HomeMy WebLinkAbout05040015.4SITE GRADING PLAN
SCALE = 1' = 30'
P
L(, C
r
CASTING
>.
MARK
y
r,.
SPOT ELEVATION (TOP OF CURB)
wv
1
'... ,...
p £e § ' �
(� +�}p��j 1 ! V
NEENAH
R- 3340 -B
i
_. _.. .. .... ._.
__... .
SPOT ELEVATION
882.95
FIRE HYDRANT
NEENAH
R -3236
CURB INLET
STR -3
882.50
x
885.30
NEENAH
R- 3340 -B
INLET
831
CONTOUR
B.
DECIDUOUS TREE
❑ -
AREA LIGHT 1
0
EVERGREEN TREE
El=_0
AREA LIGHT 2
R- 3340 -B
BU`�H
STR -5
UTILITY POLE
X
FENCE
--
GUY ANCHOR
-a-
4.,
IT;
TELEPHONE MANHOLE
O
TRAFFIC SIGNAL POLE
CTI
TELEPHONE RISER
®
TRAFFIC SIGNAL MANHOLE
❑1
TRANSFORMER
OD
DRAINAGE MANHOLE
.. Aar � ..a: _..
UNDERGROUND GAS
3
:i ......... _..�
t
SANITARY MANHOLE
�u
UNDERGROUND TELEPHONE
wi
CURB INLET
uGE
7
®
ROUND INLET (24" TYPICAL)
STM
UNDERGROUND STORM
®
p.�
SAN
UNDERGROUND SANITARY
C
CLE AN OUT
-w
w- WATER LINE
•
PIPF BOLLARD
--
PROPOSED GRADING LEGEND
--
END SECTION
STR -13
--
881.93
--
--
END SECTION
IL
d
SAN MANHOLE
STR -14
i
T
--
884.50
W/ GRINDER PUMP
_
r.
DATE: 4 -1 -05
F.
SCALE: 1" = 30`
PROJECT
SITE GRADING PLAN
SCALE = 1' = 30'
• NEW SANITARY STRUCTURE
•�� NEW SANITARY SEWER CLEANOUT
■ NEW STORM SEWER INLET
A NEW PIPE END SECTION
> o o NEW SWALE FLOWLINE
88677 TOP OF CURB ELEV. SPOT ELEVATION
886.27 GUTTER ELEV.
1.00% FLOW DIREC11ON
GRADING NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY.
2.THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY
COMPANIES SO AS NOT TO CAUSE DAMAGE.
3.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER
INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD
BATH" CONDITIONS.
4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS
BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE
PRESENT ON SITE. ALL VERIFICATIONS (Location, size, and depth) SHALL
BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS
AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE
UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN
BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION.
5.ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL
GRADE ELEVATIONS.
6.TRENCHES FOR ALL STORM PIPES ARE TO BE BACKFILLED COMPLETELY
WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT.
7.SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW
FINISH GRADE ELEVATIONS INDICATED.
8. CONTACT UTILITY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY
EXISTING UTILITY LINE.
STRUCTURE SCHEDULE
EXISTING LEGEND
INVERT
CASTING
STRUCTURE
MARK
INLET OUTLET
ELEV. TYPE
SPOT ELEVATION (TOP OF CURB)
wv
WATER VALVE
883.50
885.55
NEENAH
R- 3340 -B
INLET
STR -2
SPOT ELEVATION
882.95
FIRE HYDRANT
NEENAH
R -3236
CURB INLET
STR -3
882.50
x
885.30
NEENAH
R- 3340 -B
INLET
831
CONTOUR
B.
DECIDUOUS TREE
❑ -
AREA LIGHT 1
STR -4
EVERGREEN TREE
El=_0
AREA LIGHT 2
R- 3340 -B
BU`�H
STR -5
UTILITY POLE
X
FENCE
--
GUY ANCHOR
-a-
SIGN
IT;
TELEPHONE MANHOLE
O
TRAFFIC SIGNAL POLE
CTI
TELEPHONE RISER
®
TRAFFIC SIGNAL MANHOLE
❑1
TRANSFORMER
OD
DRAINAGE MANHOLE
G
UNDERGROUND GAS
(3 )
SANITARY MANHOLE
JGT
UNDERGROUND TELEPHONE
wi
CURB INLET
uGE
UNDERGROUND ELECTRIC
®
ROUND INLET (24" TYPICAL)
STM
UNDERGROUND STORM
®
SQUARE INLET (24" TYPICAL)
SAN
UNDERGROUND SANITARY
C
CLE AN OUT
-w
w- WATER LINE
•
PIPF BOLLARD
--
PROPOSED GRADING LEGEND
• NEW SANITARY STRUCTURE
•�� NEW SANITARY SEWER CLEANOUT
■ NEW STORM SEWER INLET
A NEW PIPE END SECTION
> o o NEW SWALE FLOWLINE
88677 TOP OF CURB ELEV. SPOT ELEVATION
886.27 GUTTER ELEV.
1.00% FLOW DIREC11ON
GRADING NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY.
2.THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY
COMPANIES SO AS NOT TO CAUSE DAMAGE.
3.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER
INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD
BATH" CONDITIONS.
4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS
BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE
PRESENT ON SITE. ALL VERIFICATIONS (Location, size, and depth) SHALL
BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS
AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE
UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN
BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION.
5.ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL
GRADE ELEVATIONS.
6.TRENCHES FOR ALL STORM PIPES ARE TO BE BACKFILLED COMPLETELY
WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT.
7.SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW
FINISH GRADE ELEVATIONS INDICATED.
8. CONTACT UTILITY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY
EXISTING UTILITY LINE.
STRUCTURE SCHEDULE
Jf•1
U)
INVERT
CASTING
STRUCTURE
MARK
INLET OUTLET
ELEV. TYPE
TYPE
STR -1
--
883.50
885.55
NEENAH
R- 3340 -B
INLET
STR -2
883.05
882.95
885.45
NEENAH
R -3236
CURB INLET
STR -3
882.50
882.50
885.30
NEENAH
R- 3340 -B
INLET
'w ZOI
Z
NEENAH
O
STR -4
881.95
881.95
885.40
R- 3340 -B
INLET
STR -5
881.83
881.83
885.45
--
AQUA SWIRL (AS -4)
STR -6
--
881.70
--
--
END SECTION
01
W'W
NEENAH
c �yrnrn
STR -8
881.93
881.93
884.90
R- 3340 -B
INLET
STR -9
--
881.70
--
--
END SECTION
STR -10
--
881.70
--
--
END SECTION
STR -11
881.92
--
--
--
END SECTION
STR_12
881.97
--
--
--
END SECTION
STR -13
--
881.93
--
--
END SECTION
IL
d
SAN MANHOLE
STR -14
880.5
--
884.50
W/ GRINDER PUMP
HOLEY MOLEY SAYS
"DIG SAFELY"
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1- 800 - 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IC8 -1 -26.
Q)
Jf•1
U)
6.1..
Y
U
LL
p
O
Z
W
o
�o
�v m
^w^ t! N Gj
F
v? CL x
a
Q)
Jf•1
U)
6.1..
Y
U
T L.L
m Y
Q
O7
1
W
�o
�v m
F
v? CL x
a
D
Z
a
�
m L C O N
rn 00 o
'w ZOI
Z
w
O
(6 C5
C/)
�!2
m W >
0
LLJ
z '
Cc 0
F- Inn j
Q
a a w
01
W'W
c �yrnrn
U) U) w !
jjl��
Lu I U)
sa�al�
fY : -oO
L to LO
O o,o
0); Lb
O
N N
m
Z
5W
G
U�
Z Q
�v
U LL
I- >
W 0�
Q
W �
Q
0 C
LL W
Q
20
J
LL
Q
Z
Q
CL
V
Z
0
(D
W
I-
m
SHEET NO.
IT IS AGAINST THE LAW TO EXCAVATE C3.0
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING DAYS
BEFORE COMMENCING WORK. OF 11
PP0AF' T- F' \9f n \ on _nr A o dam-- ♦...es
DWG: C3.0 SITE GRADING PLAN.dwg
PLOTTED BY: R. C. BERGER
0
o0
�o
�v m
F
v? CL x
m L C O N
rn 00 o
F-
U
m
w
(6 C5
~t90
m W >
0
Lo
Cc 0
Q
T CL
Zcnqvoo
c �yrnrn
fY : -oO
O
N D h h
m
LL
CL$z°��
Q
IL
d
�
a
DATE: 4 -1 -05
SCALE: 1" = 30`
PROJECT
NO.: 2005 -0014
SHEET NO.
IT IS AGAINST THE LAW TO EXCAVATE C3.0
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING DAYS
BEFORE COMMENCING WORK. OF 11
PP0AF' T- F' \9f n \ on _nr A o dam-- ♦...es
DWG: C3.0 SITE GRADING PLAN.dwg
PLOTTED BY: R. C. BERGER