HomeMy WebLinkAbout05050047.3THIS SHEET TO BE USED
FOR EROSION CONTROL ONLY.
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
KENNETH R. BRASSEUR
PLATINUM PROPERTIES L.L.C.
Phone: (317)- 818 - 2900
EXISTING
EONGRIDGE ESTATES
—
NOTE:
ANY ADDITIONAL EROSION CONTROL MEASURES MAY
BE REQUIRED IN THE FIELD BY THE INSPECTOR.
NOTE:
IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS,
THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN
THE FORM OF TEMPORARY SEEDING, MULCH, OR SPRAY
ON PALIMAR.
u►u►,
STOEPpF "11111
No.
19358
? o' STATE OF
�s••.........•
s�
SCALE: 1 "= 40'
M
Seedbed Preparation for Permanent Seeding
1. Test soil to determine pH and nutrient levels.
(Contact you county SWCD or Cooperative Extension
office for assistance and soils information, including
available testing services.)
2. If soil pH is unsuitable for the species to be
seeded, apply lime according to test recommendations.
3. Fertilize as recommended by the soil test. If testing
WVJ
was not done, consider applying 400 -600 lbs. /acre of
12 -12 -12 analysis, or equivalent, fertilizer.
0
4. Till the soil to obtain a uniform seedbed, working
I—�
the fertilizer and lime into the soil 2 -4 in. deep with
V)
a disk or rake operated across the slope.
(/?
0
W
U
U
U)
Qz
w0
Z U
Z
W
O�
Denotes Construction Limits
V)
O4d
• tl)
Z
w
Z Z
d
U
The following is a list in sequence of construction
p O
activities to control soil erosion:
Z
2
W r n
j X
1. The contractor shall schedule a Pre - construction
p
meeting with the Hamilton County Soil and Water
N W
Conservation District prior to any construction on
tL
the site being started. Contractor (ind /or
J
Developer to notify IDEM and H.C.S.W.F.D 48 hours
Qprior
to construction beginning.
N
2. Maintenance and Refueling area constructed
Z 0
3. Concrete washout area constructed
J
4. Posting information area shall be constructed. All
items, as outlined in the in the 0 &M manual for
(To be installed immediately after storm inlet installation.)
Post Constuction water quality measures shall be
O
placed in this area.
5. Perimeter Silt fencing to be installed,
Denotes permanent seeding &mulch areas
Seeding rate: 130# /acre or 3# /1000 S.F.
6. Grade the site (sides of swales, mounds and
ponds to be seeded and mulched irnmediately
upon completion. If the site remain-3 inactive
for a period of 15 days, stabilization is required
to take place in the form of temporary
O
seeding, mulch or spray on polimar. For
temporary seeding, the contractor shall utilize a
fast growing seed of either oats, annual
ryegrass, wheat or rye depending on time of
year. Disturbed areas should be kept to a
Denotes seeding w /fiber blanket #S150 by North American Green
minimum at all times.
Q
7. Storm inlets are to be protected immediately
after installation with Drop Inlet Protection or Fiber
w
Logs.
8. Contractor shall control mud accumulation on all
streets surrounding project by installing stone
surface at all locations where construction traffic
mixture: 31 fescue
leaves the site. Dust shall be kept to a minimum
by utilizing sprinkling, Calcium Chloride, Vegetative
cover, spray on adhesives or other (jpproved
19% perennial rye
19% annual rye
methods.
S
9. Maintain all filters and traps during construction
to prevent any blockages from accumulated
14% orchard grass
10% Kentucky bluegrass
sediment. Additional seeding and straw bales may
`
be required during construction as specified by
J
J
Engineer or Soil and Water Conservation District.
Payment for additional straw bales shall be at the
O
contractor's expense. Payment for additional
:E
rip —rap (not shown on plans) and seeding shall be
paid for on a unit basis.
10. Contractor shall install all sanitary sewers, storm
Y
sewers, subsurface drains, curbs, pavement and
water mains. Disturbed areas will be stabilized
V)
after the storm and sanitary are installed.
U
Disturbed areas will be stabilized after curbs, SSD
and pavement are completed unless utilities are
starting construction within 15 days of completing
the curbs. Stabilize disturbed areas after the
Q
utilities are installed.
11. Complete Landscaping and sedding all remaining
disturbed areas and remove all BMP's when areas
are stabilized.
u►u►,
STOEPpF "11111
No.
19358
? o' STATE OF
�s••.........•
s�
SCALE: 1 "= 40'
M
W
Q
o
m ' O O
o m W ^II oN
L0
O
N
N
0
w
L�
w
U
FIN
(n N Q
Z
O) 0
O to
� I
W
V
0 X
Z Q
Q LL-
_J
Q0
I
N
W r\
liJ I
Z_ O
O
00
Z
W
Ln
Z
F
I � cn
D -;I- J
00 0
o_
Z z
O Q
U
V)
J_
Q
H
LJJ
0
z
Q
z
Z
O
Z
P
WVJ
0
Z
I—�
0
<�
U)
>
Z
W
-
Denotes Construction Limits
O4d
W
Z
w
UJ
6O Denotes Silt Fence
Z
2
W r n
CD Cn
0
Temporary "Drop Inlet Protection on Basket"
0
O
or Coconut Fiber Erosion Control Logs
J
V
(To be installed immediately after storm inlet installation.)
O
Denotes permanent seeding &mulch areas
Seeding rate: 130# /acre or 3# /1000 S.F.
Z Q
Q
Seeding mixture: 25% creeping red fescue
35%
O
perennial rye
40% Kentucky bluegrass
w
Denotes seeding w /fiber blanket #S150 by North American Green
Q
w
Seeding rate: 110# /acre or 2.5# /1000 S.F.
Seeding 38% Kentucky
a
mixture: 31 fescue
19% perennial rye
19% annual rye
S
14% orchard grass
10% Kentucky bluegrass
w
`
J
J
O
:E
Y
V)
U
Q
W
Q
o
m ' O O
o m W ^II oN
L0
O
N
N
0
w
L�
w
U
FIN
(n N Q
Z
O) 0
O to
� I
W
V
0 X
Z Q
Q LL-
_J
Q0
I
N
W r\
liJ I
Z_ O
O
00
Z
W
Ln
Z
F
I � cn
D -;I- J
00 0
o_
Z z
O Q
U
V)
J_
Q
H
LJJ
0
z
Q
z
SHEET N0.
A9. * Specific Points Where Stormwater Discharge Will Leave this Site: C300
Outlet pipes entering the existing lake.
106 NO.47425LA
Z
O
P
WVJ
Z
I—�
<�
Ld
Lu
/��
V!,
-
Denotes Construction Limits
O4d
W
UJ
6O Denotes Silt Fence
Z
2
W r n
CD Cn
0
Temporary "Drop Inlet Protection on Basket"
D
J
O
or Coconut Fiber Erosion Control Logs
J
(To be installed immediately after storm inlet installation.)
O
Denotes permanent seeding &mulch areas
Seeding rate: 130# /acre or 3# /1000 S.F.
Z Q
Seeding mixture: 25% creeping red fescue
35%
O
perennial rye
40% Kentucky bluegrass
w
Denotes seeding w /fiber blanket #S150 by North American Green
Q
Seeding rate: 110# /acre or 2.5# /1000 S.F.
Seeding 38% Kentucky
mixture: 31 fescue
19% perennial rye
19% annual rye
S
14% orchard grass
10% Kentucky bluegrass
`
J
J
O
:E
V)
U
SHEET N0.
A9. * Specific Points Where Stormwater Discharge Will Leave this Site: C300
Outlet pipes entering the existing lake.
106 NO.47425LA