January 9, 2013
Jesse Pohlman
Faegre Baker Daniels LLP
600 E 961h St
Indianapolis,IN 46240
•
RE:Meridian&Main Phase 1,Parcel 2 UV&V
Dear Mr. Pohlman:
The following letter represents comments for this project specifically addressing the area of alternative transportation.
I have reviewed the drawings submitted for the January 16,2013 Technical Advisory Committee meeting and
comments from the Alternative Transportation review have been satisfactorily addressed for these variances.
It is critical that this office be made aware of all modification made on the plans being re-submitted,particularly if any
such changes are considered"new"or fall outside of our previous reviews.Please provide revised plans indicating all
revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan
Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent.
reviews.
If you have questions,please contact me at 571-2417.
Sincerely,
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Alexia Donahue-Wold,Department of Community Services
Engineering Department Review
Project File
Page 1
ONE CIVIC SQUARE CARvIEL,INDIANA 46032 317/571-2417
•
(CV i%72--A ;If)
•
CLAY TOWNSHIP REGIONAL WASTE DISTRICT:
CARMEL TECHNICAL ADVISORY COMMITTEE MEETING COMMENTS
Ryan Hartman,District Engineer
CA Clay Township Regional Waste District
10701 N.College Avenue, Suite A Indianapolis,Indiana 46280
Phone-317-844-9200 Mobile-317-997-0618 Website-www.ctrwd.org Email -ryan.hartman @ctrwd.org
Date: Wednesday, January 16, 2013
Place: Dept. of Community Services Conference Room, 3`a Floor,Carmel City Hall.
Time: 9:00 a.m.
9:00 a.m. Meridian & Main, Phase 1, Parcel 2.
The applicant seeks the following Use Variance and Development Standards Variance
approvals to allow a one story retail/service use to comprise of 100% of the gross floor area
•N;v of the building:
Docket No. 12120004 UV ZO Chptr. 23B.05.02: Retail and service uses
maximum 15% of GFA required, 100% requested.
Docket No. 12120005 V ZO Chptr. 23B.08.03(A)(1): Min. Bldg Height: 38 feet
and 3 floors required, 1 floor requested.
The site is located at the northeast corner of Main Street and US 31. It is zoned B-6/Business
within the US 31 Overlay Zone. Filed by James Browning on behalf of Meridian 131, LLC.
-Not in CTRWD service area.
9:15 a.m. Docket No. 12120015 ADLS: The Seasons of Carmel (Aramore PUD).
The applicant seeks site plan and design approval for a 14-building multifamily residential
development comprising of townhomes and apartments. The site is located at 9801 Westfield
Blvd. and is zoned PUD/Planned Unit Development. Filed by Pittman Partners, Inc.
-Waiting on Plan Review Fees prior to commencing with a formal plan review.
9:30 a.m. Docket No. 12120016 DP/ADLS: Butler Hyundai Development at 96th/Randall.
The applicant seeks site plan and design approval for a 37,500 sq. ft. car dealership building,
2 outlots, and Randall Bypass road. The site is located at approximately 4200 F. 96th St., west
of Randall Dr. The site is zoned B-3/Business and partially lies within the Floodplain &
Floodway Districts. Filed by Timothy Ochs of Ice Miller, LLP, on behalf of 4148 96th St,
LLC.
-Not in CTRWD service area.
File: TAC2013-0116.doc
Page 1 of 1
WWW.CARMEL.IN.GOV ONE CIVIC SQ. CARMEL.IN 46032 (317)571-2417
Citizens Water's Comments for:
JAN. 16 TECHNICAL ADVISORY COMMITTEE MEETING
Date: Wednesday,January 16, 2013
Place: Dept. of Community Services Conference Room,3`d Floor,Cannel City Hall.
Time: 9:00 a.m.
Citizens Water has reviewed the three below described Docket items. All three
parcels are within the Carmel Utilities Service Area, therefore Citizens Water has
no objection to them.
Duane A. Whiting
Real Estate- Property Planner
citizens
energy group"
tft s Gas I Citizens Titermet t CItt era Water
1220 Waterw:•y Boulevard
Indianapolis, IN 46202
Tel 317-263-6416
dwhiting @citizensenernygroup.com
9:00 a.m. 'Meridian & Main, Phase 1,Parcel 2.
The applicant seeks the following Use Variance and Development Standards Variance
approvals to allow a one story retail/service use to comprise of 100% of the gross floor area
.4■1114,, of the building:
Docket No. 12120004 UV ZO Chptr. 23B.05.02: Retail and service uses
maximum 15% of GFA required, 100% requested.
Docket No. 12120005 V ZO Chptr. 23B.08.03(A)(1): Min. Bldg Height: 38 feet
and 3 floors required, 1 floor requested.
The site is located at the northeast corner of Main Street and US 31. It is zoned B-6/Business
within the US 31 Overlay Zone. Filed by James Browning on behalf of Meridian 131, LLC.
9:15 a.m. Docket No. 12120015 ADLS: The Seasons of Carmel (Aramore PUD).
The applicant seeks site plan and design approval for a 14-building multifamily residential
development comprising of townhomes and apartments. The site is located at 9801 Westfield
Blvd. and is zoned PUD/Planned Unit Development. Filed by Pittman Partners, Inc.
• 9:30 a.m. Docket No. 12120016 DP/ADLS: Butler Hyundai Development at 96th/Randall.
The applicant seeks site plan and design approval for a 37,500 sq. ft. car dealership building,
2 outlots, and Randall Bypass road. The site is located at approximately 4200 E. 96th St., west
of Randall Dr. The site is zoned B-3/Business and partially lies within the Floodplain &
Floodway Districts. Filed by Timothy Ochs of Ice Miller, LLP, on behalf of 4148 96th St, •
LLC. File: TAC2013-0116.doc
Page 1of1
WWW.CARMEL.IN.GOV ONE CIVIC SQ. CARMEL.IN 46032 (317)571-2417
To , 4RvEY®R'S op,
o r, Ott` \-\\� '1��, 1 ( 11'r!Ul ii-.."•• — _ ∎ ,10
� , ; -irs It l I it _ � .�' � « r i ( � ' l 1ti r V . Ir s / �
1 ' i ,4n..L ' �`l � I _I. I } ) �I t ° � �•
��.. Xenton C. 1-yard, CrF.7Vt
Suite r8b
Surveyor of J-familton County One J-lamilton County Square
'Phone(317)776-8495 Noblesville, Indiana 46060-2230
Fax (317)776-9623
January 7, 2013
Faegre,Baker, Daniels, LLP
ATTN: Jesse Pohlman
600 East 96th Street, Suite 600
hidianapolis, IN 46240
VIA E-MAIL: jesse.pohlman(&,,FaegreBD.com
RE: Meridian and Main, Parcel 2 Use Variance
Dear Mr. Pohlman:
We have reviewed the use variance request submitted to the Hamilton County Surveyor's Office
on December 14, 2012, for this project and have the following comments:
1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of
Cannel.
2. The proposed project does not fall in a Cannel Wellhead Protection Zone.
3. The proposed project does falls in the Williams Creek Regulated Drain Watershed.
4. The Hamilton County Surveyor's Office has no comments or concerns on the Use
Variance Request.
Should you have any questions, I can be reached at 317-776-8495.
Sincerely,
a
,
Greg Hoyes,AC,CFM, CPESC
Plan Reviewer
CC: Angie Conn—Carmel DOCS, John Thomas—Carmel Engineering
Dave Barnes—Cannel Engineering, Greg Ilko—Crossroad Engineers
Conn, Angelina V
From: Pohlman, Jesse M. [Jesse.Pohlman @faegrebd.com]
Sent: Friday, December 14, 2012 2:52 PM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers,
William P; Huffman, David; Thomas, John G; greg.hoyes @hamiltoncounty.in.gov;
gilko @crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas @hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M;
Green, Timothy J; Ellison, Christopher M; Krueskamp, Theresa A; Forward for Westermeier,
Mark; jason.lemaster @hamiltoncounty.in.gov; brooke.gajownik @hamiltoncounty.in.gov;
Jason.kirkman @mybrighthouse.com; shirley.hunter @duke-energy.com;
gary.mcnamee @duke-energy.com;jlclark @vectren.com; dan.davenport @aes.com;
dwhiting @citizensenergygroup.com; rfarrand @ccs.kl2.in.us; ryan.hartman @ctrwd.org;
troy.yackle @ sug.com; doland.w.wise @ usps.gov; sk4986@att.com
Cc: Jamie Browning; David Lach
Subject: Carmel TAC Item Agenda I NEC US31 & Main Street
Attachments: Use Variance Application.pdf
December 14, 2012
Dear TAC Members:
On behalf of Meridian 131, LLC, a use variance application was filed today for the 3 acres+1- located on the northeast
corner of Main Street and US 31 to allow for a one-story financial institution. It is anticipated this request will appear for
a public hearing at the January 29, 2013, Board of Zoning Appeals meeting.
Enclosed please find for your review in advance of the January 16, 2013, Carmel Technical Advisory Committee meeting
the following documents:
• Use Variance petition and supporting documents;
• Existing and proposed site conditions; and
• Illustrative and conceptual building elevations.
Hardcopies of these materials are being provided to you if the Department of Community of Services has identified
"paper" as your plan submittal preference, so if you do not receive hardcopies of these materials, but wish to,then
please do not hesitate to contact me and I will be happy to provide those to you.
If you have any questions or comments in advance of the TAC meeting regarding this proposal, then please do not
hesitate to contact me or another member of the development team (Jamie Browning with Meridian 131 or David Lach
with Cripe).
Otherwise,thank you for your time and we look forward to your comments.
Jesse
Jesse M. Pohlman
Land Use Consultant
jesse.pohlman @FaegreBD.com