HomeMy WebLinkAbout1479.99.4.. .M-11 ..
)L
41
a
2'-4' 4r-4' 24' -0'
201-4'
I— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -
1 ,
1
I I
I oo I , ,
o, I
ol
1 rL
I 00
I I I I
1 1 � • I I I
1 1
4 I
�Xj I I
I I
oo
1
CRAWL SPACE ;
1 1
1 I I
L --- 1 4' MN. PEA FILL OVER -
6 MIL POLY VAPOR BARRIM
LINTEL AT OVER DIG VENTILATION AS REQUNQ D LINTEL AT OVER DIG
AS REQUIR®, ALL A* REQUIRED, ALL �
POCKETS BY WALL POCKETS BY WALL
CONTRACTOR / CONTRACTOR
I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------ - - - - - - - - - - _ - ' -
--------------- - - - - - - - - - - - - - - - - - - - - - - - - , r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,
s ^ v
v 117 v v v 4-0 v
I
I I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -----------
_ I
CRAALL SPACE ACCE66 I I 1
olo
• I I I I
Q I I I I
1 I I I
,► I I I
IN WALL FOR "OPTIONAL" FINISHED BA MB LENT LAYOUT
- - - - - - ' FUTURE OPENING ' ►
WALLS N P N*WW AREAS TO BE F1N*W D W/
3-Vf FRAMING, INSULATION AS RECUIRM AND r j U
- - - CRAWL SPACE
PAINTED DRYWALL W/ FLOO TO BE CARPET
RING
■
WNLE68 OTUISE N0T1'D ON PLAN. ; 4' MIN. PEA FILL OVER Y b ; ; Q 4
' i r ' ► 6 MIL POLY VAPOR BARRIER '—^ F* • ; ;
1 1
VENTILATION AS REQUIRED 4
I I ► I v I I
I I I A I I
3' dr., area BASEMENT SLAB ;
lo JACK POST ON
"' POURED CONCRETE WALLS
- - - 3i' x 36' x li' a• i BEARING WALL W/
L u— CONCRETE P '
' - - - - - - , 4' MIN. GRAVEL FILL THIC4CEN® SLAB BY . ► '
1 CRETE CONTRACTOR. '
I 1 1
L77 ; LINTEL AT OVER DIG ------------ - - - - -- : ;
--- - - - - -- ---------------------- - -I - -- --------------------- - - - - -- --------------------------- - - - - -- - - -91 REQUIRED, ALL
Ike I I
► r - - - - -1 _
- - ���� ZZ 40
3' -0' —� -- I5 � ; POCKETS BY WALL Q I 1 - - - - - , , b
1
_ _ \
■ ■ 4 1Ii --- - - - + 1 , -- - - -- -D-R-O--P - B--E-A-M - -A-S - -R-6-Q-LJ-IR-E- D - - � ' 1 I — - - ---- --- -- - - rr -- - - -- - - -- -- -1 -- -I -- -r I - -- - I -- - I - - - r I - - 1 -- - - - - --- - - - - -�
ONTRACTOR
- - - - -- ---------------- - - - - -- - --- DROP T1416 AREA FOR 14VAC I , I
I I I 1
•
- - - - - - - - - - -- -------------------------- - - - - -- C
--- - --
,
-------- — — — — — — — — — — — — — — — — — — I I I
' dI& 67ffi. I 1 1 t I 1 I �,r , ' 3001 MP SER I , ■
1 1 I I 1 I I 1 I� '
I JACK POST ON I I I I 1 I t 1 II , a ' BRAN ABU' /�E M GARAGE I I
7 I I 24' x 24' x IL ---- - - - - -- l
CONCRETE PAD 1 B�ATb l` J ' ►
Q---- - - - - -- -- -------- - - - - -- ;
�• ►
- - - - - - - - - - TORAr# L-1 Ill STAIR W.0
N
I , - I
. I . ----------- ---------------
Q .
------- "- ROUGH N ONLY, ,
L B FULL BATH AS SHOWN
I
4
x ; s SLOPE SLAB TO DOORS
s UNFINI STOR, • ►
y 36' TALL W.W.I. W/ 4 � ► PIT Y
O I WOOD CAP t TRIM -f ' -
1
I 1
1 I
I
1W Ir 17 I PIT I 1
► ;
--------------------------------------------- - - --------------------- - - - - --
'- ----------- - - - - -- - - -- - - -- -� ►► ; \Pi[
PORCH SLAB - Ga.4RAGE SLAB
4 1
V 4' CONC. SLAB OVER -------------------------------------- 4' CONC. SLAB OVER
Q 4 Le
4' MN. GRAVEL FILL// 4' MN. GRAVEL FILL
I I
1 1
I � I
I 1
INTEL AT OVER DIG r INTEL AT OVER DIG
I I
7
AS REDlI1R8�, ALL ; ; AS REWIRED, ALL 1
8 8 a
as a &I BY WALL ; ; POCKETS BY WALL _
CONTRACTOR CONTRACTOR
�~■ ',�•
4 I 1
1 I
I 1
I 1
I 1 I 1
I I 1 t
I I I
' I ------------ I I
, I I
'
R=7=
- - - -- I
' --------- ------------------ ---------------------------- - - - - -- -
211-4' 13'-4' 4' -0' 2D' .6'
2'-4' .409-64 244'
FOUNDATION FINISWED BASEMENT
"OPTIONAL" FINIS 4ED AREA 1138 S,F.
STORAGE ZOO E.F.
SCALE: V4' • V -0"
O
POURED LONG.
I P D P D O I
P
O %a
CONC. LINTEL
FOR 9' CONCRETE WALL
G.M.U.
0 _ 0 _
FOR BLOCK WALL
LINTEL DETAIL FOR BASEMENT
SCALE: 1/4" ■ 11-0"
GENERAL FOUNDATION NOTES:
I) ALL SOIL IS BASED ON 2800 P.S.I., AND CONCRETE IS BASED ON
2800 P.S.I. • 26 DAYS, FOOTERS ARE 16' WIDE AND be DEB'
UNLESS NOTED OTHERWISE ON PLANS.
2) BASEMENT WALL WEIGWT AS NOTED ON PLANS, W/ SNORT WALLS
• CRAWL. SPACE OR SLAB BELOW FROST LINE AS REOUIRM.
3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE
FOR TVA91SELVES, THE WTABLITY OF THE PLANS IN RK ATIONSW
TO THE BUILDING SITE, AND EXISTING GRAM.
4) THESE DRAWINGS SERVE AS A GUIDE TO THE CONSTRUCTION OF
THE BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN
ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF 118E LOCAL
AND/ OR STATE BUILDING CODES. IT IS THE CONTRACTORS FULL
RESPONSIBILITY TO REAM ALL PLANS FOR ACCMACY AND
CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE
OF THEIR WORK. THE CONTRACTOR A680M86 ALL R66PONSID LITY
FOR ERRORS IN DESIGN, DIMENSIONS OR OMISSIONS.
5) ALL STRUCTURAL ME 161M ARE BAS® ON AN AS6IIMED MW,
AND MAY CHIANGE AT ANY TIME, IT 16 THE CONTRACTORS
RESPONSIBILITY TO VERIFY ACTUAL NEED AND 6=6 IF NOT 6HOWN.
6) ALL WINDOW SIXES LISTED ARE AS MANBACTURM BY MALTA
WOOD PRODUCTS, 018.668 NOTED 07:�E, AND MAY VARY
BASED ON SUPPLER, ALL FINISHES AND ROUGH OPENINGS
MUST BE VERIFIED BY OWNER/ CONTRACTOR.
'U ALL WALLA W/ BRICK ARE 1-V22, ALL OTHERS TO BE 3-Vt uNUso6
NOTED OTHERWISE ON PLANS.
a) ALL CEILINGS ARE S' MAN LEVEL AND a' 0PPM LEVEL OR AS
NOTED ON PLAN FOR GIVEN AREA.
W ALL DISCREPANCIES ARE TO BE BROUGHT TO TAE ATTENTION
OF THE CONTRACTOR IMM@1IATELY BEFORE CONSTRUCTION
IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN.
W
u
0
CA
- z4
W x
J
®
x
to
tL
s�11
RE
t:4
P-1
v-4
e�
yp^,"
Y
1
I
E
v
00
M
t�
C
eq
u
c
M
0
l
Lfic
i
I�
\�J
I DATE: 06-* -% 1
I DRAWN BYs J- WOLLEY I
i SCALE: AS SHOWN I
REVISIONS:
FINAL PLANE■ 0644 -'1118
k.31