Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout05040003.9G1
L
K
J
H
F
E
C
11
A
\ r
PROTECT EXISTING •� T
SANITARY SEWER DURING i
CONSTRUCTION.
S
I
NSCAPING, I �/
T S & BUSHES
T E REMOVED
I I
I
6
i
i
i
i
1 12 13
9
'REFS & BUS'r'FS
TO BE REMOVED ET a
� I
I
4 15
Pct
cc\
6
7
t
L
i
i
i
i
1
6%
R401500 l
I
r
PROTECT EXISTING GAS
AND STORM SEWER
DURING CONSTRUCTION
I
11 {12 113
II
I I
I I
I I
I I
II
I I
I I
I I
I I
I I
I I
•-- •- L1 —• - -' wJ
I I
I I �
II
II
I I (
II I
I I i
I I (
II
II I
II
I I i
II I
I I i
LI I
II
II
I I
PROTECT EXISTING STORM
SEWER DURING
II I CONSTRUCTION
I I (
II
II
II I
II I
SIGN TO B REMOVED
II I
I I
II
II
I I i
II I
II I
II
I I
II i
II
II i
II
II i
II I
I
II {
II
II I
II I
II
II
I I
II
II
II
II (
II i
II I
{I
II
II (
II i
II I
II i
II
I I
II
II (
II I
II I
I I
_.. - - -iL
I I
O II
I I
II
I I
I I
I I
2
13
14
EXISTING LEGEND:
UN
DESCRIPTION:
SWIMMER
EXISTING ASPHALT
EXISTING CONCRETE
$
TEMPORARY BENCHMARK
Q
SECTION CORNER
. — • — •
REBAR FOUND
Q)
CUT Y' FOUND
(s
RAILROAD SPIKE FOUND
®
MAG NAIL SET
GAS LINE
MAG NAIL FOUND
®
ELECTRIC OUTLET
TOP OF RIM
LIGHT POLE
Q
ELECTRIC TRANSFORMER
10
ELECTRIC METER BOX
4-
GROUND LIGHT
4D-
TELEPHONE PEDESTAL
®
END SECTION
CORRUGATED PLASTIC PIPE
SIGN
©
GAS METER
J
HANDICAP SYMBOL
�a
WATER VALVE
CONCRETE
FIRE HYDRANT
w�
WELL
SQUARE FEET
HOSE BIB
DEED BEARING /DISTANCE
SANITARY MANHOLE
HOLEY MOLEY SAYS
"DIG SAFELY"
"IT'S THE LAW"
CALL 2 WOR, ING DAYS BEFORE YOU DIG
1 -800- 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IC8 -1 -26.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION' SERVICE TWO (2) WORKING
DAYS buy ORE COMMENCING WORK.
4
0
DESCRIPTION:
SWIMMER
DRAINAGE MANHOLE
INLET
BUSH
2
DECIDUOUS TREE
. — • — •
FARM FIELD FENCE
DESIGN PHASE
FLOWLINE
• • •
- -- exec - --
UNDERGROUND ELECTRIC
- -- gas - --
GAS LINE
INV
INVERT
TOR
TOP OF RIM
TOC
TOP OF CASTING
RCP
REINFORCED CONCRETE PIPE
PVC
POLYVINYL CHLORIDE PIPE
VCP
VITRIFIED CLAY PIPE
CMP
CORRUGATED METAL PIPE
CPP
CORRUGATED PLASTIC PIPE
E.S.
END SECTION
R/W
RIGHT —OF —WAY
TBM
TEMPORARY BENCHMARK
CONC.
CONCRETE
SQ.
SQUARE
SF
SQUARE FEET
(D)
DEED BEARING /DISTANCE
(M)
MEASURED BEARING /DISTANCE
DEMOLITION LEGEND:
DESCRIPTION:
SWIMMER
1
CONCRETE TO BE REMOVED
STONE TO BE REMOVED
rI • REMOVED
I�
MISC. ITEM TO BE REMOVED
DESIGN PHASE
WALLS & FENCE TO BE REMOVED
UTILITIES TO BE REMOVED
DEMOLITION NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND
DISPOSAL OFF —SITE OF ALL ITEMS SHOWN ON THE DEMOLITION PLAN
INCLUDING ITEMS ENCOUNTERED DURING EXCAVATION OF BUILDING
FOUNDATIONS AND UTILITY PLACEMENT.
2. PRIOR TO STARTING DEMOLITION, IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO OBTAIN ALL PERMITS REQUIRED BY LOCAL
GOVERNMENTAL AGENCIES.
3. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL UTILITY
COMPANIES FOR THE DISCONNECTION AND REMOVAL OF SERVICES TO
EXISTING STRUCTURES.
4. ITEMS SHOWN ON THE DEMOLITION PLAN TO BE SALVAGED SHALL BE
TRANSPORTED TO A LOCATION SPECIFIED BY THE OWNER OR HIS\
HER REPRESENTATIVE.
5. ITEMS OF SALVAGEABLE VALUE TO THE CONTRACTOR MAY BE
REMOVED WITH THE PERMISSION OF THE OWNER OR HIS \HER
REPRESENTATIVE. THE CONTRACTOR SHALL NOT STORE THESE ITEMS
ON SITE.
6. THE CONTRACTOR SHALL NOT USE EXPLOSIVES OR BURN DEBRIS.
7. CONDUCT DEMOLITION OPERATIONS TO ENSURE MINIMAL
INTERFERENCE WITH ROADS, SIDEWALKS AND ANY OTHER ADJACENT
OCCUPIED FACILITIES.
8. DO NOT CLOSE OR OBSTRUCT ROADS, SIDEWALKS, OR ANY OTHER
OCCUPIED FACILITIES WITHOUT PERMISSION FROM THE LOCAL
AUTHORITY HAVING JURISDICTION AND \OR PROPERTY OWNERS.
9. THE CONTRACTOR SHALL ENSURE SAFE PASSAGE OF PERSONS
TRAVERSING THROUGH OR AROUND THE CONSTRUCTION SITE.
10. THE CONTRACTOR SHALL PROTECT SURROUNDING STRUCTURES,
UTILITIES, AND OTHER FACILITIES FROM DAMAGE DURING DEMOLITION
AND REMOVAL OPERATIONS.
11. BUILDING STRUCTURES INCLUDING FOUNDATIONS AND BASEMENTS,
SHALL BE REMOVED AND BACKFILLED WITH APPROVED BACKFILL
MATERIAL SHALL BE PLACED IN LIFTS NOT EXCEEDING EIGHT INCHES
IN THICKNESS. EACH LIFT SHALL BE COMPACTED IN ACCORDANCE
WITH THE GEOTECHNICAL REPORT, OR IF SUCH REPORT IS
UNAVAILABLE, TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY
AS DETERMINED BY ASTM D -1557, MODIFIED PROCTOR METHOD +/-
3% OF OPTIMUM MOISTURE CONTENT.
12. UTILITIES SHALL BE REMOVED AND THE TRENCHES BACKFILLED WITH
APPROVED BACKFILL MATERIAL. BACKFILL MATERIAL SHALL BE
PLACED IN MAXIMUM EIGHT INCH LIFTS AND COMPACTED IN
ACCORDANCE WITH THE GEOTECHNICAL REPORT OR TO A MINIMUM
OF 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM
D -1557, MODIFIED PROCTOR METHOD +/– 3% OF OPTIMUM
MOISTURE CONTENT.
13. TRANSPORT DEMOLITION MATERIAL TO AN INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT PERMITTED LANDFILL SUCH AS TWIN
BRIDGES LANDFILL IN DANVILLE, INDIANA.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THE
CONSTRUCTION SITE AND SURROUNDING AREAS ARE FREE OF
ACCUMULATED DEBRIS.
UTILITY STATEMENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in– service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
i
i
Y
-'
O
5
W
Q
1
20 0 10 20
( IN FEET )
1 inch = 20 ft.
05 -110
(ASSUMED NORTH)
DESIGN PHASE
CONSTRUCTION
REVISION RECORD
C1 A
IL SHEET OF
0 C. y �.
���� Q-e, • ��srFR GHQ �'�
NO
– PE10300058
' STATE OF
', ," o;;
;'`
Rw,,o, c. HJ
DATE: 3-1 18 120D5
DWN BY: J RD
CHKD. BY: ACH
SCALE: 1 "= 20'
DATE: 03/18/05
I— m
W —'QW
�3;
rV00
p =<
LL Q) U
-'
O
5
W
Q
PROJECT NUMBER
05 -110
DESIGN PHASE
CONSTRUCTION
PLAN NUMBER
C1 A
IL SHEET OF