completed. If regular inspection and maintenance guidelines are not followed, the Bf.1P may fail to attain water quality objectives set forth in the Town of Carmel regulations. D.5.1 Vegetation A species rich community of emergent macrophytes will be plan led in the portions of the constructed wetland below the normal pool elevation. Although the constructed wetland 13MP is expected to develop into a dynamic ecosystem that will eventually require little or no vegetation maintenance, some vegetation maintenance will be required in the first 2 years following construction in order to give the new vegetation communities a chance to become well established. • If the inspection and monitoring indicates the presence of invasive species, measures will need to be taken to prevent these species from establishing themselves at the nevi BMP. These species should be either physically removed or treated with herbicide by qualified native wetland plant maintenance professional. Physical removal is strongly preferred above the application of herbicide. If herbicide is used, application must be conducted in compliance with federal, state, and local Taws and regulations. Replant or reseed vegetation when damaged, vandalized or removed, in compliance to original planting specifications. D.5.2 Debris 4 Debris shall be removed from the constructed wetland BMP in order to maintain a functioning and aesthetically pleasing landscape feature. D.5.3 Nuisance Animals U Burrowing mammals should be controlled or eradicated when present in densities that endanger the integrity of the embankment. Damage caused by their burrowing must be repaired as soon as possible. Any burrowing mammal control effort will need to be carefully planned and executed Io avoid negative impacts on adjacent habitats and wildlife. Such measures will be confined to the embankment. Removal of burrowing rrrimrnats in other areas of the wetland may not be necessary. Mammals that may be of ccncern aro beavers (Castor caliadonsis), and inuskr ,t (orldalr'a zib fhica • If animals are burrowing into the berm areas, then a cc i red wildlife di-linage control expert should be contacted to remove the beavers and /or darn, and r l • The dense .iellend vegetation proposed would not le; • eI i ...e habitat for geese since they prefer open water and mowed vegetation. 2:!2 C;r�. t.': "'I C•a:,:l�; rh::lnlii D.5.4 Outlets and Forebays Outlets — All outlets shall be inspected and checked for debris and obstructions which disrupts the flow within the 13MP. If any pipes are obstructed, they must be cleared. D.G Summary The objective of the operation and maintenance manual is to assist the owner of the Slormwaler BMPs in operating, inspecting and maintaining the Constructed Wetlands for the Legacy development located in the City of Carmel, Indiana. An Inspection Checklist is included at the end of this Appendix to ensure that all the requirerl maintenance is concluded to maintain the integrity and design features of the :vellaiul BMPs. D.7 Responsible Parties The following owner information is responsible for funding and maintenance of the BfvIP's listed in the manual: Owners Name: CIO: Owners Address: Business Phone: Business Fax: C -mail: Falcon Nest II Platinum Properties, Tim Waller, PE 9757 Weslpoint Drive, Suite 600 Indianapolis, IN 46240 (317) 863 -2061 (317) 290-4379 h.valer@platintim-properties.com Legacy Stor i alitt Management Mash,' Han September 2012 City of Carole!, Hamilton County, Indiana APPENDIX F DRY DETENTION OPERATION AND MAINTENANCE PLAN (DD1, DD2, DDG, DD7, DDS, DD10, DD11) Legacy Detention System Drainage Report Hamilton County, Indiana I:'71hi)nls ('rock C lsidl I: j Inc i t Lege(y•Slounia!er Management !, la:rPhan Sepiembrr2012 City of Cannel, Hamilton Comet', Indian F.1 Introduction This document defines responsibilities for operating, inspecting and maintaining the Dry Detention Best Management Practices (BMPs) within andlor impacted by The Legacy Master Infrastructure Phase 2 construction plans within Carmel, Indiana. An annual report will need to be submitted to the City of Carmel Engineering Department, Attn: Storm Water Administrator, One Civic Square, Carmel, IN 46032. The 11x17 BMP location map identifies the location of the Dry Detention facility associated with the Phase II Construction Plan. Legacy lies within a designated wellhead protection area (WHPA). To meet existing water quality regulations and to help address WHPA concerns expressed by local agencies, stormwaler basins at Legacy will contain liners designed to manage potential contaminants that may be present within slormwaler during infillratalion into the groundwater table. Please refer to the Spill Prevention section of this manual for a listing of possible pollutants and instructions in case of a spill. F.2 Dry Detention City of Carmel as well as Hamilton County personnel will have the right to enter the premises to perform compliance inspections of all permanent BMPs. However, routine monthly and annual inspection of the dry detention BMP is the responsibility of the owner. Additional inspections (using the monthly checklist) are required within 48 hours of the end of any significant rainfall event (2 inches or more within 24 hours). Sample monthly inspection logs are included within this manual. F.3 Monthly Inspections The following areas should he inspected on a monthly basis: Vegetation • Some species of plants are considered invasive and should be eradicated within one month of discovery. Invasive species include reed canary grass (Phalaris arundinacea), purple loosestrife (Lythrunl salicaria), common reed (Pliragmites australis), and narrowleaf cattail (Typha anguslilolia.). The Appendix contains photos of these four common invasive species. • If invasive volunteer trees appear, they should be documented for removal. • Landscaped area of the banks that are eroded or have exposed bare earth shall be restored to proper grade, stabilized and re- seeded with the appropriate native seed mixtures. Floating Pollutants • Remove all floatable debris. • Note visible pollution such as oily sheens, discoloration, and cloudy or muddy water • Remove shoreline pollution such as trash or oily liquids • Miscellaneous debris Erosion Outlet • Inspect inlet, outlet, headwall and endwall areas for erosion and undercutting. If erosion is occurring, then additional scour protection measures will need to be employed. • Areas of severe erosion or other conditions that may constitute a public hazard should be corrected as soon as possible and prior to the next monthly inspection. lS'illr.;nac (21( 4:1; ('i nsnilinq Inc 12 legacy - Slnme: iIt 1 Management Mama Plan S,rple nfl 1 2012 City of Cannot Hamilton C.o:urly. Indiana • All pond outlets shall be inspected and checked for debris and obstructions that disrupt the flow within the storm water management system. If any pipes are obstructed, they must be cleared. Embankments • Animal burrows — Burrowing mammals should be controlled or eradicated when present in densities that endanger the integrity of the embankment. Damage caused by their burrowing must be repaired as soon as possible. Any burrowing mammal control effort will need to be carefully planned and executed to avoid negative impacts on adjacent habitats and wildlife. Such measures will be confined to the embankment. Mammals that may be of concern are beavers (Castor canadensis), and muskrat (Ondalra zibethica). . • Slope protection failure — Inspect the slopes of the BMP for any sliding or scour protection displacement. Please note location and describe the failure. F.4 Maintenance h4aintenance responsibilities shall remain in effect for the life of the BMP from the date the construction is completed. Data sheets are included to evaluate each area of concern. F.4.1 Vegetation Although the Dry Detention BMP is expected to develop into a system that will eventually require little or no vegetation maintenance, some vegetation maintenance will be required in the first 2 years following construction in order to give the new vegetation communities a chance to become well established. Precautionary measures must be taken to prevent invasive species from establishing. These species should be either physically removed or treated with herbicide by qualified plant maintenance professional. Physical removal is strongly preferred above the application of herbicide. If herbicide is used, it must be applied by State Chemists Office approved applicators and any application must be approved by the City of Carmel Utility Department prior to application. Replant or reseed vegetation when damaged, vandalized or removed in compliance to original planting specifications. F.4.2 Rip -Rap Periodic inspection is required of rip rap areas. Look for slumping, displaced rock material, and erosion. Check for accumulated sediment, bank instability, and scour holes. Any areas that have sustained damage shall be promptly restored to comply with original specifications. F.5 Mowing Plan If turf grass surrounds BMP, once established, turf grass height shall be maintained at a minimum height of four (4) inches to control weeds. Not more than 1/2 of the grass leaf shall be removed by the initial cutting or subsequent cutting. Do not mow any live native herbaceous plant area. F.6 Fertilizer No fertilizer is to be used unless soil testing has found specific deficiencies in nutrients. l':,llr:mu (NO: Com.utfirrq Inc 43 Legacy Slo ;rn.rtisManagea3:vaLush ?;Plan ST;:oriels20r1 City of Carmel. Hamilton County. Milian F.7 Herbicide and Pesticide Guidance Throughout the first year, treat any weeds, non - native or invasive species with glyphosale herbicide approved for use around water (Rodeo) by spot - spraying or other means that minimize incidental herbicide drift. Herbicide application should be conducted on, windless days so that the chemical does not spread or vocalize. Re -seed andlor replant any die -back resulting from incidental treatment with herbicide. Pre - emergent herbicides to be used on upland areas adjacent to stormwater management BMPs and other native landscape areas vvithoul native seed, or at least one year following seed installation, consist of prodiamine herbicides such as Barricade. Pre - emergent herbicides shall not be applied to plantings located in standing water. All herbicides muss be applied by Slate Chemists Office approved applicators and any application must be approved by the City of Carmel Utility Department prior to application. F.8 Signage See Section 5.5 F.9 Spill Response Plan The proposed land use will consist of single family residential houses. The pollutants and sources of each pollutant normally expected from these types of land uses are listed below: • Pollutant Source: Passenger vehicles, delivery vehicles, and trucks o Type of Pollutant: Oil, gasoline, diesel fuel, any hydrocarbon associated with vehicular fuels and lubricants, grease, antifreeze, windshield cleaner solution, brake fluid, brake dust, rubber, glass, metal and plastic fragments, grit, road de -icing materials • Pollutant Source: Residence o Type of Pollutant: Cleaning solutions or solvents, leaks from HVAC equipment, grit from roof drainage, aggregate or rubber fragments from roofing system • Pollutant Source: Trash dumpster o Type of Pollutant: Cleaning solutions or solvents, litter (paper, plastic, general refuse associated with distributions operations), uneaten food products, bacteria • Pollutant Source: Roadway o Type of Pollutant: Any pollutant associated with vehicular sources, grit from asphalt wearing surface, bituminous compounds from periodic maintenance (sealing, resurfacing and patching), pavement de -icing materials, paint fragments from parking stall stripes, concrete fragments, wind- blown litter from off -site sources, and elevated :rater temperatures from contact with impervious surfaces • Pollutant Source: Lawn and landscape areas • Type of Pollutant Fertilizers, herbicides, organic material (leaves, mulch, grass clippings) and pesticides. r;9Bra3ns Cro,,k Cunvott+r.,•) h3% •74 Legacy • Slorm.vater Ltmagem ad biasrer 1'i;m Septet/du ?(71? CO of Carmel Hatmlton Cotnk'y, Indiana Below is a list of invasive species that may be found within the vegetated areas: • Asian Bush Honeysuckle • Autumn Olive • Black Locust • Buckthron • Chinese Silvergrass • Common Reed • Creeping Charlie • Creeping Jenny o Crown Vetch • Dame's Rocket • Japanese Hedge Parsley • Japanese Honeysuckle • Japanese Knotweed • Multiflora Rose • Norway Maple • Periwinkle • Privet • Purple Lossestrife • Purple Winter Creeper • Reed Canary Grass • Russian Olive • Siberian Elm • Smooth Brome • Star -of- Bethlehem o Sweet Clover O Tall Fescue • Tree -of- Heaven • White Mulberry • Winged Burning Bush The Zink below is an exhaustive list of Indiana's Invasive Plants: Irllp://extension.enta plirclue.edti/C/1 PS/ P.'!i;1,1 ('n ak Col!.uih: ;? kw APPENDIX B OFFICE OF THE HAMILTON COUNTY SURVEYOR NON - ASPHALTIC MASTIC OR BUTYL RUBBER SEAL. BETWEEN JOINTS. 24" DIAMETER FULL HEIGHT MANHOLE STEPS AS SPECIFIED. 0 -RING GASKET NON. ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS. THIS STRUCTURE NOT TO BE USED IN ALL LOCATIONS, ONLY WHERE APPROVED BY HAMILTON COUNTY SURVEYORS OFFICE. PRECAST BASE 6" OR IS" PER SECTION V ASTING FRAME AND COVER AS SPECIFIED PRECAST CONCRETE ADJUSTER RINGS IF NEEDED (12 INCHES OF RINGS MAXIMUM). ECCENTRIC CONE OR REDUCER CAP AS REQUIRED BY SITE CONDITIONS. CONE TOP TO LATCH ADJUSTING RING PROFILE. 2' HR(IMIII( 12" SUHP S(AXII(UI( -- i.A46ir='.i 3" MINIltul(�''e L 'L' vamat,0 S 5" HIN111UH NOTE: MANHOLE CONFORMS TO ASTII 470 MANHOLE SIZE DETERMINED BY APPROPRIATE MANHOLE DETAIL PREFORMED HOLE TO MAXIMUM OF PIPE 0.D..6" WITH NON-SHRINK CEMENT GROUT. THIS STRUCTURE CAN 13E USED AS A CONFLICT STRUCTURE WITII SPECIAL APPROVAL OF HCSO AND A MINIMUM OF A 3' SUMP. REINFORCED DAR °4 0 12" ON CENTER OR —� APPROVED ALTERNATIVE MANHOLE BASE SET -011 6" OF °2 STONE (DRAWING NOT TO SCALE) HAMILTON COUNTY SURVEYOR'S OFFICE SUMP MANHOLE STRUCTURE APPROVED: KENTON /C. WARD, IIAI(ILT011 COUNTY SURVEYOR REVISED: 10 DEC 2006 81•1A:0-0'7 DATE STANDARD PLAN D -25 APPENDIX C SUMP CATCH BASIN BMP INSPECTION CHECKLIST STRUCTURE NO. STRUCTURE CONDITION SEDIMENTATION LEVEL (total # structures = Z ) (poor, fair, good) DATE Legacy - Stonm;ater Management lirisier Plan City of Carmel, Hamilton Couteyt Indiana Vegetated Swales Inspection Checklist Site Nanie BMP - ID As Built' Plans Available? Inspection Date Days since Previous Rainfall Inspector September 1011 Inspection Time Depth of Previous Rainfall Inspector Signature Maintenance Item Satisfactory or Unsatisfacto Notes Overflow Devices Inspect Overflow Devices Other: Adjacent Areas Inspect for Root Intrusion Inspect surface BMPs to determine if functioning correctly Inspect adjacent areas for ponding Other: Debris Remove debris from surface BIM Remove debris from overflow devices Other: Actions to be taken: To be Completed by (Dale): r:7A,an s Cra:1; C0:r.u!tin;7. Inc Leg icy . Slo:ne:atei ldanagoment rfaNiel Plan City of Cannel, Hamilton County, Warta Dry Detention Inspection Checklist St ygernlio 2012 Site Name BMP — ID 'As Built' Plans Available? Inspection Date Days since Previous Rainfall Inspector Inspection Time Depth of Previous Rainfall Inspector Signature Overflow Devices Inspect Overflow Devices Other: Adjacent Areas Inspect for Root Intrusion Inspect surface BMPs to determine if functioning correctly Inspect adjacent areas for ponding Other: Debris Remove debris from surface BMP Remove debris from overflow devices S4Tsfactory or 111 satisfacto Notes Other: Actions to he taken: To be Completed by (Dale): i�+i ».711:5 (:'�•rv; Cn9,∎111; ,) ltli f APPENDIX D BMP OWNER ACKIN OWLEDGM I--1, T THE LEGACY TOWNS & FLATS, PHASE II ACKNOWLEDGMENT AGREEMENT This Operations and Maintenance Manual is submitted to the City of Carmel with the intent to insure the longevity and adequate functioning of the BMP(s) owned by Falcon Nest II, L.L.0 c/o Platinum Properties, L.L.C. for The Legacy Towns & Flats, Phase II. By submitting this Operations and Maintenance Manual to the City of Carmel with plans to construct the BMP(s), the BMP owner noted above agrees to follow and abide by the inspection schedule and maintenance activities listed in this manual. The BIV1P owner noted above is responsible for any additional maintenance and /or repair activities to maintain the function and longevity of the BMP(s). BMP LIST: SIGNAGE SUMP CATCH BASINS VEGETATED SWALE (VS6) DRY DETENTION (DD10) Owner Signature Date Printed STATE OF INDIANA SS: COUNTY OF HAMILTON ) BEFORE ME, the undersigned, a Notary Public in and for said County and State personally appeared Owner /Agent subscribed and sworn before me this day of County of Residence Signature Commission Expiration Date Printed Name