HomeMy WebLinkAboutMinutes Sub 06-27-12 (July Meeting)City of Carmel
Carmel Plan Commission
SUBDIVISION COMMITTEE
Wednesday, June 27, 2012 Meeting
LOCATION: CAUCUS ROOMS, 2 "d FLR
CARMEL CITY HALL
ONE CIVIC SQUARE
CARMEL, IN 46032
TIME: 6:00 P.M.
(DOORS OPEN AT 5:30 P.M.)
The Subdivision Committee will meet to consider the following items:
1. Docket No. 12060001 ADLS Amend: Einstein Bros Bagels, Merchants' Square.
(This is the former Hardee's site). The applicant seeks approval renovate the building exterior, along
with other modifications to the site. The site is located at 2350 E. 116`h St. and is zoned B-
8/Business. Filed by Rene Ortega of The IDGroup.
Jeff Spadey, Architect, on staff report comments.
• On the drive -thru clearance sign please remove the Einstein Bros. name, logo, and provide
dimensions on the sign. We agree. We will remove the logo and have revised signage drawings
that indicate the dimensions.
• Awning signage is limited to 3 square feet per main awning segment. Graphics for breakfast,
lunch, and catering on the awning are 6 inches tall on all three sides.
• Directional signage must be less than or equal to 3 square feet and less than or equal to three feet
tall in order to be considered exempt signage. Will drop them down to only 2 feet, making them
only 3 feet tall. However, they would like to maintain their logo on the directional signs. The
enter sign will be located right before you enter the drive thru lane and the exit will appear right
at the end of the drive thru lane on the other side.
• Pavement markings for the drive thru lane are too large to be considered exempt signage.
Paintings on the lane a large arrow with the words drive thru; however, this is now being
removed to just who an arrow for the direction into the drive thru to funnel patrons into the drive
thru because there is two -way traffic at this point.
• Brick exterior is being completely painted. Previous roofs will be removed.
• Corus roofline on the building will be painted a different color to draw attention to it.
• Will plant some trees around the patio area (i.e. Italian Cyprus). Relocate live trees and replace
the dead.
Further staff input.
• Would like to ensure that the ground sign on the west entry is going away. Yes. Recommends
approval of this item.
ONE CI\ IC SQUARE
Page 1 of 1
CARMEL, INDIANA 46032 317- 571 -2417
June 27, 2012 Meeting Agenda
Carmel Plan Commission Subd. Committee
Committee input.
• Needs to be pedestrian access from 116th Street to the front door. This will be provided in the
new plan.
• The railing around the patio uses a horizontal pattern rather than a vertical. From a liability
standpoint, concerned about children climbing on the railing. Petitioner will change this.
Conditions for approval:
1) Urban forester satisfaction.
2) Addition of the pedestrian walkway from 116th Street.
3) Meeting the signage requirements.
Docket No. 12060001 ADLS Amend: Einstein Bros Bagels, Merchants' Square Approved.
2. Docket No. 11100022 DP /ADLS: Gramercy PUD (Mohawk Hills Redevelopment).
The applicant seeks site plan and design approval for a multifamily residential infill and renovation
project on 116.4 acres. The site is located at approximately 751 E. 126th Street, at the southwest
corner of 126th St. and Keystone Pkwy. The site is zoned PUD/Planned Unit Development. Filed by
Matthew Griffin of Buckingham Companies.
• Revised commitments with the city council regarding landscaping are the buffer that borders
Almond Drive. Proposed upgrade to buffer yard D by virtue of meetings (western boundary).
Does not the process with regard to the ADLS.
• Does the PUD describe connectivity between this development and the neighborhoods to the west?
No, it does not cover that question. Gateway into Gramercy was originally the Fountains in a
much larger master plan to develop the area commercially and to connect on up. Idea was to push
south. PUD text does allow for 2 access points to Almond Drive.
o More connectivity, as opposed to less, is the way to go.
o If the city council committed them to guarantee to not do an access point on Almond, that
would be a change within the PUD.
• Is there a 3`h party Traffic Study to be conducted? A &F Engineering conducted the traffic study. It
is in preliminary form right now. A snap shot of today's traffic and its level of service. Counted
the existing Mohawk Dr. at the north end and the far west access drive. Both roundabouts
operate at an A level of service. 0.5% growth rate to predict levels of service in 2016. 126th
Street had a lot of added traffic with the 3 access points. With increased turning traffic off of
126t Street into this new development, we need new provisions for the traffic. Suggestion is to
incorporate left and right turn lanes to build in safety and efficiency. What is the equitable
amount of land dedicated to these lanes taken from the ROW on the north and south?
• Interested in putting in more bike paths rather than sidewalks. Incorporate good paths that people
will use.
Committee will continue to look at landscaping with respect to the street crossings and paths in July as
well as signage and architecture for townhome elevations and building materials.
ONE CIVIC SQUARE
Page 2 of 1
CARMEL, INDIANA 46032 317 - 571 -2417
June 27, 2012 Meeting Agenda
Carmel Plan Commission Subd. Committee
3. Special project 1: Committee to come up with criteria or conditions for which a PUD/ Planned Unit
Development rezone proposal should even be considered.
• Previous meeting comment regarding some measure of infrastructure readiness... Concern is that
when you have so many new developments in one area and they are dependent on a limited
number of roads that there is some infrastructure in place prior to the PUD being suggested.
o Factors such as the availability of funding, political willpower, land acquisition, and
surrounding construction projects all enter into the equation and are prioritized far about
residents' convenience.
o Should a massive development be proposed when some of those things are not yet in
place?
• Addition of general language that talks about providing flexible development in return for better
design in section 31 -06 -04 of the ordinance. Sections 1 -13 have been given new titles. The
decision criterion under item 5 signifies the reasons why PUDs can be necessary by either
providing mixed -use development, creating innovative unique design, or addressing unusual
physical site conditions.
o Effective periods discuss expiration dates and dates that discuss things that should have
happened. Shorten allowable time frames and define the limits by a case by case basis to
ensure that the permits do not become outdated.
o Add that between 3 -10 years, the area will be reevaluated and could be rezoned back to
its zoning before PUD designation.
• Staff cannot deny someone from applying for a PUD. However, they did used to have a standard
stating that PUD's could not occur west of Spring Mill.
o We don't necessarily want to make too many prerequisites because we still want to allow
the flexibility in case something does come up (i.e. infill projects after the city builds
out).
4. Special project 2: Committee to consider when a 'Traffic Study" should be considered mandatory
and/or when some other less comprehensive traffic study (e.g. Trip Generation Analysis) should be
initiated.
Tabled.
Lisa Stewart, Secretary
ONE CIVIC SQUARE
Brad G abow, Chairperson
File: SUBD - 2012- 0627.doc
Page 3 of 1
C, \RMEL, INDIAN .\ 46032 317 -571 -2417