Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
T1.1 TITLE.PDF
Project Number: Sheet Title: Issue Date: Sheet Number: Project: CA R M E L , I N D I A N A 4 6 0 3 2 By: Architect: Architecture / Project Managment: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) RE E S E K I T C H E N S Drawn By Checked ByPrint Date Revisions: 20 0 S O U T H R A N G E L I N E R O A D SU I T E 2 0 1 IN D I A N A D E S I G N C E N T E R COPYRIGHT & OWNERSHIP: T1.1 TITLE Parcel 12 PEDCOR DESIGN GROUP, LLC 2/13/13 CONSTRUCTION DOCUMENTS 02/14/13 STATE RELEASE SET THIS DOCUMENT IS AN INSTRUMENT OF SERVICE AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2013, JAMES R. STUTZMAN, AIA, NCARB, CARMEL. PLAN NORTH 1 A E G M 11 5 L.E.S.M.C. 11 GEA M 5 1 PLAN NORTH KEY PLAN SCALE: N.T.S. SECOND FLOOR PLAN NORTH PLAN NORTH ARCHITECT: JAMES ROBERT STUTZMAN, AIA, NCARB PEDCOR DESIGN GROUP, LLC 355 CITY CENTER DRIVE CARMEL, INDIANA 46032 PHONE: (317) 705-7979 FAX: (317) 705-7980 DRAWING INDEX T1.1 Title Sheet T1.2 Specifications T1.3 Parking Level Life Safety Plan T1.4 First Level Life Safety Plan T1.5 Second Level Life Safety Plan A0.0 Demolition Plan A1.0 New Work Plan A1.1 Showroom Display Install Plan A1.4 Furniture Plan A3.0 FInish Schedule, Door Schedule, Specifications & Notes E1.0 Power/Communications Plan E2..0 Lighting Plan M1.0 Mechanical & Plumbing Plan 1 A1.1 SECTION CUT WINDOW NUMBER DOOR NUMBER ROOM NAME & NUMBER ELEVATION REFERENCE 1 A1.1 SECTION REFERENCE DETAIL REFERENCE REFERENCE SYMBOLS 1 A1.1 WHICH DETAIL APPEARS INDICATES SHEET IN INDICATES DETAIL NUMBER A 1 A1.1 EL. = 100'-0" T.O. FINISHED FLOOR ELEVATION MARK 1 A1.1 100 OFFICE 100 SCALE: 1/8" = 1'-0" PLAN OWNER: INDIANA DESIGN CENTER, LLC 770 3RD AVE., SW CARMEL, INDIANA 46032 APPROVED APPROVED AS NOTED REJECTED SIGNED:_____________________________________ DATE:_________________ COMPANY:__________________________________________________________ TENANT: FERGUSON ENTERPRISES, INC. 12500 JEFFERSON AVENUE NEWPORT NEWS, VA 23602 VICINITY MAP SITE MAP REESE KITCHENS INDIANA DESIGN CENTER STATE RELEASE SET 1. ITEMS TO BE SUPPLIED & INSTALLED BY FEI: A) TELEPHONE, DATA, & SECURITY WIRING & EQUIPMENT B) STORE FIXTURES & FURNITURE C) APPLIANCES (COFFEE MAKER, REFRIGERATOR) ITEMS TO BE SUPPLIED & INSTALLED BY THE CONTRACTOR: A) ALL FLOORING -CARPET, CERAMIC, WOOD, STAINED CONCRETE, ETC. 2. CONTRACTOR TO PURCHASE ALL MATERIALS THROUGH FERGUSON ENTERPRISES, IF APPLICABLE. 3. ALL WORK PERFORMED SHALL BE IN COMPLIANCE WITH ALL UPDATED STATE & LOCAL CODES. 4. CONTRACTOR TO PROVIDE, ANY/ ALL ADDITIONAL ARCHITECTURAL OR ENGINEERING NECESSARY TO OBTAIN ALL PERMITS AS REQUIRED BY LOCAL BUILDING CODES. DRAWINGS ARE TO BE REVIEWED BY FEI PROJECT MANAGER BEFORE PERMITTING. A COPY OF THE DRAWINGS ARE TO BE SENT TO PROJECT MANAGER IN BOTH HARD COPY & A CD OF CAD 2004 FORMAT BEFORE CONSTRUCTION STARTS. 5. CONTRACTOR TO PROVIDE ALL PERMITS, LABOR & MATERIALS NECESSARY TO PERFORM ALL WORK AS DIRECTED ON DRAWINGS. THESE DRAWINGS ARE DIAGRAMMATIC. ACTUAL FIELD CONDITIONS WILL HAVE TO BE VERIFIED BY THE CONTRACTOR. ALL BIDDERS ARE OBLIGATED TO VISIT THE JOB SITE, PRIOR TO BIDDING & REPORT CONFLICTS TO FERGUSON PROJECT MANAGER. 6. NEW WALLS TO BE CONSTRUCTED WITH MIN. 3 5/8" METAL STUDS @ 16" O.C. ALL NEW WALLS TO HAVE 1/2" THICK DRYWALL (GWB) ON EACH SIDE OF METAL STUDS. ADD/ REPAIR INSULATION TO ALL AREAS THAT SEPARATE CONDITIONED FROM NON CONDITIONED AREAS AS PER LOCAL CODES. 7. PROJECT MANAGER SHALL BE NOTIFIED WHEN FIELD CONDITIONS NECESSITATE CHANGES TO CRITICALLY DIMENSIONED PARTITIONS AND MILLWORK LOCATIONS. ANY DEVIATION FROM DIMENSIONS INDICATED ON DRAWINGS IS TO BE APPROVED BY PROJECT MANAGER. 8. COORDINATE LOCATION OF ELECTRICAL, PLUMBING AND MECHANICAL DEVICES TO AVOID CONFLICT. PROVIDE ROUGH-IN AS REQUIRED, FOR ITEMS TO BE SUPPLIED BY FEI AND INSTALLED BY CONTRACTOR. 9. CONTRACTOR TO ADD BLOCKING AS REQUIRED FOR ALL CABINETRY, PEDESTAL LAVS, MEDICINE CABINETS, MIRRORS, ETC, AS WELL AS, ANY BRACKETS REQUIRED FOR WALL HUNG TOILETS OR VANITIES. FEI TO SUPPLY THE BRACKET; CONTRACTOR IS RESPONISIBLE FOR INCASING THE BRACKET IN THE WALL INCREASING WALL THICKNESS IF REQUIRED. 10. INSTALL ALL MATERIALS PER MANUFACTURERS SPECIFICATIONS. 11. THERE WILL BE NO SUBSTITUTIONS FOR MATERIALS. CONTRACTOR MUST ORDER MATERIALS WELL IN ADVANCE TO ENSURE DELIVERY WHEN NEEDED. 12. CONTRACTOR TO CUT BASE IN SHOWROOM AND ATTACH TO WALL IN A TEMPORARY FASHION TO ALLOW FOR REMOVAL/TRIMING AT TIME OF DISPLAY INSTALL. BASE WILL BE PERMANENTLY INSTALLED DURING DISPLAY INSTALLATION BY DISPLAY INSTALL TEAM. 13. CONTRACTOR IS TO SUPPORT ALL ISLAND HOODS BY 3/8" THREADED ROD FROM THE BUILDING STRUCTURE ABOVE AND PAINT FLAT BLACK. 14. MECHANICAL AND ELECTRICAL IS DESIGN-BUILD. DESIGN-BUILD CONTRACTOR & ENGINEER TO VERIFY EXISTING CONDITIONS AND COORDINATE DESIGN OF RELOCATED AND NEW DIFFUSERS, SPRINKLER HEADS, FIRE PROTECTION DEVICES, EXIT LIGHTS, EMERGENCY NIGHT LIGHTS, AND THERMOSTATS. DESIGN-BUILD CONTRACTOR TO COORDINATE HIS WORK WITH THE LIGHTING PLAN. ALL QUESTIONS ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING. REFER TO MECHANICAL DRAWINGS FOR RELOCATION OF THERMOSTATS. CONTRACTOR TO VERIFY WITH TENANT THERMOSTAT LOCATIONS FOR FURNITURE LOCATION CONFLICTS BEFORE PROCEEDING. 15. ELECTRICAL CONTRACTOR & ENGINEER IS RESPONSIBLE FOR DESIGN-BUILD OF ALL SAFETY SYSTEMS. ENGINEER IS TO VERIFY QUANTITY AND PLACEMENT OF INDICATED SAFETY DEVICES (EXIT SIGNS, ALARMS, ETC.) AND VERIFY CONFORMANCE WITH LOCAL AND STATE CODES. DESIGN BUILD CONTRACTOR IS RESPONSIBLE FOR SUBMITTING NECESSARY DRAWINGS & ENGINEERED CERTIFICATION CALCULATIONS AND SPECIFICATIONS FOR REVIEW AND OBTAINING PERMITS. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING DRAWINGS TO ARCHITECT FOR REVIEW AND COORDINATION OF LOCATION OF DEVICES. GENERAL NOTES