Loading...
HomeMy WebLinkAbout05040015.7cn co PROPOSED L(! z ,. � r NORTH SITE EROSION CONTROL PLAN SCALE = 1' = 30' PROPOSED EROSION CONTROL LEGEND ■ EXISTING LEGEND U PIPE END SECTION - SF EROSION CONTROL FENCE ® INLET PROTECTION (DANDY BAG 11) SPOT ELEVATION (TOP OF CURB) x WA I -ER VALVE h F/77 71 SOIL STOCK PILE AREA � TEMPORARY SEEDING SPOT ELEVATION O FIRI_ HYDRANT x ry 831 CONTOUR a. DECIDUOUS TREE [)==O AREA LIGHT 1 O EVERGREEN TREE [� AREA LIGHT 2 W 3:Q BU`;H p UTILITY POLE O (1) r FENCE X F-- GUY ANCHOR ♦- ; SIGN IT; TELEPHONE MANHOLE O TRAFFIC SIGNAL POLE a] TELEPHONE RISER ® TRAFFIC SIGNAL MANHOLE A TRANSFORMER OO DRAINAGE MANHOLE G UNDERGROUND GAS OS SANITARY MANHOLE uGT UNDERGROUND TELEPHONE wi CURB INLET uGE UNDERGROUND ELECTRIC ® ROUND INLET (24" TYPICAL) STM UNDERGROUND STORM ® SQUARE INLET (24" TYPICAL) SAN UNDERGROUND SANITARY C CLEAN OUT -w w- WATER LINE • PIPF BOLLARD PROPOSED EROSION CONTROL LEGEND ■ STORM INLET U PIPE END SECTION - SF EROSION CONTROL FENCE ® INLET PROTECTION (DANDY BAG 11) O W o Q RIPRAP H LLJ V) EROSION CONTROL MAT F/77 71 SOIL STOCK PILE AREA � TEMPORARY SEEDING EROSION CONTROL NOTES 1. SEE EROSION CONTROL DETAILS SHEET C7.0. 2. SEE STORMWATER POLLUTION PREVENTION PLAN SHEET C8.0. 3. RULE 5 REQUIRES THAT ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 4. ALL STORMWATER POLLUTION PREVENTION MEASURES SHOULD BE INSPECTED AT LEAST WEEKLY AND AGAIN WITHIN 24 HOURS OR EVERY 1z INCH RAIN EVENT. SILT FENCE MAINTENANCE REQUIREMENTS 1.INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE OR IN ANY WAY BECOMES INEFFECTIVE REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR WHEN IT IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND REPLACE SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1.INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO EXISTING STREETS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. CONSTRUCTION SEQUENCE 1. NOTIFY IDEM AND THE HAMILTON COUNTY SOIL AND WATER CONSERVATION WITHIN 48 HOURS OF STARTING CONSTRUCTION. 2. POST THE N01 AND CONTACT INFORMATION FOR THE PERSON ONSITE RESPONSIBLE FOR STORM WATER POLLUTION PREVENTION. 3. DESIGNATE THE TRAINED INDIVIDUAL THAT WILL COMPLETE THE WEEKLY SITE EVALUATIONS. 4. CALL THE INDIANA UNDERGROUND PLANT PROTECTION SYSTEMS, INC. ( "HOLEY MOLEY ") AT 1- 800 - 382 -5544 TO CHECK THE LOCATION OF ANY EXISTING UTILITIES. THEY SHOULD BE NOTIFIED TWO WORKING DAYS BEFORE CONSTRUCTION TAKES PLACE. 5. BEFORE CONSTRUCTION, EVALUATE, MARK AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOTING ZONES TO BE PRESERVED. 6. INSTALL CONSTRUCTION ENTRANCE. 7. INSTALL PERIMETER BMP'S. 8. ONCE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, START MASS GRADING. DO NOT LEAVE LARGE AREAS UNPROTECTED FOR MORE THAN 15 DAYS. RULE 5 REQUIRES THAT ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 9. START BUILDING CONSTRUCTION. FINAL GRADE AND SEED SWALES. TEMPORARY SEED ALL DISTURBED AREAS. 10. AFTER COMPLETION OF MASS GRADING, INSTALL SANITARY AND STORM SEWERS AND AQUA - SWIRL. 11. INSTALL INLET PROTECTION AS STORM INLETS ARE COMPLETED. INSTALL RIPRAP AFTER END SECTIONS ARE INSTALLED. 12. COMPLETE PARKING LOT, ROADWAY AND CURBS. 13. COMPLETE BUILDING, LANDSCAPE AND FINAL SEEDING. 14. MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED. HOLEY MOLEY SAYS "DIG SAFELY" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 - 382 -5544 CALL TOLL FREE a J z - U a 0� 5, of co o 'N Z O W o Q 1' H LLJ V) ni � Z -U Q � a J z - U a 0� 5, of co G Y a Y ni � Z -U Q � J O U Q ry co W L c 1:1 C W >p O �� Y °gr oo U W 3:Q p o O (1) r p 0 C Z Q ♦- ; cl) 0 cf) wc Z 0 W Z O L ; i Lo �M W ui LL W a < W Q Z L1- ` v U � J Q Wwo G cL a l a 0 � Lu Lu LL cn! U) W' m 6 T T U)` W W �'. W :.Soo u i Lf) u, ': Lo o'oso W 2 CUB ti' L6 L6 ,r-- ir` O PER INDIANA STATE LAW IC8 -1 -26. SHEET NO. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND C6.0 LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMF_NCING WORK. OF 11 PR0.PCT-F\2nnF \onns_nme o....e..., e...m++ _ ii. A_. vex r"., \cunucraiur \ne eunur_c DWG: C6.0 SITI: EROSION CONTROL PLAN.dwg PLOTTED BY: R. C. BERGER z - _ W z G Ury ni � Z -U Q � J O UW ) ry W L c 1:1 C z >p O �� Y °gr oo U W 3:Q z O o O (1) r 0 C U) Jor- cl) 0 O � W Lo �M W �O W J Ct Q m CL :°_ L1- ` v U � J Q Zcn=ovOD G PER INDIANA STATE LAW IC8 -1 -26. SHEET NO. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND C6.0 LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMF_NCING WORK. OF 11 PR0.PCT-F\2nnF \onns_nme o....e..., e...m++ _ ii. A_. vex r"., \cunucraiur \ne eunur_c DWG: C6.0 SITI: EROSION CONTROL PLAN.dwg PLOTTED BY: R. C. BERGER °off 0 2 (1) x W � � a:° �rn L c 1:1 C U Y °gr oo W o O (1) r m o cl) 0 =C7o Lo �M �� x J Ct Q m CL :°_ Zcn=ovOD 0 � m 6 T T W :.Soo W 2 CUB O W o 0 m IL n ooZ�M p p I w W- a W DATE: 4 -1 -05 SCALE: 1" = 30' PROJECT NO.: 2005 -0014 PER INDIANA STATE LAW IC8 -1 -26. SHEET NO. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND C6.0 LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMF_NCING WORK. OF 11 PR0.PCT-F\2nnF \onns_nme o....e..., e...m++ _ ii. A_. vex r"., \cunucraiur \ne eunur_c DWG: C6.0 SITI: EROSION CONTROL PLAN.dwg PLOTTED BY: R. C. BERGER