HomeMy WebLinkAbout05050037-42.7x L KI JI HI G F E C C B A 2 3 ASSESSMENT OF CONSTRUCTION PLAN ELEMENTS (Section A) Al INDEX SHOWING LOCATIONS OF REQUIRED PLAN ELEMENTS SEE SHEET C0.0 1 A2 11 "X17" PLAT OF BUILDING LOT NUMBERS/BOUNDARIES AND ROADS INCLUDED WITH SUBMITTAL A3 NATURE AND PURPOSE OF PROJECT COMMERCIAL OFFICE /RETAIL A4 PROJECT SITE VICINITY MAP SEE SHEET C0.0 A5 LEGAL DESCRIPTION OF PROJECT SITE LATTITUDE /LONGITUDE(WGS84 /NAD 83): 39.9532012' N 86.158717' W A6 LOTS AND PROPOSED SITE IMPROVEMENTS SEE SITE PLAN SHEET C2.0 A7 HYDROLOGIC UNIT CODE (14 DIGIT) HYDROLOGIC UNIT CODE: 05120201090040 & 05120201090060 A8 STATE OR FEDERAL WATER QUALITY PERMITS CONSTRUCTION IN A FLOODWAY (IDNR): N/A 401 WATER QUALITY CERTIFICATION (IDEM): N/A SECTION 404 PERMIT (USACOE): N/A A9 POINTS OF STORMWATER DISCHARGE FROM SITE STORM WATER WILL DRAIN TO AN EXISTING DETENTION POND LOCATED NORTH OF THE SITE AND PREVIOUSLY MASTER PLANNED FOR THE AREA. A10 ADJACENT WETLANDS, LAKES AND WATER COURSES NONE KNOWN All RECEIVING WATERS WHITE RIVER Al2 POTENTIAL DISCHARGES TO GROUND WATER NONE KNOWN A13 FLOODPLAINS, FLOODWAYS AND FLOODWAY FRINGES NOT LOCATED NEAR A FLOODPLAIN AREA. A14 PRE - CONSTRUCTION /POST - CONSTRUCTION PEAK DISCHARGE 25 -YEAR, PRE - DEVELOPED PEAK DISCHARGE 6.30 CFS 25 -YEAR, POST- DEVELOPED PEAK DISCHARGE = 6.47 CFS A15 ADJACENT LAND USE NORTH - COMMERCIAL OFFICE SOUTH - COMMERCIAL OFFICE EAST - COMMERCIAL OFFICE WEST - COMMERCIAL OFFICE A16 CONSTRUCTION LIMITS SEE EROSION CONTROL PLAN SHEET C4.0 A17 EXISTING VEGETATIVE COVER THE SITE IS CURRENTLY A DEVELOPED COMMERCIAL BUILDING. A18 SOILS MAP AND SOIL DESCRIPTIONS EXISTING SOIL TYPES & DESCRIPTION CrA: Crosby Silt Loam Br: Brookston Silty Clay Loam 4 A19 PROPOSED STORMWATER SYSTEMS SEE GRADING PLAN SHEET C3.0 FOR MEASURES, LOCATIONS AND DETAILS A20 OFF -SITE CONSTRUCTION ACTIVITIES THE STORMWATER DRAINAGE WILL DRAIN TO AN EXISTING STORM WATER DENENTION POND PREVIOUSLY MASTER PLANNED FOR THE SITE. A21 PROPOSED SOIL STOCKPILES SEE EROSION CONTROL PLAN SHEET C4.0 FOR LOCATION(S) A22 SITE TOPOGRAPHY SEE GRADING PLAN SHEET C1.0 A23 FINAL SITE TOPOGRAPHY SEE GRADING PLAN SHEET C3.0 EROSION CONTROL PLAN - CONSTRUCTION COMPONENT (Section B B1 POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THE MATERIALS AND SUBSTANCES LISTED BELOW ARE EXPECTED ON -SITE • PAINTS, THINNERS AND SOLVENTS ENSURE THAT CONTAINERS HAVE LIDS SO THAT THEY CAN BE COVERED BEFORE PERIODS OF RAIN, AND KEEP CONTAINERS IN DRY, COVERED AREA WHENEVER POSSIBLE. • BATTERIES STORE ONSITE IN DRY COVERED AREA AND DISPOSE OF PER MANUFACTURER'S RECOMMENDATIONS IN CONJUNCTION WITH STATE, LOCAL AND FEDERAL REGULATIONS • AEROSOL SPRAY PRODUCTS STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • ADHESIVES STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • BIOLOGICAL SOLID WASTE TRAP IN CONTAINERS, CLEANED REGULARLY, AND DISPOSED OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. SCHEDULE WASTE COLLECTION MORE FREQUENTLY TO PREVENT CONTAINERS FROM OVERFILLING. UNTREATED, RAW SEWAGE OR SEPTAGE SHOULD NEVER BE DISCHARGED OR BURIED ONSITE. 2 3 4 �i 7 B1 POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (continued from previous column) • REGULATED PCB MATERIAL STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • MOTOR OIL STORE PETROLEUM PRODUCTS FOR VEHICLES IN COVERED AREAS WITH LEAK -PROOF HEAVY DUTY PLASTIC LINER ON THE GROUND WITH DIKES IN PLACE TO CONTAIN AND SPILLS. IMMEDIATELY CONTAIN AND CLEAN UP ANY SPILLS WITH ABSORBENT MATERIALS. MOTOR OIL SHOULD BE CHANGED IN A DESIGNATED AREA WITH A METAL CATCH PAN OF 4'X4'X8" MIN. AND PROPERLY DISPOSED OF. • ANTIFREEZE STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • FUEL STORE FUEL FOR VEHICLES IN COVERED AREAS WITH LEAK -PROOF HEAVY DUTY PLASTIC ON THE GROUND WITH DIKES IN PLACE TO CONTAIN AND SPILLS. IMMEDIATELY CONTAIN AND CLEAN UP ANY SPILLS WITH ABSORBENT MATERIALS. • BRAKE FLUIDS STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • HYDRAULIC FLUIDS STORE IN APPROVED CONTAINERS, AND DISPOSE OF ACCORDING TO LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS OR OTHER PUBLIC AGENCY. • RUBBLE - ASPHALT /CONCRETE DISPOSE OF IN PROPER CONTAINERS AND RECYCLE PER LOCAL, COUNTY, STATE AND FEDERAL REGULATIONS. • LAND CLEARING DEBRIS RECYCLE APPROPRIATELY IN APPROPRIATELY MARKED CONTAINERS AND SCHEDULE REGULAR PICKUP BEFORE OVERFILLING OCCURS. • WASTE ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A SECURELY LIDDED APPROVED CONTAINER. ALL TRASH AND NON- RECYCLABLE MATERIALS SHALL BE DEPOSITED IN THE DUMPSTER DAILY. THE DUMPSTER SHOULD EMPTIED PERIODICALLY AND NOT ALLOWED TO OVERFILL. DO NOT THROW TRASH ON GROUND OR BURY MATERIALS ON SITE. • UNUSED BUILDING MATERIALS ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A SECURELY LIDDED APPROVED CONTAINER. ALL RECYCLABLE MATERIALS SHALL BE DEPOSITED IN THE DUMPSTER DAILY. THE DUMPSTER SHOULD EMPTIED PERIODICALLY AND NOT ALLOWED TO OVERFILL. DO NOT BURY MATERIALS ON SITE. • CONCRETE TRUCK WASHOUT CONCRETE WASHOUT AREAS SHOULD A BERMED, SELF CONTAINED AREA APPROXIMATELY 10'X10'X3' IN PLACE TO CONTAIN THE CONCRETE, BUT ALLOW THE WATER TO INFILTRATE THE GROUND. DRIED MATERIAL SHALL BE REMOVED AND DISPOSED OF PROPERLY. THE CONCRETE WASHOUT AREA SHALL BE LOCATED IN AN AREA WHERE FUTURE PAVEMENT WILL BE INSTALLED, BUT AWAY FROM STORMWATER STRUCTURES AND WATER BODIES. . FERTILIZERS /PESTICIDES /DETERGENTS FERTILIZERS AND PESTICIDES WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT THE EXPOSURE TIME TO STORM WATER. STORAGE WILL BE IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAG OF FERTILIZER WILL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS. THE ORIGINAL LABEL AND SAFETY INFORMATION WILL BE RETAINED. STORAGE AREAS SHALL BE BERMED TO CONTAIN SPILL FROM RUNNING INTO GROUNDWATER OR STORM SYSTEM. B2 SEQUENCE OF EROSION CONTROL MEASURES IMPLEMENTATION SEE ALSO CHART DETAIL 07 SHEET C4.1 INITIAL SETUP UPON COMPLETION OF THE INITIAL SITE INSPECTION AND BEFORE ANY VEGETATION IS REMOVED FROM THE SITE, THE EROSION CONTROL PLAN SHALL BE IMPLEMENTED. THE PLAN SHALL BE CONTINUALLY MAINTENANCE AND UPDATED AS NEEDED. ALL EROSION CONTROL PRACTICES WILL BE INSTALLED UNDER THE GUIDANCE OF A PROFESSIONAL EXPERIENCED IN EROSION CONTROL. ALL OTHER NON- ENGINEERED EROSION CONTROL MEASURES INVOLVING VEGETATION WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS AND CRITERIA AS SET FORTH IN THIS EROSION CONTROL PLAN. EROSION CONTROL PRACTICES WILL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE PROJECT SITE AND MAINTAINED IN WORKING ORDER BY THE CONTRACTOR. • FLAG OR DENOTE ALL CONSTRUCTION LIMITS. • CALL FOR AN UNDERGROUND LOCATE TO VERIFY LOCATION OF EXISTING UTILITIES. • NOTIFY SWCD AGENT AND IDEM 48 HOURS IN ADVANCE OF BEGINNING WORK. • RETAIN EXISTING VEGETATION WHEREVER POSSIBLE. • IDENTIFY AND PROTECT ALL EXISTING VEGETATION DESIGNATED TO REMAIN. • INSTALL EROSION CONTROL MEASURES AND SILT FENCE. • INSTALL CONSTRUCTION ENTRANCE AND PROVIDE TEMPORARY SEEDING. • INSTALL SWALE AND UNDERDRAINS. • INSTALL SEDIMENT TRAPS. • INSTALL TEMPORARY SEEDING IN ALL PERMISSIBLE AREAS. • COMPLETE ROUGH GRADING AND SEED APPROPRIATE AREAS. • COORINATE BUILDING CONSTRUCTION WITH OTHER DEVELOPMENT ACTIVITIES SO THAT ALL WORK CAN TAKE PLACE IN AN ORDERLY MANNER AND ON SCHEDULE. • AFTER CONSTRUCTION AND FINAL GRADING, LANDSCAPE AND PERMANENTLY STABILIZE ALL DISTURBED SITES, INCLUDING BORROW AND DISPOSAL AREAS. ALSO REMOVE TEMPORARY RUNOFF CONTROL STRUCTURES AND ANY UNSTABLE SEDIMENT AROUND THEM, AND VEGETATE THOSE AREAS. • POST A NOTICE OF THE PROJECT IN A PUBLICLY ACCESSIBLE LOCATION NEAR THE PROJECT FIELD OFFICE. THE NOTICE WILL INCLUDE A COPY OF THE COMPLETED N01 LETTER, THE NPDES PERMIT NUMBER, AND NAME, COMPANY NAME, AND TELEPHONE NUMBER OF PROJECT CONTACT PERSON. • INFORM ALL GENERAL CONTRACTORS, CONSTRUCTION MANAGEMENT FIRMS, GRADING OR EXCAVATING CONTRACTORS, AND ALL OTHER CONTRACTORS WITH PRIMARY OVERSIGHT ON INDIVIDUAL BUILDING LOTS OF THE TERMS AND CONDITIONS OF THE STORM WATER RULE 5, AND THE CONDITIONS AND STANDARDS OF THIS EROSION CONTROL PLAN, SCHEDULE FOR IMPLEMENTATION, AND THE CONSTRUCTION SITE EROSION CONTROL PLAN REPORT. CONSTRUCTION • BEGIN TOPSOIL REMOVAL AND BUILDING DEMOLITION. • ALL STOCKPILED TOPSOIL TO BE SALVAGED SHALL BE PERIMETER PROTECTED. RUNOFF FROM STOCKPILES WILL BE FILTERED THROUGH SILT FENCES AND /OR STRAW BALES AND THE SEDIMENT BASIN. STOCKPILES SHALL NOT INTERFERE WITH NATURAL DRAINAGE. THE STOCKPILES SHALL BE REDISTRIBUTED OVER THE SITE AND FINAL GRADED IMMEDIATELY PRIOR TO SEEDING. • INSTALL ADDITIONAL SILT FENCES OR OTHER SUCH MECHANISM AS REQUIRED. • IMPLEMENT SELF - MONITORING PROGRAM. • BEGIN SEEDING AND MULCHING PROGRAM. • ALL AREAS WHICH CAN BE REGRADED TO A FINAL STATE SHALL BE REVEGETATED WITH AN APPROVED SEED MIXTURE AND FERTILIZED AT THE RATES INDICATED AS PER THE SEED CHART (DETAIL 05, SHEET C4.1). B3 CONSTRUCTION ENTRANCE LOCATION SEE EROSION CONTROL PLAN SHEET C4.0 FOR LOCATION; SEE DETAIL SHEET C4.2 B4 SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS SILT FENCE, TEMPORARY AND PERMANENT SEEDING; SEE EROSION CONTROL PLAN SHEET C4.0 FOR LOCATIONS; SEE DETAILS ON SHEET C4.2 5 7 0 d B5 CONTROL MEASURES FOR CONCENTRATED FLOW AREAS SEE EROSION CONTROL PLAN SHEET C4.0 AND DETAILS ON C4.2 B6 INLET PROTECTION MEASURE LOCATIONS AND SPECIFICATIONS INLETS WILL BE PROTECTED WITH SAND BAG INLET PROTECTION. B7 RUNOFF CONTROL MEASURES SILT FENCE, SEEDING, AND SAND BAG INLET CONTROLS ARE PROPOSED. B8 STORM WATER OUTLET PROTECTION SPECIFICATIONS THE PROPOSED SITE WILL TIE INTO THE EXISTING STORM SYSTEM. INLET PROTECTIONS ARE PROPOSED. B9 GRADE STABILIZATION STRUCTURES NONE NECESSARY B10 CONSTRUCTION DETAILS FOR STORMWATER MEASURES SEE EROSION CONTROL PLAN SHEET C4.0 FOR LOCATIONS AND DETAIL SHEET C4.2 B11 TEMPORARY SURFACE STABILIZATION METHODS 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON -SITE. 10. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. c) TEMPORARY SEEDING SHALL UTILIZE SEED SPECIES, APPLICATION RATES, AND DATES SET FORTH IN THE CHARTS DETAIL 05 SHEET C4.1. B12 PERMANENT SURFACE STABILIZATION METHODS 1. AT THE PROPER TIME, WITH APPROVAL FROM THE OWNER, AND ONLY AFTER NOTIFYING THE SWCO AGENT, THE CONTRACTOR SHALL DISMANTLE THE REMAINING EROSION CONTROL ELEMENTS ONLY AS REQUIRED TO FINISH ALL GRADING. CONTRACTOR SHALL NOTIFY THE SWCD IN ADVANCE AND ARRANGE FOR THE LANDSCAPING CONTRACTOR TO FOLLOW UP IMMEDIATELY WITH REVEGETATION OF THE REMAINING AREAS. 2. CONTRACTOR SHALL REMOVE ANY UNSUITABLE MATERIAL FROM THE SITE LEFT FROM THE EROSION CONTROL MEASURES. 3. ANY BARE DISTRUBED AREAS WILL BE GRADED, SEEDED AND MULCHED OR OTHERWISE REVEGETATED OR STABILIZED, AS PER THE EROSION CONTRL PLAN. PERMANENT SEEDING WILL BE ACCORDING TO THE SEED SPECIES, RATES AND DATES SHOWN IN THE CHARTS OF DETAIL 05 SHEET C4.1. 4. FINAL STABILIZATION WILL BE CONSIDERED ACHIEVED WHEN PERENNIAL VEGETATIVE COVER HAS A DENSITY OF SEVENTY PERCENT VQ0..) ON ALL UNPAVED AREAS OR AN EQUIVALENT PERMANENT STABILIZATION MEASURE HASS BEEN UTILIZED. IMPLEMENTATION AND MAINTENANCE WILL BE ACCORDING TO SECTIONS C2 AND C5 BELOW. B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN 1. THE PROPER MANAGEMENT AND DISPOSAL OF WASTES SHOULD BE PRACTICED ON SITE AT ALL TIMES TO REDUCE POLLUTION STORM WATER RUNOFF. HAZARDOUS WASTE SHOULD ALWAYS BE DISPOSED OF THROUGHA DESIGNATED HAZARDOUS WASTE MANAGEMENT OR RECYCLING FACILITY. HAZARDOUS WASTE SHOULD NOT BE DISPOSED OF WITH ORDINARY GARBAGE, OR POURED INTO THE SANITARY SEWER SYSTEM OR ONTO THE GROUND. 2. DESIGNATE A WASTE COLLECTION AREA ON -SITE THAT DOES NOT RECEIVE A SUBSTANTIAL AMOUNT OF RUNOFF FROM UPLAND AREAS AND DOES NOT DRAIN DIRECTLY INTO A WATER BODY. 3. KEEP PRODUCTS IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT RE- SEALABLE, THEN ORIGINAL LABEL AND MATERIAL SAFETY DATA WILL BE RETAINED. IF A PRODUCT DOES NOT HAVE ITS ORIGINAL LABEL, LABEL IT YOURSELF IF YOU ARE SURE OF CONTENTS. MAKE SURE PRODUCTS ARE PROPERLY SEALED TO PREVENT LEAKS AND SPILLS AND STORED IN A WEATHER PROOF SELF CONTAINED AREA AWAY FROM HEAT, SPARKS AND FLAMES. 4. A PROGRAM FOR RECYCLING OR DISPOSAL OF MATERIALS ASSOCIATED WITH OR FROM THE PROJECT SITE SHALL BE ESTABLISHED. ALL RECYCLING CONTAINERS WILL BE CLEARLY LABELED. 5. ALL CONSTRUCTION ACTIVITIES TO BE MONITORED AND MAINTAINED BY THE CONTRACTOR. AS EACH NEW SUB - CONTRACTOR COMES ON -SITE, THE CONTRACTOR WILL CONDUCT AND DOCUMENT A MEETING TO ENSURE AWARENESS OF THE POLLUTANT PREVENTION PROGRAM. GUIDELINES FOR PROPER HANDLING, STORAGE AND DISPOSAL OF CONSTRUCTION SITE WASTES SHOULD BE POSTED IN STORAGE AND USE AREAS AND WORKERS SHOULD BE TRAINED IN THESE PRACTICES TO ENSURE EVERYONE IS KNOWLEDGEABLE ENOUGH TO PARTICIPATE. 6. IN AN EMERGENCY, THE CONTRACTOR WILL CALL 911. IN THE EVENT OF A SPILL THAT POSES NO IMMEDIATE THREAT, THE CONTRACTOR WILL CONTACT THE LOCAL FIRE DEPARTMENT AND/OR 2337745 EMERGENCY 24 RESPONDER OF�j' D IDEM EMERGENCY 7. CLEAN UP SPILLS IMMEDIATELY. FOR HAZARDOUS MATERIALS FOLLOW CLEANUP INSTRUCTIONS ON THE PACKAGE. USE ABSORBENT MATERIAL SUCH AS SAWDUST OR KITTY UTTER TO CONTAIN THE SPILL. PROPER SAFETY MATERIALS SHOULD BE STORED ON SITE IN CASE OF ACCIDENT OR SPILL WHICH SHOULD INCLUDE BUT NOT LIMITED TO BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, AND PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY FOR THAT PURPOSE. SPILL AREAS SHOULD BE WELL VENTILATED. 8. DURING THE DEMOLITION PHASE OF CONSTRUCTION, PROVIDE EXTRA CONTAINERS AND SCHEDULE MORE FREQUENT PICKUPS FOR RECYCLABLES AND GARBAGE. COLLECT, REMOVE, AND DISPOSE OR ALL CONSTRUCTION SITE WASTES AT AUTHORIZED DISPOSAL AREAS. CONTACT LOCAL ENVIRONMENTAL AGENCY TO IDENTIFY DISPOSAL SITES OR AUTHORIZED CONTRACTORS. 9- CONSTRUCTION VEHICLES SHOULD BE INSPECTED FOR LEAKS DAILY AND REPAIRED IMMEDIATELY IN A SELF CONTAINED AREA DESIGNATED FOR VEHICLE MAINTENANCE AND REPAIR. THE VEHICLE MAINTENANCE AREA SHOULD BE CONDUCTED ON AN AREA THAT IS TO BECOME FUTURE PAVEMENT. THIS AREA WILL BE DESIGNED TO MINIMIZE CONTACT BETWEEN EQUIPMENT ACTIVITIES AND RAINFALL OR RUNOFF. SPILLS MUST BE CLEANED UP AND MATERIALS DISPOSED OF IMMEDIATELY. 10.CONTAINERS OR EQUIPMENT THAT MAY MALFUNCTION AND CAUSE LEAKS OR SPILLS SHOULD BE IDENTIFIED THROUGH REGULAR INSPECTION AND STORAGE OF USE AREAS. EQUIPMENT AND CONTAINERS SHOULD BE INSPECTED REGULARLY FOR LEAKS, CORROSION, SUPPORT OR FOUNDATION FAILURE, OR ANY OTHER SIGNS OF DETERIORATION AND SHOULD BE TESTED FOR SOUNDNESS. ANY FOUND TO BE DEFECTIVE SHOULD BE REPAIRED OR REPLACED IMMEDIATELY. www.civil- designs.com IM 12 13 14 314 MONITORING AND MAINTENANCE GUIDELINES A TRAINED INDIVIDUAL SHALL PERFORM A WRITTEN EVALUATION OF THE PROJECT SITE: • BY THE END OF THE NEXT BUSINESS DAY FOLLOWING EACH 1/2 STORM EVENT; AND • A MINIMUM OF ONE (1) TIME PER WEEK. THE EVALUATION WILL: • ADDRESS THE MAINTENANCE OF EXISTING EROSION CONTROL MEASURES TO ENSURE PROPER FUNCTIONING; AND • IDENTIFY ANY ADDITIONAL MEASURES NECESSARY TO MEET THE REQUIREMENTS OF THE EROSION CONTROL PLAN. WRITTEN EVALUATION REPORTS INCLUDE: • THE NAME OF THE INDIVIDUAL PERFORMING THE EVALUATION; • THE DATE OF THE EVALUATION; • PROBLEMS IDENTIFIED AT THE PROJECT SITE; AND • DETAILS OR CORRECTIVE ACTIONS RECOMMENDED AND COMPLETED. ALL WRITTEN EVALUATION REPORTS FOR THE PROJECT SITE WILL BE MAINTAINED BY THE CONSTRUCTION SUPERINTENDENT THROUGHOUT THE TERM OF THE PROJECT CONSTRUCTION AND MADE AVAILABLE TO THE SWCD OR OTHER INSPECTING AUTHORITY WITHIN 48 HOURS OF A REQUEST. MAINTENANCE OF SPECIFIC EROSION CONTROL MEASURES SHALL BE ACCORDING TO THE FOLLOWING: SEEDING OF DISTURBED AREAS 1. DISTURBED AREAS WILL BE SEEDED AND MULCHED FOR TEMPORARY OR PERMANENT STABILIZATION AS PHASES OF THE PROJECT CONSTRUCTION ARE COMPLETED. 2. UN- VEGETATED AREAS SCHEDULED OR LIKELY TO BE LEFT INACTIVE FOR FIFTEEN (15) DAYS OR MORE WILL BE TEMPORARILY OR PERMANENTLY STABILIZED WITH MEASURES APPROPRIATE FOR THE SEASON TO MINIMIZE EROSION POTENTIAL. 3. SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. SILT FENCE MAINTENANCE REQUIREMENTS: 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. STORM WATER BASIN MAINTENANCE REQUIREMENTS: 1. INSPECT THE STORM WATER BASIN AFTER EACH STORM EVENT. IMMEDIATELY REPAIR ANY EROSION AND PIPING HOLES. 2. THE NECESSITY FOR SEDIMENT REMOVAL WILL BE DETERMINED AFTER EACH EVENT. 3. REPLACE /REPAIR OUTLET RIPRAP AS REQUIRED AFTER EACH EVENT. 4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS: 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY AND MAINTAIN AS PER CHART UNDER SECTION C2 SHEET 4.3 FOR DRY SWALE. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS: 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. 15 0 1315 EROISION AND SEDIMENT CONTROL SPECIFICATIONS FOR INDIVIDUAL BUILDING LOTS THIS PROJECT ONLY CONTAINS ONE LOT EROSION CONTROL PLAN POST - CONSTRUCTION COMPONENT (Section C Cl POTENTIAL POLLUTANT SOURCES FROM PROPOSED LAND USE THE GREATEST AMOUNT OF POST CONSTRUCTION POLLUTANTS EXPECTED FROM THIS PROJECT WILL COME FROM THE VEHICLES THAT UTILIZE THE SITE. POTENTIAL POLLUTANTS FROM VEHICLES INCLUDE: GREASE, OIL, GASOLINE, DIESEL, ANTIFREEZE, BRAKE FLUID, METALS, RUBBER FRAGMENTS AND OTHER HYDROCARBONS. ALSO SAND AND GRAVEL FROM ROADWAY SURFACES AND ROAD WEATHER TREATMENTS ARE ASSUMED. BACTERIA AND OTHER BIOLOGICAL AGENTS FROM DUMPSTER AREAS AND LITTERING ARE ALSO CONSIDERED POTENTIAL POLLUTANTS. FINAL LANDSCAPING AND SEEDING WILL BE DONE AFTER FINAL GRADING. WEEKLY PARKING LOT CLEANING AND DAILY LITTER CLEAN UP WILL BE PERFORMED. FERTILIZING WILL BE MINIMAL SINCE THERE IS VERY LITTLE TURF ON THE SITE. THE EXTENSIVE LANDSCAPE PLANTINGS WERE CHOSEN FOR THE LOW DEPENDENCY UPON FERTILIZERS AND PESTICIDES. THEY ALSO REQUIRE VERY LITTLE IRRIGATION SO TO MINIMIZE THE FERTILIZER AND PESTICIDE RUNOFF FROM THE SITE. C2 SEQUENCE OF EROSION CONTROL MEASURES IMPLEMENTATION SEE 'EROSION CONTROL SCHEDULE' CHART BELOW. C3 PROPOSED STORMWATER QUALITY MEASURES THE PROPOSED SITE IS PART OF A PREVIOUSLY APPROVED STORM WATER DETENTION SYSTEM FOR FIDELITY PLAZA. C4 CONSTRUCTION DETAILS AND SPECIFICATIONS SEE DETAIL SHEET C4.1 C5 MAINTENANCE GUIDELINES FOR STORMWATER MEASURES SEE CHART BELOW. ESTIMATED START: AUGUST 1, 2005 ESTIMATED COMPLETION OF SITE DEVELOPMENT: AUGUST 1, 2006 CONTACT PERSON: AARON HURT CIVIL DESIGNS, LLP 2415 DIRECTORS ROW, SUITE E INDIANAPOLIS, INDIANA 46241 (317) 244 -1968 THE FOLLOWING ARE THE CONTACTS IN THE EVENT THAT A SPILL OCCURS. CARMEL FIRE DEPARTMENT INDIANA DEPARTMENT OF ENVIRONMENTAL 2 CIVIC SQUARE MANAGEMENT CARMEL, INDIANA 46032 100 SENATE AVENUE (317) 571 -2600 INDIANAPOLIS, IN 46207 -7060 (317) 232 -8706 EROSION CONTROL SCHEDULE POST CONSTRUCTION MEASURE EROSION CONTROL SCHEDULE SCHEDULE EROSION CONTROL MEASURE DETENTION /RETENTION BASINS MAINTENANCE REVISION RECORD O INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED ORGINAL OPEN WATER SURFACE AREA OCCURS. ANNUAL OR 0 PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEEKLY, AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED W AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED STABILIZATION OF ERODED SIDE SLOPES AND BOTTOM ANNUAL OR DESIGN PHASE CHANNELS, AFTER FINISH GRADING EROSION CONTROL MATTING WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED PER MANUFACTURER'S DURING STORM RECOMMENDATION SEWER INSTALLATION PERMANENT SEEDING WATERING ONCE ESTABLISHED & THROUGH DROUGHT TIMES REMOVAL OF TREE PROTECTION N/A • MOWING AND LITTER DEBRIS REMOVAL • STABILIZATION OF ERODED SLOPES AFTER PERMANENT SEEDING REMOVAL OF STRAW BALES N/A AS NEEDED • DETHATCHING AND REMOVAL OF THATCHING AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION N/A • SEEDING /SODDING TO RESTORE GROUND COVER 5 -YEAR CYCLE AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE N/A EROSION CONTROL MATS • PER MANUFACTURER'S RECOMMENDATIONS PER MANUFACTURER'S RECOMMENDATION AFTER FINAL GRADING AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED EROSION CONTROL SCHEDULE POST CONSTRUCTION MEASURE MAINTENANCE /MONITORING ACTIVITY SCHEDULE INSTALLATION. SEQUENCE DETENTION /RETENTION BASINS CLEANING AND REMOVAL OF DEBRIS REVISION RECORD O • HARVEST VEGETATION WHEN 509E REDUCTION IN THE O DURING ROUGH GRADING ORGINAL OPEN WATER SURFACE AREA OCCURS. ANNUAL OR 0 • REPAIR OF EMBANKMENT AND SIDE SLOPES AS NEEDED Q - `���Ittttrii��i ON C . y iii ? ..... ••�\STJ,q FO ••• i ► No 0. PE10300058 •• STATE OF go N P eel 9 l9 O 1111!•♦ Ate, C. Hit. • REPAIR OF CONTROL STRUCTURE z0< DWN BY: JRD • REMOVAL OF ACCUMULATED SEDIMENT FROM SCALE: NTS DATE: 3/18/2005 �. /�Q_ FOREBAYS OR SEDIMENT STORAGE AREAS WHEN 60% 5 -YEAR CYCLE z OF THE ORIGINAL VOLUME HAS BEEN LOST Z M 0 • REMOVAL OF ACCUMULATED SEDIMENT FROM Q LLJ U W MAIN PART OF POND ONCE 50X OF ORIGINAL 20 -YEAR CYCLE z VOLUME HAS BEEN LOST IL.VU 0 DRY POND SEE ABOVE V DURING ROUGH GRADING WETLANDS SEE ABOVE DURING ROUGH GRADING r W MOWING AND LJTTER DEBRIS REMOVAL DRY SWALES, GRASSED LINED ,GRA SE STABILIZATION OF ERODED SIDE SLOPES AND BOTTOM ANNUAL OR DESIGN PHASE CHANNELS, • NUTRIENT AND PESTICIDE USE MANAGEMENT AS NEEDED DURING ROUGH GRADING • DETHATCHING SWALE BOTTOM AND REMOVAL OF THATCHING • DISCING OR AERATION OF SWALE BOTTOM • SCRAPING SWALE BOTTOM AND REMOVAL OF SEDIMENT TO RESTORE ORIGINAL CROSS SECTION AND INFILTRATION RATE • SEEDING /SODDING TO RESTORE GROUND COVER 5 -YEAR CYCLE (USE PROPER EROSION AND SEDIMENT CONTROL) HYDRAULIC STRUCTURES PER MANUFACTURER'S RECOMMENDATIONS PER MANUFACTURER'S DURING STORM RECOMMENDATION SEWER INSTALLATION PERMANENT SEEDING WATERING ONCE ESTABLISHED & THROUGH DROUGHT TIMES AFTER FINAL GRADING • MOWING AND LITTER DEBRIS REMOVAL • STABILIZATION OF ERODED SLOPES ANNUAL OR • NUTRIENT AND PESTICIDE USE MANAGEMENT AS NEEDED • DETHATCHING AND REMOVAL OF THATCHING • DISCING OR AERATION • SEEDING /SODDING TO RESTORE GROUND COVER 5 -YEAR CYCLE (USE PROPER EROSION AND SEDIMENT CONTROL) EROSION CONTROL MATS • PER MANUFACTURER'S RECOMMENDATIONS PER MANUFACTURER'S RECOMMENDATION AFTER FINAL GRADING 12 3 4 5 ■ Civil Designs 2415 Directors Row Ste.E Indianapolis, In 46241 317 - 244 -1968 FAX- 244 -1969 0 ( IN FEET ) 1 inch = ft. (ASSUMED NORTH) U11) /"1 j d REVISION RECORD O O O W 0 0 Q - `���Ittttrii��i ON C . y iii ? ..... ••�\STJ,q FO ••• i ► No 0. PE10300058 •• STATE OF go N P eel 9 l9 O 1111!•♦ Ate, C. Hit. DATE: 3 118 1 2005 z0< DWN BY: JRD CHKD. BY: ACH SCALE: NTS DATE: 3/18/2005 Civil Designs 2415 Directors Row Ste.E Indianapolis, In 46241 317 - 244 -1968 FAX- 244 -1969 U11) /"1 j d W L1.! pC�N W WzO 0 Q - j z0< O (W °C z �. /�Q_ z Z M 0 Q LLJ U W z IL.VU 0 . V 0 r W PROJECT NUMBER 05 -110 DESIGN PHASE CONSTRUCTION PLAN NUMBER C4ml SHEET OF