HomeMy WebLinkAbout05050195-Sq. Ft.BE AN
ON CONSTRUCTiC
iPACE. IF AN AREA SO LABELED
MUST E OFF[CE OF BL
I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE
ATTACHED PLOT OR SITE PLAN AS SUBMI1-FED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY
DEPARTMENT OF COMMUNITY SERVICES. I FURTHER CERTIFY THAT THE .1OINING OF WATER SUPPLY PIPING
SHALL BE MADE WITH LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESULT IN A REPLACEMENT
OF THE SYSTEM, PLI
to t
NOTE: Additional plans and/or informat on may be required, if submitted plans are not of suMcient clarity or detail, to
indicate the nature and extent of the work proposed and to determine compliance with all applicable codes and
ordinances
]~n addition to the above, the Building Inspector ,w. ill be provided with any information relative to commitments
made in the zoning process for the property involved. This would include any Plan Commission and/or BZA
activity.
ADDRESS: __