HomeMy WebLinkAbout1099.95.1[LEGEND FOR FOUNDATION PLAN:
N
a.1
N
C.M.U. HALL
V
OIS
V
A.
C.M.U. WALL WITH BRICK
POURED CONCRETE WALL
M
CONTINUOUS FOOTING
L_ _ __. —_ - -_J
°r
+
V
(2) 4'x8' PRE -CAST LINTELS
c3
---
-
BEAM ABOVE (SIZE /TYPE NOTED)
W8x18 - DROPPED
BP
BEAM POCKET (SIZE NOTED ON DRAWINGS)
JWALL
PLATE LINE MARKER
a
PRE -CAST LINTELS (2) TYPE 'A'
(OR OTHER - SEE
J
BELOW) BOTTOM OF LINTELS AT 32—BELOW TOP OF
FOUNOAT I ON WALL (OR AS NOTED
OTHERWISE)
ul
A - 32' long F - 12'
L - 112'
cn
B - 40' G - 80'
M - 120'
C.- 48' H - 88'
N - 128'
W
0 - 56' I - 96'
0 - 136'
E - 64' J - 104'
P - 144'
Iegend.fnd01
FOUNDATION NOTES:
I. ALL FOUNDATION WALLS TO BE 8' THICK UNLESS NOTED OTHERWISE (U.N.O.)
2. DIMENSIONS ARE TO FACE OF WALL TYPICAL (U.N.O.)
3. TOP OF STEEL BEAMS TO ALIGN WITH TOP OF FOUNDATION WALLS (U.N.O.)
4. TOP OF CRAWL BEAMS ((4)2x12) TO ALIGN WITH BOTTOM OF FLOOR JOISTS (U.N.O.)
5. USE PRIMARY SEWER ENTRANCE LOCATION UNLESS SEWER LATERAL IS ON OPPOSITE
SIDE OF DRIVE THEN USE ALTERNATE ENTRANCE LOCATION.
6. FOUNDATION DIMENSIONS TO 8' PORTION OF FOUNDATION WALL (U.N.O.)
1. ALL BASEMENT POURED CONCRETE WALLS TO BE 8' -0' IN HEIGHT (U.N.O.)
8. ALL PRECAST LINTELS SHALL HAVE LINTEL POCKETS AS REQUIRED
- TYPICAL POCKET SIZE TO BE 8 -1 /8'w x 8 -1 /8'h X 4'd (U.N.O.)
notes.fnd01
FOUNDATION PLAN
B ELEVATION FULL BASEMENT
01
4
owl'
SCALE: 1/4' = 1'-0*
�+
O
N
a.1
N
V
OIS
V
A.
�
~ V
M
u
°r
+
V
c3
W
m
w
w
z
z
1
a
o
J
si
DATE:
�, i�F ,��-
m
Q�
d
o
2
W
cn
z
z
1
a
o
J
Q
a_
ul
F-
V
cn
F
m
Z
W
O
�
m
i
w
cu
CW
z
O
Lo
Lo
Z
0
co
O
O
J
Z
o
M
=
)
0
W
W
W
O
Q
L.L;
si
DATE:
�, i�F ,��-
m
Q�
d
o
2
W
z
1
a
J
Q
a_
F-
V
Z
Z
W
O
�
m
i
O
v7
CW
z
O
m
0
Z
0
O
O
J
o
M
=
)
0
si
DATE:
�, i�F ,��-
m
Q�
o
2
W
z
a
J
a_
F-
Z
Z
W
O
�
i
O
CW
O
m
0
Z
O
O
J
o
M
=
)
LDLO
-0
�0
L.L;
wZ
0
z
z�m
CM
J
O
Q
a_
LL_
O
O
si
DATE:
�, i�F ,��-