Loading...
HomeMy WebLinkAbout04120001-2.9E 3 � � O N co 0o a) NN 3 _y o N LL_ N 0) o a _ I a r� c- a) r-0 m co m X a� _o a n E 0, Q_ 0 E o L a) V� W o E M -o O 0 0 g I % m Ln c C) 'c O ON c m L c 00 w C) m L z w a> O O a K) c N Ld c �r) Q) r) m � Z m U o .a-' a w O a m v) / o O CO T u / J Q (-D POWER ACES LEx � / ENCHMARK t CONSTRUCTION — — — — — �/ LIMITS (TYP,) / -- — — — — — — — X of 99TH STREET " — — — — ; .- 1" sc I _ II COI STRU� 0 'HOLEY MOLEY• DIG�•�J 1 -800- 382 -5544 CALL TOLL FREE too 1 Ko C 1'E I 1 1 1� I 0 1 I BLU 0 / � o ON 1 / / 1 1 1 1 884,58 = 887. 7 1 , K Chi ' I� 9 I B _ \ rig N ? � 1� � •r �, �r��p'• ;% ,�• %�•,• rte'% I STAGING AREA i O • — _ _III �� o 'i ,�• i L i a, �r CONSTRUCTION :_t• s • .� i• • _� �• • CONCRETE WASH OUT AREA IPR '�IJ BUILDING as i� �u • -u fit.. -• • • ;• -y, • a' s. ' I;1 I $1 . f�Zl�� cN• I r i �1 I'� • • -i I � i O o f I L O 0 �t • SOILS MAP NO SCALE yt • SILT FENCE X STONE REINFORCED BANK CONSTRUCTION LIMITS TEMPORARY SEEDING 0 PERMANENT SEEDING ULTRA- DRAINGUARD CATCH BASIN INSERT E.L.S. PRODUCTS CORPORATION OR EQUAL STORM SEWER INLET PROTECTION (TEMPORARY) 10 ALT &WITZIG ENGINEERING 3 ALL AREAS THAT ARE LEFT UNDISTURBED FOR 15 DAYS SHALL RECEIVE SEED AND MULCH. NORTH NN, I k 0 30 60 90 GRAPHIC SCALE IN FEET EROSION CONTROL NOTES Al P PLAN INDEX ITEMS RELATING TO THE SW PPP ARE INCLUDED AS B B12 SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE I IN THE EVENT OF ACCIDENTAL CONTAMINATION ALL EFFORTS NOTES ON THIS SHEET D DETAILS. S SHOULD BE MADE TO REMOVE CONTAMINANTS IN AN APPROPRIATE MANNER. THE CARMEL FIRE DEPARTMENT A2 1 1 1 x17 INCH PLAT IS INCLUDED WITH THE SUBMITTAL. 8 813 MATERIAL HANDLING AND SPILL PREVENTION PLAN: IN ORDER TO ( (317 -571 -2600) SHOULD BE CONTACTED IMMEDIATELY TO MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING D DETERMINE IF FURTHER MEASURES ARE NEEDED. A3 T THIS PROJECT INVOLVES THE CONSTRUCTION OF A 15,000 C CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS SQUARE FOOT BUILDING, PARKING LOT, ENTRANCE DRIVE, M MATERIAL HANDLING AND SPILL PREVENTION PLAN, THE B B14 S SEE EROSION CONTROL INSTALLATION DETAIL, SIDEWALK, STORM AND SANITARY SEWER, AND OTHER C CONTRACTOR SHALL REVIEW THIS PLAN WITH ALL SITE - RELATED UTILITIES. S SUBCONTRACTORS AND REQUIRE THAT THEY IMPLEMENT THE PLAN B B15 N NOT APPLICABLE. AS WELL. IF A SPILL SHOULD OCCUR PLEASE CONTACT THE A4 T THE VICINITY MAP IS LOCATED ON THE COVER SHEET, A APPROPRIATE AUTHORITIES BELOW: C Cl E EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE, POST - DEVELOPMENT. OIL, GREASE, ANTIFREEZE, GASOLINE, ETC. A5 L LEGAL DESCRIPTION: 39.55'56" N, 8613'48" W (NAD83) E EMERGENCY RESPONSE 911 M MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF THE MAJORITY A PART OF SECTION 7, TOWNSHIP 17 NORTH, RANGE 3 EAST, C CARMEL FIRE DEPARTMENT (317)571 -2600 O OF THIS PROJECT SITE BEING USED FOR TEMPORARY CUSTOMER HAMILTON COUNTY, INDIANA. C CARMEL POLICE DEPARTMENT (317)571 -2545 P PARKING. THE ONLY OTHER REASONABLY FORESEEN POLLUTION INDIANA DEPARTMENT OF NATURAL RESOURCES (812)477 -8773 F FROM THIS SITE WILL BE LITTER AND TRASH DUMPED BY A6 L LOT BOUNDARIES ARE SHOWN ON THE PLAN I INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT V VISITORS TO THE COMMERCIAL BUSINESS. (317)233 -7745 A7 H HYDROLOGIC UNIT CODE: 05120201090070 H HAMILTON COUNTY SOIL AND WATER (317)773 -2181 C C2 A ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW BROWNING INVESTMENTS (317)635 -5030 W WILL BE INSTALLED BEFORE ANY DISTURBANCE OF THE PROJECT A8 T THERE ARE NO STATE PERMITS REQUIRED NEEDED FOR THIS O OCCURS. FINAL STABILIZATION OF THE SITE WILL BE DEVELOPMENT, 1 1. CONSTRUCTION EQUIPMENT A ACCOMPLISHED USING PERMANENT SEEDING OF ALL OPEN AREAS, LANDSCAPING WITH MULCH ON PARKING ISLANDS, AND A9 S STORM WATER WILL DISCHARGE INTO AN EXISTING STORM SEWER A A. FUELING, LUBRICATION, AND FLUIDS: ALL OPERATIONS P PLACEMENT OF ASPHALT PAVEMENT. THAT FLOWS TO CROOKED CREEK. I INVOLVING THE ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE DONE IN ONE LOCATION, AS DESIGNATED ON SHEET C C3 B BROWNING INVESTMENTS HAS A PRACTICE OF MAINTAINING ALL A10 A ALL WETLANDS, LAKES, AND WATER COURSES ON AND ADJACENT C C301, SO THAT SPILLS ARE LIMITED TO THAT SPECIFIC P PARKING AREAS ON A WEEKLY BASIS. THIS MAINTENANCE TO THE SITE ARE SHOWN AND LABELED ON THE PLAN, L LOCATION WHICH WILL FACILITATE THE CLEANUP OF SPILLS. I INCLUDES FREQUENT SWEEPING OF ALL PAVED SURFACES AS IF AN OUTSIDE FUELING TANK IS PLANNED TO BE ON SITE, W WELL AS COLLECTION OF ANY UTTER. ALL GREEN SPACES WILL All T THE ULTIMATE RECEIVING WATER IS CROOKED CREEK. I IT SHALL BE DOUBLE WALLED AND STORED IN THIS B BE MAINTAINED WITH REGULAR MOWING DURING GROWING DESIGNATED AREA. THIS LOCATION IS AN AREA THAT WILL S SEASONS. MINIMAL FERTILIZER APPLICATIONS WILL OCCUR TO Al2 T THERE ARE NO AREAS ON SITE WHERE STORM WATER MAY N NOT ALLOW SPILLED FLUIDS TO MIGRATE INTO SUBSURFACE T THE GREEN SPACES. POTENTIALLY ENTER GROUNDWATER, S SOILS, IN THE EVENT OF A SPILL, THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING THE I IN ADDITION, DUE TO REDUCED CAPACITIES OF THE DOWNSTREAM A13 T THERE ARE NO FLOODPLAINS, FLOODWAY FRINGES OR FLOODWAYS C CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED S SYSTEM, THE DETENTION POND SYSTEM HAS BEEN DESIGNED TO ON THE SITE, O OF IN AN ACCEPTABLE MANNER. SPILLS ON HARD R RELEASE NO MORE THAN 0.25 CFS /AC. OF PROJECT AREA, SURFACES SHALL BE SOAKED UP BY AN ACCEPTABLE W WHICH IS GREATER THAN WHAT IS TYPICALLY REQUIRED IN A14 P PRE- CONSTRUCTION PEAK DISCHARGE: 5 CFS (10 -YEAR) M MATERIAL, SUCH AS OIL DRY AND THE ABSORBENT MATERIAL H HAMILTON COUNTY. THIS WILL PROVIDE EXTENDED DETENTION POST - CONSTRUCTION PEAK DISCHARGE: 0.67 CFS (10 -YEAR) D DISPOSED OF IN A PROPER MANNER. THE SPILL SHALL T TIMES, INCREASING THE POTENTIAL FOR SEDIMENTS TO FILTER DETENTION IS PROVIDED ON -SITE THROUGH 2 INTERCONNECTING A ALSO BE REPORTED IMMEDIATELY TO THE CONTRACTOR'S O OUT WITHIN THE PONDS. POST CONSTRUCTION STORMWATER PONDS.. S SUPERINTENDENT. Q QUALITY MEASURES WILL INCLUDE A GRASS FILTER STRIP ALONG ALONG THE SOUTH SIDE OF THE POND AND CATCH BASIN A15 A ADJACENT LAND USES: B B. EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE I INSERTS WITHIN ALL NEW STORM INLETS. A SUMP WILL BE REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF I INSTALLED WITHIN THE SLOTTED DRAIN TO CATCH GRIT AND NORTH: INDUSTRIAL F FLUID SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE O OTHER SOLIDS. SOUTH: INDUSTRIAL A AT A FACILITY THAT IS MORE SUITABLE THAN A EAST: INDUSTRIAL C CONSTRUCTION SITE TO HANDLE SPILLS. WHEN EQUIPMENT C C4 T THE POST CONSTRUCTION BMP FOR OVERALL STORM WATER WILL WEST: INDUSTRIAL M MUST BE REPAIRED ON SITE, IT SHOULD BE MOVED TO THE C CONSIST OF EXTENDED DETENTION WITHIN THE PONDS. IN MAINTENANCE AND FUELING AREA IF POSSIBLE. OTHERWISE, A ADDITION A VEGETATIVE FILTER STRIP WILL BE CONSTRUCTED A16 C CONSTRUCTION LIMITS ARE SHOWN IN THE PLAN VIEW. S SUITABLE ON SITE CONTAINERS SHOULD BE PLACED UNDER A ALONG THE SOUTH BANK OF THE POND. FINALLY, CATCH BASIN THE EQUIPMENT DURING REPAIR TO CATCH ANY SPILLED I INSERTS WILL BE PROVIDED. A17 V VEGETATIVE COVER IS SHOWN IN THE PLAN VIEW. AREAS NOT F FLUIDS AND THESE FLUIDS SHOULD BE DISPOSED OF IN A PAVED ARE GRASS, WEEDS AND BRUSH. P PROPER MANNER. C C5 M MAINTENANCE OF ALL STORM WATER POLLUTION PREVENTION MEASURES WILL BE THE RESPONSIBILITY OF THE PROJECT A18 S SOILS INFORMATION: C C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE O OWNER, BROWNING INVESTMENTS, UTILIZING PROCEDURES CANS, SHALL BE INSPECTED FOR LEAKS EACH TIME THEY O OUTLINED ON THESE PLANS. THE MAINTENANCE GUIDELINES Br - BROOKSTON SILTY LOAM A ARE USED. IF LEAKS ARE FOUND, THE FLUID SHALL BF C CONSIST MOSTLY OF GOOD HOUSEKEEPING MEASURES. ANY REMOVED FROM THE CONTAINER IN A PROPER MANNER AND G GRASSED OR VEGETATED AREAS THAT EXPERIENCE EROSION FROM THIS SOIL IS DARK COLORED, SILTY IN TEXTURE AND ON T THE CONTAINER DISPOSED OF IN AN ACCEPTABLE MANNER. R RAINFALL EVENTS SHOULD BE REPAIRED AND REVEGETATED AS DEPRESSIONAL UPLANDS. IT IS DEEP AND VERY POORLY E EMPTY DISPOSABLE CONTAINERS, SUCH AS GREASE TUBES S SOON AS POSSIBLE, TRASH OR UTTER SHOULD BE PICKED UP DRAINED WITH MODERATE PERMEABILITY, IT HAS HIGH AVAILABLE A AND LUBRICATING OIL AND BRAKE FLUID CONTAINERS, AND A AND PROPERLY DISPOSED TO PREVENT IT FROM GETTING INTO WATER FOR PLANT GROWTH AND HIGH ORGANIC MATTER CONTENT. T THEIR PACKAGING, SHALL BE DISPOSED OF IN A PROPER T THE STORM DRAINAGE SYSTEM AND DOWNSTREAM WATERWAYS, IT HAS COMPACT TILL STARTING AT A DEPTH OF 40 TO 60 M MANNER AND SHALL NOT BE LEFT ON THE GROUND OR IN INCHES. THE MAIN SOIL FEATURES THAT AFFECT THE URBAN T THE OPEN ON THE CONSTRUCTION SITE. E EROSION OF THE DETENTION POND BANKS SHOULD BE DEVELOPMENT USES ARE SEASONAL HIGH WATER TABLE, HIGH A ADDRESSED AS SOON AS IT BECOMES VISIBLE BY FILLING THE POTENTIAL FROST ACTION, MODERATE SHRINK -SWELL POTENTIAL, 2 2. CONSTRUCTION MATERIALS AND THEIR PACKAGING E ERODED AREA WITH SUITABLE SOIL AND ESTABLISHING VEGETATION MODERATE PERMEABILITY AND PONDED SURFACE WATER. I IMMEDIATELY, PREFERABLY BY SODDING. THE SAME MEASURE A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS S SHOULD BE USED FOR STEEP BANKS OF ANY BERMS OR BECAUSE OF THESE ENGINEERING LIMITATIONS THIS SITE WILL BE S SHALL BE IMPLEMENTED PRIOR TO AND DURING S SWALES. THE PONDS SHOULD ALSO BE MONITORED FOR CONSTRUCTED AS FOLLOWS: FULLER ENGINEERING, BEING A C CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE S SEDIMENT. IF THE BOTTOM OF THE PONDS RECEIVE SIGNIFICANT COMMERCIAL DEVELOPMENT WITHIN THE JURISDICTION OF THE S SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED S SEDIMENT (LESS THAN 4 FEET DEEP), THE SEDIMENT SHOULD BE CITY OF CARMEL AND HAMILTON COUNTY WILL HAVE TO ABIDE BY A AND MAINTAINED AS DESCRIBED ELSEWHERE IN THESE R REMOVED AND REPLACED ON SITE, AN ENGINEER SHOULD BE THE CURRENT SUBDIVISION CONTROL ORDINANCE. THIS P PLANS, EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL C CONTACTED TO IDENTIFY THE SOURCE AND RECOMMEND REPAIRS. ORDINANCE REQUIRES THAT WE HAVE AN ARTIFICIALLY DRAINED B BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC ACROSS SITE AND THAT THE BUILDING WITHIN THIS DEVELOPMENT BE B BARE SOIL DURING DRY AND /OR WINDY WEATHER, AND BY P PAVEMENT AREAS SHOULD BE MONITORED FOR POLLUTANTS. WELL ABOVE THE 100 YR. ELEVATION OF THE PROPOSED A APPLYING WATER OR OTHER ACCEPTABLE DUST CONTROL A ANY LARGE QUANTITIES OF FLUIDS SUCH AS OIL, ANTIFREEZE, DETENTION BASINS AND THEREFORE BE PROTECTED FROM M MEASURES TO THE SOIL. UPON COMPLETION OF B BRAKE FLUID, ETC. FOUND ON THE PAVEMENT SHOULD BE FLOODING. THE BUILDING WILL BE OF LARGE SLAB TYPE C CONSTRUCTION AND SUITABLE ESTABLISHMENT OF R REPORTED TO THE OWNER. THE OWNER SHOULD CLEAN THE CONSTRUCTION. IN CASES WHERE A HIGH WATER TABLE IS P PERMANENT VEGETATION, TEMPORARY EROSION CONTROL P POLLUTANTS AND PREVENT THE SOURCE FROM ENTERING THE PRESENT SPECIAL FOOTINGS SHALL BE CONSTRUCTED. ALL M MEASURES SUCH AS SILT FENCE, CHECK DAMS, AND INLET S SITE IN THE FUTURE. FINALLY, PAVEMENTS SHOULD ALSO BE ROADS WILL HAVE ADEQUATE SUB -BASE. ALL SANITARY SEWERS P PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO M MONITORED FOR SEDIMENT COMING FROM VEGETATIVE AREAS. IF SHALL BE PUBLIC AND THEREFORE NO SEPTIC SYSTEMS SHALL M MINIMIZE ADDITIONAL LAND DISTURBANCE. ANY AREAS P POST- CONSTRUCTION EROSION IS OCCURRING, THE SOURCE BE ALLOWED. D DISTURBED BY THESE OPERATIONS SHALL BE PROPERLY S SHOULD BE RE- STABILIZED AS SOON AS POSSIBLE BY SEEDING, REVEGETATED. S SODDING OR MULCHING. CrA - CROSBY SILT LOAM, 0 TO 3 PERCENT SLOPES B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING, C CONSTRUCTION SEQUENCE THIS SOIL IS LIGHT COLORED, SILTY IN TEXTURE AND ON D DRILLING, OR OTHER OPERATIONS SHALL BE PROPERLY SLOPING UPLANDS. IT IS DEEP AND SOMEWHAT POORLY DRAINED D DISPOSED OF IN SUITABLE ON SITE WASTE CONTAINERS. 1 1, S SCHEDULE PRE - CONSTRUCTION MEETING WITH HAMILTON COUNTY WITH SLOW PERMEABILITY. IT HAS HIGH AVAILABLE WATER FOR T THE SITE SHALL BE CHECKED AT THE END OF THE DAY, AT SOIL AND WATER CONSERVATION DISTRICT (317) 773 -2181. PLANT GROWTH AND MEDIUM ORGANIC MATTER CONTENT, THE A A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING THOSE S SOIL HAS COMPACT TILL STARTING AT A DEPTH BETWEEN 20 -40 B BLOWN ACROSS OR OFF THE SITE BY WIND, SHALL BE 2. I INSTALL SILT FENCE AROUND PERIMETER. INCHES. THE MAIN SOIL FEATURES THAT AFFECT URBAN P PICKED UP AND DISPOSED OF IN SUITABLE CONTAINERS. 2 DEVELOPMENT USES ARE SEASONAL HIGH WATER TABLE, W WHERE POSSIBLE, OPERATIONS SUCH AS SAWING THAT 3 3. I INSTALL MAINTENANCE, REFUELING AND CONCRETE WASH -OUT ACTION AND SLOW PERMEABILITY. S SPOT IN AN AREA PROTECTED FROM WIND, AND WASTE F FACILITIES AS SHOWN, PARTICLES COLLECTED AND DISPOSED OF FREQUENTLY TO 4 4. C CLEAR AND EXCAVATE DETENTION POND. BECAUSE OF THERE ENGINEERING LIMITATIONS THIS SITE WILL BE M MINIMIZE WIND DISPERSAL. CONSTRUCTED AS FOLLOWS: FULLER ENGINEERING, BEING A 5 PACKAGING USED TO TRANSPORT MATERIALS TO THE SITE P 5. I INSTALL NO -MOW BLUEGRASS AND STONE REINFORCEMENT ON CITY OF CARMEL AND HAMILTON COUNTY WILL HAVE TO ABIDE BY F FOR CONSTRUCTION OF THE FACILITY SHALL BE DISPOSED POND BANKS. THE CURRENT SUBDMSION CONTROL ORDINANCE, THIS O OF PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF 6. S STRIP AND ROUGH GRADE ENTIRE SITE. DISTURBED AREAS ARE SITE AND THAT THE BUILDING WITHIN THIS DEVELOPMENT BE I IMMEDIATELY OR STORED ON SITE FOR FUTURE USE. T TO BE KEPT TO A MINIMUM. CONTRACTOR SHALL CONTROL MUD WELL ABOVE THE 100 YR. ELEVATION OF THE PROPOSED P PACKAGED MATERIALS STORED ON SITE SHALL BE INSPECTED A ACCUMULATION ON ALL STREETS SURROUNDING PROJECT BY DETENTION BASINS AND THEREFORE BE PROTECTED FROM R REGULARLY AND ANY LOOSE PACKAGING SHALL BE REPAIRED I INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE FLOODING. THE BUILDING WILL BE OF LARGE SLAB TYPE O OR DISPOSED OF PROPERLY. C TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, CONSTRUCTION. IN CASES WHERE A HIGH WATER TABLE IS T C. ALL DEWATERING ACTIVITIES SHALL BE DONE IN ACCORDANCE V VEGETATIVE COVER, SPRAY ON ADHESIVES OR OTHER APPROVED ROADS WILL HAVE ADEQUATE SUB -BASE. ALL SANITARY SEWERS T TO GOOD EROSION CONTROL PRACTICES. THESE PRACTICES M METHODS. SHALL BE PUBLIC AND THEREFORE NO SEPTIC SYSTEMS SHALL S SHOULD INCLUDE THE USE OF DIRT BAGS SUCH AS DANDY 7. I INSTALL STORM SEWERS, INLETS AND INLET PROTECTION. FINE BE ALLOWED. D DIRT BAGS. THE USE OF THESE TYPES OF DEWATERING 7 GRADE BUILDING PAD AND BEGIN FOUNDATION. A19 A ALL PROPOSED STORM WATER SYSTEMS ARE SHOWN IN THE PLAN A AND DIRT AND PREVENT THESE MATERIALS FROM ENTERING 8 8 A ADD STONE TO BUILDING PAD. VIEW. DETAILED INFORMATION CAN BE FOUND ON THE UTILITY T THE STORM SEWER SYSTEM. PLAN. D. IF THE USE OF LIME IS USED TO STABILIZE THE SOIL OF 9 9, I INSTALL UNDERGROUND UTILITIES. A20 T THERE IS NO OFF -SITE CONSTRUCTION ACTIVITY PLANNED WITH T THE SITE THEN ALL CONSTRUCTION EQUIPMENT USED SHALL 10. I INSTALL CURBS AND FINE GRADE PARKING AREA. THIS PROJECT. B BE CLEANED OF ALL EXCESS MATERIAL WITH WATER IN THE 1 CONSTRUCTION STAGING AREA AS SHOWN WITHIN THESE 1 A21 T THERE ARE NO SOIL STOCKPILES PLANNED FOR THIS PROJECT, P PLANS. 11, S STONE PARKING AREA. A22 E EXISTING TOPOGRAPHY IS SHOWN IN THE PLAN VIEW. E E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO 1 12. C CONTINUE BUILDING CONSTRUCTION; APPLY PERMANENT SEEDING. ESTABLISH RAPID VEGETATION. WHEN THESE PRODUCTS ARE A23 P PROPOSED CONTOURS ARE PROVIDED IN THE PLAN VIEW TO U UTILIZED, THE USER SHOULD PAY STRICT ATTENTION TO THE 1 13. A ADD BINDER COURSE ON PARKING AREA. INDICATE DRAINAGE PATTERNS. ADDITIONAL SPOT SHOT P PRODUCTS RECOMMENDED USAGE. 14. I INSTALL LANDSCAPING. INFORMATION CAN BE FOUND ON THE GRADING PLAN, 1 3. CONCRETE WASTE WATER T B1 P POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES 3 15. C COMPLETE BUILDING CONSTRUCTION. INCLUDE CONCRETE WASTEWATER, TRASH, FOSSIL FUELS, OIL, A A. ALL CONCRETE WASTE WATER SHALL BE DISPOSED OF IN GREASE AND PAINT. EXPOSURE OF THESE POLLUTANTS TO T THE DESIGNATED AREA AS SHOWN ON SHEET C301. THIS 1 16. A ADD SURFACE COURSE OF ASPHALT. STORM WATER RUNOFF SHOULD BE MINIMIZED BY PERFORMING A AREA IS A 4' HIGH, 10' DIAMETER DOUGHNUT TYPE MULCH ACTIVITIES SUCH AS EQUIPMENT STORAGE, REFUELING, B BERM WHICH SHALL BE CONSTRUCTION OVER A GEOTEXTILE 1 17. T TEMPORARY INLET PROTECTION SHALL REMAIN IN PLACE UNTIL ALL MAINTENANCE AND PORT -A -LET PLACEMENT IN DESIGNED AREAS F FABRIC. THIS AREA SHALL BE INSPECTED ON A DAILY A AREAS ARE STABILIZED. AS SHOWN ON THIS SHEET. B BASIS AT A MINIMUM, WHEN THIS AREA BECOMES FULL, THE POLLUTANTS SHALL BE EXCAVATED, PLACED IN AN B2 C CONSTRUCTION SEQUENCE: SEE EROSION CONTROL PLAN. A ACCEPTABLE CONTAINER AND DISPOSED OF IN A PROPER MANNER. B3- T THE APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN IN B9 T THE PLAN VIEW. SEE THE DETAIL SHEETS FOR THE 4 4. PAINT PRODUCTS CONSTRUCTION SPECIFICATIONS OF EACH MEASURE. A. ALL EXCESS PAINT AND THEIR RELATED PRODUCTS SHALL B10 T THE PROPOSED PONDS ARE ANTICIPATED TO IMPROVE WATER B BE DISPOSED OF IN THE MANNER BY WHICH THE MANUFACTURER QUALITY BY ALLOWING SEDIMENTS TO SETTLE AND FLOATABLES TO S SUGGESTS. UNDER NO CIRCUMSTANCES SHALL PAINT OR THEIR BE IDENTIFIED AND SKIMMED. R RELATED PRODUCTS BE CLEANED OR DISPOSED OF IN SOIL, Ls Q H w a 0 O Lo 0 � O t� O M J � p cn a 0 UJ W me Y C Lo N .00 o c J E N O -gyp .Ln 0) U-) N aW 3: a C O c� o N v O��(o,< I� c 't M LL. H z 0 z� a 2 W Q J Waru O z W Lu zz z�IW0 UJ 0 (j m LLM z W �- o_ J a Vi O u w W SHEET N0. C301 IN IN