Loading...
HomeMy WebLinkAbout05020008.9n RIP" m m fA' a LEGEND: EXISTING TREE TO REMAIN -� PROPOSED SHADE TREE OPROPOSED ORNAMENTAL TREE PROPOSED EVERGREEN TREE O PROPOSED SHRUB r .............. PROPOSED GROUND • 8 PROPOSED PERENNIALS ® PROPOSED ANNUALS AREA NOT TO BE IRRIGATED PROPOSED IRRIGATION SLEEVE 6" PVC *PC PROPOSED QUICK COUPLER VALVE SCALE: 1 " = 30' NORTH 1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE GRADE HARDWOOD MULCH I�I�III- GROUND COVER PLANTING SOIL TO BE 1 PART MANURE, 5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4 ". A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED FIBROUS PEATMOSS MAY BE USED IN LIEU OF PLANTING MIX. INCLUDE FERTILIZER AT APPROVED RATES. GROUND COVER OR FLOWER BED DETAIL NTS DOUBLE STRAND 12 GA. WIRE TWISHED IN RUBBER HOSE 6" FROM TOP OF— STAKES SUITABLE CORD BANDING BURLAP OR HEAVY CREPE TREE WRAP MATERIAL PLACE SOIL BALL SLIGHTLY HIGHER THAN EXISTING GRADE, MOUND SOIL OVER BALL FINAL GRADE CAP PLANTING PIT W/ 2 -3" OF CLAY TOPSOIL PRIOR TO MULCHING 3" LAYER OF SHEDDED HARDWOOD MULCH INSTALL FERTILIZER TABLETS OR SPIKES EARTH SAUCER =III -1 I —I I T —1 1 I- -1 I� I I� l 1 11 -1 I - III -III MIN. I II�� I II OTE: STAKE & GUY REES AS SHOWN IF SOIL BACKFILL TO BE 75% TE CONDITIONS DICTATE TOPSOIL & 25% PEAT (TAMPED) REMOVE BINDING EX ►STING SUBSOIL OR COMPACTED BACKFILL TREE PLANTING DETAIL o3 NTS PLANTING NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE - EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFER- ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE BY LANDSCAPE ARCHITECT. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR, 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 101bs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 5115s. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 2001bs. ROLLER, AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK. 3" LAYER OF SHREDDED HARDWOOD BARK MULCH - CAP PLANTING PIT W /ON SITE CLAY TOPSOIL PRIOR TO MULCHING (2 -3 ") EARTH SAUCER FIN. GRADE �� PLACE SOIL BALL SLIGHTLY HIGHER THAN FIN. GRADE. MOUND SOIL OVER BALL, RHODODENDRONS & OTHER ERICACEOUS PLANTS, PLACE AND MOUND PEATMOSS OVER BALL & MULCH H EAVI LY. INSTALL FERTILIZER TABLETS OR SPIKES EXISTING SOIL OR SOIL BACKFILL TO BE 75% COMPACTED BACKFILL TOPSOIL & 25% PEATMOSS TAMPED TO PREVENT 6" MAX. I SETTLEMENT. SHRUB PLANTING DETAIL K02 NTS 11, PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGRASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MOREfHAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN- TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS. 16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 " -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING , OPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACK- FILL AT APPROVED RATES. 19. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION. FINAL LOCATION AND SIZE ARE NOTED ON PLANS, 20. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY WHETHER AN EXISTING IRRIGATION SYSTEM IS PRESENT ON SITE AND WITHIN THE PROPOSED CONSTRUCTION AREA. IF AN EXISTING IRRIGATION SYSTEM IS PRESENT AND WILL BE AFFECTED BY THE NEW CONSTRUCTION, IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO EMPLOY AN IRRIGATION SUBCONTRACTOR TO REVIEW THE EXISTING SYSTEM. THE IRRIGATION SUBCONTRACTOR SHALL MODIFY THE EXISTING IRRIGATION SYSTEM AS NECESSARY TO ASSURE THE SYSTEM'S INTEGRITY, INCLUDING BUT NOT LIMITED TO ADDING OR MODIFYING AND DELETING EXISTING IRRIGATION HEADS, VALVE BOXES, WIRING OR OTHER ELEMENTS TO PROVIDE ADEQUATE IRRIGATION. 21. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST BE REMOVED W[ THIN ONE YEAR. WHEAT OR RYE OATS ANNUAL RYEGRASS NON- IRRIGATED* IRRIGATED DORMAT SEEDING ** TEMPORARY SEEDING DATES: JAN I FEB I MARI APR I MAYI JUN I JUL I AUGI SEPI OCTI NOVI DEC PERMANENT SEEDING I DATES IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS, USE MULCH. * LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. ** INCREASE SEEDING APPLICATION BY 50 %. FIGURE 5 -3 TEMPORARY SEEDING: KIND OF SEED 1000 SQ.FT. ACRE REMARKS WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 -1/2" DEEP SPRING OATS 2. Y LBS. 3 BU. COVER SEED TO 1 DEEP ANNUAL RYEGRASS 1 LB. 40 LBS. COVER SEED TO 1/4" DEEP * NOT NE(ESSARY WHERE MULCH IS APPLIED. SEEDING SCHEDULE o1 NTS C600) Pedcor Design Group Architecture / Project Managment: 335 Ridggeppoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) © Copyright 2004 Civil Engineer: ucvutuurrr. P E D C 0 R DEVELOPMENT C4. oalpp d ewrc ae l 'the build g Antfre� m�; arc�hl 9n Dn e"t thee type of structural, mechanical, and electrical systems. The drawinggss do not necessaft indicate or describe all work reauire� for full oerformance and completion of the requirements of the Contract. On the basis of the ggeeneral scope ini ated or described, the trade contractors small fumish all items required for the proper execution and completion of the work. Project: Carmel City Center Parcel ### 3rd Avenue Southwest Carmel, Indiana Phase 3 Building 4 LANDSCAPE PLAN Drawing Title: Revisions: Issue Date Drawn By Checked By 01/31/2005 KR5 RRO Certified By: Project Number: 24380 Sheet Number: C600 PLANTING SCHEDULE KEY BOTANICAL NAME COMMON NAME SIZE NOTES TREES FRA -A FRAXINUS PENNSYLVANICA AUTUMN PURPLE 2 " -2 1/2" CAL B & B, 30' O.C. FRA -S FRAXINUS PENNSYLVANICA 'SUMMIT' SUMMIT ASH 2 " -2 1/2- CAL B & B, 25' O.C. ACE -0 ACER RUBRUM 'OCTOBER GLORY' OCTOBER GLORY 2 " -2 1/2" CAL B & B, 20' O.C. CAR -B CARPINUS BETULUS 'FASTIGIATA' PYRAMIDAL EUROPEAN HORNBEAM 2 " -2 1/2" CAL B & B POP -H POPULUS N.E. 308 (HYBRID) SCREEN POPLAR 1 1 /2" CAL B & B, 12' O.C. PYR -C PYRUS CALLERYANA 'CLEVELAND SELECT' CLEVELAND SELECT PEAR 2" CAL B & B AME-GI AMELANCHIER X GRANDIFLORA AUTUMN BRILLIANCE SERVICEBERRY 1 3/4" CAL B & B, 15' O.C. MAG -R MAGNOLIA STELLATA 'ROYAL STAR' ROYAL STAR MAGNOLIA 5' -6' TALL B & B, 10' O.C. SHRUBS BUX -W BUXUS SINICA INSULARIS 'WINTERGREEN' WINTERGREEN BOXWOOD 12 " -15" B & B, 3' O.C. EUO -A EUONYMUS ALATA 'COMPACTA' DWARF BURNINGBUSH 12 " -15" B & B, 3' O.C. PERENNIALS \ANNUALS \GROUND COVERS \ORNAMENTAL GRASSES HEM -S HEMEROCALLIS ' STELLA D'ORU' STELLA D'ORO DAYLILLY NO. 1 CONT. PLANT 8" O.C. PEN -H PENNISETUM ALOPECUROIDES 'HAMELN' DWARF FOUNTAIN GRASS NO. 2 CONT. B & B 1.5' O.C. 1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE GRADE HARDWOOD MULCH I�I�III- GROUND COVER PLANTING SOIL TO BE 1 PART MANURE, 5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4 ". A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED FIBROUS PEATMOSS MAY BE USED IN LIEU OF PLANTING MIX. INCLUDE FERTILIZER AT APPROVED RATES. GROUND COVER OR FLOWER BED DETAIL NTS DOUBLE STRAND 12 GA. WIRE TWISHED IN RUBBER HOSE 6" FROM TOP OF— STAKES SUITABLE CORD BANDING BURLAP OR HEAVY CREPE TREE WRAP MATERIAL PLACE SOIL BALL SLIGHTLY HIGHER THAN EXISTING GRADE, MOUND SOIL OVER BALL FINAL GRADE CAP PLANTING PIT W/ 2 -3" OF CLAY TOPSOIL PRIOR TO MULCHING 3" LAYER OF SHEDDED HARDWOOD MULCH INSTALL FERTILIZER TABLETS OR SPIKES EARTH SAUCER =III -1 I —I I T —1 1 I- -1 I� I I� l 1 11 -1 I - III -III MIN. I II�� I II OTE: STAKE & GUY REES AS SHOWN IF SOIL BACKFILL TO BE 75% TE CONDITIONS DICTATE TOPSOIL & 25% PEAT (TAMPED) REMOVE BINDING EX ►STING SUBSOIL OR COMPACTED BACKFILL TREE PLANTING DETAIL o3 NTS PLANTING NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE - EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFER- ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE BY LANDSCAPE ARCHITECT. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR, 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 101bs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 5115s. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 2001bs. ROLLER, AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK. 3" LAYER OF SHREDDED HARDWOOD BARK MULCH - CAP PLANTING PIT W /ON SITE CLAY TOPSOIL PRIOR TO MULCHING (2 -3 ") EARTH SAUCER FIN. GRADE �� PLACE SOIL BALL SLIGHTLY HIGHER THAN FIN. GRADE. MOUND SOIL OVER BALL, RHODODENDRONS & OTHER ERICACEOUS PLANTS, PLACE AND MOUND PEATMOSS OVER BALL & MULCH H EAVI LY. INSTALL FERTILIZER TABLETS OR SPIKES EXISTING SOIL OR SOIL BACKFILL TO BE 75% COMPACTED BACKFILL TOPSOIL & 25% PEATMOSS TAMPED TO PREVENT 6" MAX. I SETTLEMENT. SHRUB PLANTING DETAIL K02 NTS 11, PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGRASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MOREfHAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN- TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS. 16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 " -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING , OPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACK- FILL AT APPROVED RATES. 19. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION. FINAL LOCATION AND SIZE ARE NOTED ON PLANS, 20. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY WHETHER AN EXISTING IRRIGATION SYSTEM IS PRESENT ON SITE AND WITHIN THE PROPOSED CONSTRUCTION AREA. IF AN EXISTING IRRIGATION SYSTEM IS PRESENT AND WILL BE AFFECTED BY THE NEW CONSTRUCTION, IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO EMPLOY AN IRRIGATION SUBCONTRACTOR TO REVIEW THE EXISTING SYSTEM. THE IRRIGATION SUBCONTRACTOR SHALL MODIFY THE EXISTING IRRIGATION SYSTEM AS NECESSARY TO ASSURE THE SYSTEM'S INTEGRITY, INCLUDING BUT NOT LIMITED TO ADDING OR MODIFYING AND DELETING EXISTING IRRIGATION HEADS, VALVE BOXES, WIRING OR OTHER ELEMENTS TO PROVIDE ADEQUATE IRRIGATION. 21. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST BE REMOVED W[ THIN ONE YEAR. WHEAT OR RYE OATS ANNUAL RYEGRASS NON- IRRIGATED* IRRIGATED DORMAT SEEDING ** TEMPORARY SEEDING DATES: JAN I FEB I MARI APR I MAYI JUN I JUL I AUGI SEPI OCTI NOVI DEC PERMANENT SEEDING I DATES IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS, USE MULCH. * LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. ** INCREASE SEEDING APPLICATION BY 50 %. FIGURE 5 -3 TEMPORARY SEEDING: KIND OF SEED 1000 SQ.FT. ACRE REMARKS WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 -1/2" DEEP SPRING OATS 2. Y LBS. 3 BU. COVER SEED TO 1 DEEP ANNUAL RYEGRASS 1 LB. 40 LBS. COVER SEED TO 1/4" DEEP * NOT NE(ESSARY WHERE MULCH IS APPLIED. SEEDING SCHEDULE o1 NTS C600) Pedcor Design Group Architecture / Project Managment: 335 Ridggeppoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) © Copyright 2004 Civil Engineer: ucvutuurrr. P E D C 0 R DEVELOPMENT C4. oalpp d ewrc ae l 'the build g Antfre� m�; arc�hl 9n Dn e"t thee type of structural, mechanical, and electrical systems. The drawinggss do not necessaft indicate or describe all work reauire� for full oerformance and completion of the requirements of the Contract. On the basis of the ggeeneral scope ini ated or described, the trade contractors small fumish all items required for the proper execution and completion of the work. Project: Carmel City Center Parcel ### 3rd Avenue Southwest Carmel, Indiana Phase 3 Building 4 LANDSCAPE PLAN Drawing Title: Revisions: Issue Date Drawn By Checked By 01/31/2005 KR5 RRO Certified By: Project Number: 24380 Sheet Number: C600