HomeMy WebLinkAbout1077.95.3U
N
t
c.0
d
L
o,
C:
r;
0
Ln
I �
O 0
CV U
Mall
W
LLJ
t- Q
Q Z
F-
O LLJ
J —I
123
124
125
126
127
128
129
130
131
132
133
134
135
136
i37
13s
139
140
141
142
143
144
145
ROOM SCHEDULE
C ❑RRID ❑R
VP - HARRY
COATS
COPY
FILES
MANAGER - DONNA
OPEN OFFICE
DIRECTOR
- PAM
DIRECTOR
- MARLENE .
DIRECTOR
- DAVE
VP - PEGGY
DIRECTOR
- LISA
MANAGER
- DEAN
CORRIDOR
103
DIRECTOR
- ACCOUNTING
MANAGER
- B03
MANAGER
FUTURE
MANAGER
- FUTURE
DIRECTOR
- JIM
PC'S
OPEN OFFICE
MANAGER
- TOM / DICK
SERVIER
FILES
PRINTER
LOCK
ROOM SCHEDULE
CEILING LEGEND
REFLECTED CEIUNIJ NOTES
1. ALL 2 X 4 LIGHTING FIXTURES TO HAVE PRISMATI(LENSE EXCEPT
ROOMS CONFERENCE 109 AND OFFICE 112 TO HAE PARACUBES.
2. VERIFY EXISTING LIGHTING /HVAC /SPRINKLER /CEILIG GRID /CEILING
TILE AND REUSE WHERE EVER POSSIBLE.
3. PLACEMENT OF FIXTURES FOR OPTIMUM LIGHT DIfRIBUTION.
COORDINATION OF LIGHT FIXTURE LOCATIONS AN
SPRINKLERS/HVAC PLACEMENT MUST BE MADE IKHE FIELD OR
SUBMITTAL OF THIS PLAN CAN BE MADE BY THE WNER TO THE
HVAC & SPRINKLER CONTRACTORS FOR COORDINTION OF THEIR
WORK PRIOR TO INSTALLATION.
GENERAL NOTES
1. ALL WORK ON PROJECTS MUST COMPLY WITH LL CURRENT
LOCAL,STATE AND NATIONAL CODES APPL1CAEc.
2. REVIEW ALL DRAWINGS (ARCHITECTURAL, PLUISING. ELECTRICAL,
HVAC) CONCERNING SLEEVES, OUTLETS, BOXE!ANCHOR VENTS,
OPENINGS. ETC. THAT MAY BE REQUIRED. EAC RESPECTIVE
TRADE IS RESPONSIBLE FOR PROVIDING AND 116TALUNG THESE
ITEMS.
3. CONTRACTOR TO VERIFY DIMENSIONS AND EXCING SITUATIONS
AND NOTIFY EDEN DESIGN ASSOCIATES OF ANf DISCREPANCIES
BEFORE PROCEEDING WITH CONSTRUCTION
4. EACH CONTRATOR SHALL PROVIDE ALL BARRIGDES. DUST
PARTITIONS, ETC. AS REQUIRED BY LAW AND A' OTHERWISE
REQUIRED.
5. THESE DRAWINGS REFLECT DEMOLITION AND NW CONSTRUCTION
AS THE DESIGN INTENT. THE CLIENT SHALL CODUCT AND BE
RESPONSIBLE FOR EXECUTING THE CONSTRUCT)N THESE PLANS
INDICATE.
8. PLACEMENT OF FIXTURES ARE FOR OPTIMUM LINT DISTRIBUTION.
COMPLETE TECHNICAL ENGINEERING IS BY OTHBS.
CONFIRMATION BY ELECTRICAL CONTRACTOR O ENGINEER
IS REQUIRED FOR ANY INFORMATION INDICATEDON THIS
DRAWING FOR PROPER ADHERENCE TO CODES, IRCUITRY OR
POWER REQUIREMENTS.
7. THE DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT
IN TERMS OF ARCHITECTURAL DESIGN CONCEPT THE DIMENSIONS
OF THE BUILDING, THE MAJOR ARCHITECTURAL LEMENTS AND THE
TYPE OF STRUCTURAL, MECHANICAL AND ELEC1RCAL SYSTEMS.
AS SCOPE DOCUMENTS THE DRAWINGS DO NOTNECESSARILY
INDICATE OR DESCRIBE ALL WORK REQUIRED F01 FULL
PERFORMANCE AND COMPLETION OF THE REQUIIEMENTS OF THE
CONSTRUCTION DOCUMENTS ON THE BASIS OF'HE GENERAL
SCOPE INDICATED OR DESCRIBED. THE TRADE CONTRACTORS
SHALL FINISH ALL ITEMS REQUIRED FOR THE PROBER EXECUTION
AND COMPLETION OF THE WORK.
8. THE ADA REQUIREMENTS ARE NON - SPECIFIC IN RANY AREAS
AND ARE A CIVIL RIGHTS LAW AND NOT A CODE, ULTIMATELY,
MANY SPECIFICS WILL BE CLARIFIED BY LITIGATION. THE
DESIGNER/ ARCHITECT DOES NOT WARRANT COWUMCE WITH
THE ADA REQUIREMENTS. HOWEVER, BASED ONOUR
UNDERSTANDING OF THE ADA REQUIREMENTS AND GUIDELINES. IT
IS OUR OPINION THAT THESE PLANS SEEM TO BEMN COMPLIANCE
WITH THE LAW.
U
z
Q
',�K z
o (D
J
Qi , e ,
J®
Q
Z
N
L u o °°
0(,D CI) 0,1_L O
�z I
Z Z q
qt
O_(XD
MEG
U w
—Q n
In
CN
I'`D LL
�--a O U
�zu�
z
cf) —z
_Y) 00 Q
Lc)
�WrK
az
0 n Cn z
LLJ
U�Q °z rr- U
WSW 0
>� 0 °
�� --�Qw
0 U
—zE-- w
E---I L J O --�
WoIn�x W
DATE:
10 -20 -95
North
CONSTRUCTION LEGEND
Z. EXISTING WALLS TO BE REMOVED
EXISTING WALLS TO REMAIN
NEW WALL CONSTRUCTION
CLIENT APPROVAL
SCALE:
1/8 7y =1 ' -0"
PROJECT NO.
000335
,rrrrrrnrrrr�'
No. 2028
STATE OF
J
SHEET:
3 OF 3
100
WAITING
2x4 FLUORESCENT FIXTURE WITH PRISMATIC LENS
2x4 FLUORESCENT FIXTURE PARACUBE
KEY LOCK
101
102
CLOSET
RECEPTION
103
MAIL ROOM
104
FILES
KEY
LOCK
2x2 FLUORESCENT FIXTURE
105
OPEN OFFICE
106
FILES
KEY
LOCK
®
ISIRSDIFJGUSORREMAIN AIR SUPPLY
KEY
LOCK
107
NOT USED
OO
AIR DIFFUSER
KEY
LOCK
108
COPY / FILES
KEY
LOCK
O
LINEAR AIR DIFFUSER
KE-Y
LOCK
109
CONFERENCE ROOM
El
RETURN AIR SUPPLY
KEY
LOCK
110
COATS
0
RECESSED DOWNLIGHT
KEY
LOCK
111
GALLEY
O
RECESSED WALL WASHER DOWNLIGHT
112
PRESIDENT - RICK
KEY
LOCK
®
EXIT SIGN
113
ADMINISTRATION
KEY
LOCK
1 4
MANAGER -ERIC
115
CORRIDOR
116
VP - DOUG
KEY
LOCK
117
MANAGER - WAYNE
KEY LOCK
118
CORRIDOR
119
MANAGER - FUTURE
120
BREAK ROOM
121
IM PRINTER
122
CONFERENCE ROOM
REFLECTED CEIUNIJ NOTES
1. ALL 2 X 4 LIGHTING FIXTURES TO HAVE PRISMATI(LENSE EXCEPT
ROOMS CONFERENCE 109 AND OFFICE 112 TO HAE PARACUBES.
2. VERIFY EXISTING LIGHTING /HVAC /SPRINKLER /CEILIG GRID /CEILING
TILE AND REUSE WHERE EVER POSSIBLE.
3. PLACEMENT OF FIXTURES FOR OPTIMUM LIGHT DIfRIBUTION.
COORDINATION OF LIGHT FIXTURE LOCATIONS AN
SPRINKLERS/HVAC PLACEMENT MUST BE MADE IKHE FIELD OR
SUBMITTAL OF THIS PLAN CAN BE MADE BY THE WNER TO THE
HVAC & SPRINKLER CONTRACTORS FOR COORDINTION OF THEIR
WORK PRIOR TO INSTALLATION.
GENERAL NOTES
1. ALL WORK ON PROJECTS MUST COMPLY WITH LL CURRENT
LOCAL,STATE AND NATIONAL CODES APPL1CAEc.
2. REVIEW ALL DRAWINGS (ARCHITECTURAL, PLUISING. ELECTRICAL,
HVAC) CONCERNING SLEEVES, OUTLETS, BOXE!ANCHOR VENTS,
OPENINGS. ETC. THAT MAY BE REQUIRED. EAC RESPECTIVE
TRADE IS RESPONSIBLE FOR PROVIDING AND 116TALUNG THESE
ITEMS.
3. CONTRACTOR TO VERIFY DIMENSIONS AND EXCING SITUATIONS
AND NOTIFY EDEN DESIGN ASSOCIATES OF ANf DISCREPANCIES
BEFORE PROCEEDING WITH CONSTRUCTION
4. EACH CONTRATOR SHALL PROVIDE ALL BARRIGDES. DUST
PARTITIONS, ETC. AS REQUIRED BY LAW AND A' OTHERWISE
REQUIRED.
5. THESE DRAWINGS REFLECT DEMOLITION AND NW CONSTRUCTION
AS THE DESIGN INTENT. THE CLIENT SHALL CODUCT AND BE
RESPONSIBLE FOR EXECUTING THE CONSTRUCT)N THESE PLANS
INDICATE.
8. PLACEMENT OF FIXTURES ARE FOR OPTIMUM LINT DISTRIBUTION.
COMPLETE TECHNICAL ENGINEERING IS BY OTHBS.
CONFIRMATION BY ELECTRICAL CONTRACTOR O ENGINEER
IS REQUIRED FOR ANY INFORMATION INDICATEDON THIS
DRAWING FOR PROPER ADHERENCE TO CODES, IRCUITRY OR
POWER REQUIREMENTS.
7. THE DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT
IN TERMS OF ARCHITECTURAL DESIGN CONCEPT THE DIMENSIONS
OF THE BUILDING, THE MAJOR ARCHITECTURAL LEMENTS AND THE
TYPE OF STRUCTURAL, MECHANICAL AND ELEC1RCAL SYSTEMS.
AS SCOPE DOCUMENTS THE DRAWINGS DO NOTNECESSARILY
INDICATE OR DESCRIBE ALL WORK REQUIRED F01 FULL
PERFORMANCE AND COMPLETION OF THE REQUIIEMENTS OF THE
CONSTRUCTION DOCUMENTS ON THE BASIS OF'HE GENERAL
SCOPE INDICATED OR DESCRIBED. THE TRADE CONTRACTORS
SHALL FINISH ALL ITEMS REQUIRED FOR THE PROBER EXECUTION
AND COMPLETION OF THE WORK.
8. THE ADA REQUIREMENTS ARE NON - SPECIFIC IN RANY AREAS
AND ARE A CIVIL RIGHTS LAW AND NOT A CODE, ULTIMATELY,
MANY SPECIFICS WILL BE CLARIFIED BY LITIGATION. THE
DESIGNER/ ARCHITECT DOES NOT WARRANT COWUMCE WITH
THE ADA REQUIREMENTS. HOWEVER, BASED ONOUR
UNDERSTANDING OF THE ADA REQUIREMENTS AND GUIDELINES. IT
IS OUR OPINION THAT THESE PLANS SEEM TO BEMN COMPLIANCE
WITH THE LAW.
U
z
Q
',�K z
o (D
J
Qi , e ,
J®
Q
Z
N
L u o °°
0(,D CI) 0,1_L O
�z I
Z Z q
qt
O_(XD
MEG
U w
—Q n
In
CN
I'`D LL
�--a O U
�zu�
z
cf) —z
_Y) 00 Q
Lc)
�WrK
az
0 n Cn z
LLJ
U�Q °z rr- U
WSW 0
>� 0 °
�� --�Qw
0 U
—zE-- w
E---I L J O --�
WoIn�x W
DATE:
10 -20 -95
North
CONSTRUCTION LEGEND
Z. EXISTING WALLS TO BE REMOVED
EXISTING WALLS TO REMAIN
NEW WALL CONSTRUCTION
CLIENT APPROVAL
SCALE:
1/8 7y =1 ' -0"
PROJECT NO.
000335
,rrrrrrnrrrr�'
No. 2028
STATE OF
J
SHEET:
3 OF 3