Loading...
HomeMy WebLinkAbout04110041.16-4 PLUMBING PLAN - SECOND FLOOR SCALE: v8' = V -0' PLUMBING PLAN -FIRST FLOOR SCALE: 1/8' - 1' -0' G Tc - - -W, PLUMBING NOTES THIS DRAWING FM - ESENTS THE GENERAL SCOPE OF THE PROJECT INT TERMS OF THE PLUMBING DESIGN CONCEPT. IT DOES NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND /OR COMPLETION OF THE CONTRACT. THE TRADE CONTRACTORS SHALL PERFORM SUCH SERVICES AND FURNISH ALL ITEMS RECUIRED FOR THE FULL AND PROPER EXECUTION OF THE PROJECT. EXISTING SANITARY LINES LOCATIONS SHOWN ON THIS PLAN ARE ESTIMATED. ACTUAL -LOCATIONS FOR ANY UTILITIES DUST BE VERIFIED IN THE HELD. MATERIALS: L PIPE AND DUCT HANGERS SHALL BE UNISTRUCT 2000 WITH 3/8' RODS AND LITCHFIELD CLIC SYSTEMS 316 S.S. ACCESSORIES, CLIC PIPE SUPPORT CLAMPS OR UNI- CUSHION CLAMPS. SIZE OF CLAMPS SHALL BE DETERMINED BY THE MANUFACTURER BASED ON THE TYPE AND LOAD OF EACH SYSTEM. 2. ALL WATER PIPING- SHALL BE TYPE 'L' COPPER ASTM 8 -88 HARD WITH ANSI 81622 WROUGHT COPPER FITTINGS AND NON -LEAD SOLDERED JOINTS. UNDERGROUND PIPING SHALL BE TYPE 'K' SOFT ASTM 5-88 WITH NO JOINTS AND ROLLED RADIUS TURNS UN- KINKED. 3. ALL GAS SHALL BE SCHEDULE 40 ASTM A- 12063 WITH MALLEABLE IRON 125 IB. FITTINGS. ALL JOINTS SHALL BE TEFLON TAPE AND PIPING CAULKED. 4. ALL SANITARY SEWER SHALL BE CAST IRON SCHEDULED 40 HOLES$ CISPI STANDARD 301 -18 OR SCHEDULE 40 PVC ASTM 0-2665. ANY PIPING LOCATED EXPOSED OR IN A RETURN AIR PLENUM SPACE SHALL BE CAST IRON. VENT PIPING SHALL BE THE SAME MATERIAL AS SANITARY SEWER 5. VALVES SHALL BE OF THE TYPE AND DESIGN FOR SERVICES BEING USED. BALL - BRONZE BODY 125 LB, WOG NIBCO T OR 5 -580Y. GATE - OR 5 -111. GLOBE - OR 5 -211. CHECK - OR 5- 413 -5. GAS COCKS - OR NORDSTROM 142. OTHER APPROVED MANUFACTURERS ARE APOLLO, STICKHAM, GRIMNELL, HAMMOND, WALWORTH, LUNKENHEIMER, CRANE OR MILWAUKEE (OR APPROVED EQUAL). 6. INSULATION FOR PIPING SYSTEMS SHALL BE INSTALLED AS PER MANUFACTURERS INSTRUCTIONS AND RECOMMENDED INSTALLATION PROCEDURES. WATER LINES - 1/2' CLOSED CELLED FOAM BY HALSTEAD OR ARMAFLEX FM STORM SEWER - SAME AS ABOVE. CONDENSATE SHALL BE 3/4' FOERSLASS - SAME AS ABOVE. A: INSULATE ALL WATER LINES COLD AND HOT, AND ALL HORIZONTAL STORM SEWER PIPING. B: ALL INSULATION SHALL HAVE A GALVANIZED SLEEVE WHEN RESTING ON THE ANY OTHER BUILDING MATERIAL. 1. ANY EXPOSED PIPING SHALL HAVE A CHROME ESCUTCHEON PLATE WHERE EXPOSED IN FINISH ROOMS. ALL PIPES THAT PASS THROUGH A FIRE WALL SHALL BE CAULKED AROUND PENETRATION WITH A FLAME RETARDANT UL SEALANT TO MAINTAIN RATING ON WALL. SILICONE CAULK ALL FIXTURES AROUND PERIMETER AFTER FINAL PAINTING OF WALLS. 8. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED FOR 24 HOURS BEFORE FINAL CONNECTION TO EXISTING IN ACCORDANCE WITH CODES. S. ALL FIXTURES SHALL BE AS SHOWN ON THE DRAWINGS AS TO TYPE AND MATERIALS BY ELJER, KOHLER, CRANE, AMERICAN STANDARD, ZURN, WADE, JOSAM, DELANY, SLOAN, PRICE, MOEN, POWERS, SPEAKMAN, CHICAGO FAUCET, BEMIS, OLSONITE, FIAT (OR APPROVED EQUAL). 10. COORDINATE W/EQUIPMENT SUPPLIER FOR REQUIRED V AIR GAPS FOR EQUIPMENT W/ A CONDENSER UNIT. r --- 5 3' W. 3' W. 3' VENT THRU ROOF PLUMBING RISER NO SCALE 3' VENT THRU ROOF CONNECT TO EXISTING WASTE PIPING wMATTINGLY CORPORATION 10150 LANTERN ROAD, SUITE 100 FISHERS, INDIANA 46038 317 - 577 -9688 CONSTRUCTION DRAWINGS OCTOBER 11, 2002 REVISION& A REVISION REVISION 2 DATE QR ISSION REVISION 4 DATE 5 QREVISION DATE PLOT DATE: NA DRAWN BY- CHECKED BY D PETERSON PROJECT NUMBER: 02 -0086 PLUMBING FLOOR PLAN Plol THESE DRAWINGS ARE GIVEN IN CONFIDENCE AND SHALL BE USED ONLY IN PURSUANT TO THE AGREEMENT WITH PETERSON ARCHITECTURE, P.C. NO OTHER USE OR DUPLICATION MAY BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF PETERSON ARCHITECTURE, P.C. ALL OTHER COPYRIGHT AND COMMON LAW RIGHTS ARE HEREBY SPECIFICALLY RESERVED.