Loading...
HomeMy WebLinkAbout05020008.4DEMOLITION PLAN SCALE: 1" = 30' 0' 15' 30' 60' SCALE: 1' = 30' NORTH GENERAL NOTES 1. ALL MATERIAL EXCEPT THAT BELONGING TO A PUBLIC OR PRIVATE UTILITY COMPANY SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL NOTIFY THE OWNERS OF WATER, ELECTRIC, OR GAS METERS WHEN THE METERS ARE READY FOR REMOVAL, AND SHALL BE RESPONSIBLE FOR DISCONNECTING ALL UTILITIES IN COMPLIANCE WITH LOCAL REQUIREMENTS. 2. THE EXISTING UTILITY LOCATIONS ARE APPROXIMATE AND BASED ON THE BEST AVAILABLE INFORMATION, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING THESE LOCATIONS AND ANY DAMAGE WHICH IS DONE TO SAID UTILITIES. 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO STUDY THE PLANS AND VISIT THE SITE TO DETERMINE THE ITEMS THAT MUST BE REMOVED TO COMPLY WITH THE SITE DEVELOPMENT PLANS. NO EXTRA FEE WILL BE PAID FOR THE REMOVAL OR RELOCATION OF ANY ITEM NOT LISTED THAT IS VISIBLE UPON A SITE VISIT. THE DEMOLITION LEGEND AND NOTES ARE INTENDED TO SIMPLIFY THE DRAWINGS, AND DOES NOT GUARANTEE THAT ALL ITEMS ARE ADDRESSED. 4. REMOVE FROM SITE DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. 5. NO BURNING OF ANY MATERIAL, DEBRIS, OR TRASH ONSITE WILL BE ALLOWED. EXCEPT WHEN ALLOWED BY APPROPRIATE GOVERNING AUTHORITY AND OWNER. IF ALLOWED AS STATED ABOVE, BURNING SHALL BE PERFORMED IN A MANNER PRESCRIBED BY GOVERNING AUTHORITY. ATTEND BURNING MATERIALS UNTIL FIRES HAVE BURNED OUT AND HAVE BEEN COMPLETELY EXTINGUISHED. 6. TRANSPORT MATERIALS REMOVED FROM DEMOLISHED STRUCTURES WITH APPROPRIATE VEHICLES AND DISPOSE OFFSITE TO AREAS WHICH ARE APPROVED FOR DISPOSAL BY GOVERNING AUTHORITIES AND APPROPRIATE PROPERTY OWNERS. 7. CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL DEMOLITION PERMITS. 8. STRIP TOPSOIL FROM ALL AREAS TO BE DISTURBED BY CONSTRUCTION OPERATIONS OR MATERIAL STORAGE. 9. ALL EXISTING SITE IMPROVEMENTS MUST BE REMOVED FROM THE SITE. PRIOR TO CONSTRUCTION THE DEMOLITION CONTRACTOR IS TO NOTIFY THE ENGINEER WHO PREPARED DEMOLITION DOCUMENT IF THERE ARE ANY DISCREPANCIES. PLAN NOTES ® REMOVE EXISTING 12" RCP STORM CONCRETE PIPE. © REMOVE EXISTING SUBDRAINS. © REMOVE EXISTING CONCRETE WALK. OD REMOVE EXISTING STORM STRUCTURE. OE REMOVE EXISTING ASPHALT. OF REMOVE EXISTING CONCRETE CURB. © REMOVE EXISTING CONCRETE HANDICAP RAMP. ( REMOVE EXISTING BRICK PAVERS. OI PROTECT EXISTING UTILITIES AROUND THE DISTURBED AREA. O PROTECT EXISTING SIDEWALK DURING CONSTRUCTION. 0 SAW CUT EXISTING CONCRETE CURB NEAT AND TRUE TO LINE. © SAW CUT EXISTING SIDEWALK NEAT AND TRUE TO LINE. LEGEND CURB AND GUTTER TO BE REMOVED EXISTING STORM LINE EXISTING STORM STRUCTURE EXISTING SIDEWALK TO BE REMOVE CURB AND GUTTER TO BE REMOVED EXISTING STORM LINE TO BE REMOVED ® EXISTING STORM STRUCTURE E E E F E EXISTING SIDEWALK TO BE REMOVED Pedcor Design Group Architecture / Project Managment: 335 Ridgepoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) © Copyright 2004 Civil Engineer: P E D C O R DEVELOPMENT CO. Scope Drawings: In rtesrls odf amhn' s mir�al d general ao t, the of the ns project the buEldmg, the ma or archlydurelePemenis and the type of structural, mechanical, and electrical systems. The drawinggsa do not necessarily indicate or describe all work required-for full performance and completion of the requirements of the Contract On the basis of fhe penaral scope inicated or described, the trade contractors shall famish all Itema required for the proper execution and completion of the work. Project: Carmel City Center Parcel #. # 3rd Avenue Southwest Carmel, Indiana Phase 3 Building 4 DEMO PLAN Drawing Title: Revisions: Issue Date Drawn By Checked % 01/31/20051 KR5 I RRO Certified By: Project Number: 24380 Sheet Number: cloo