Loading...
HomeMy WebLinkAbout05050054.2LINETYPE LEGEND: ` (SF) = SILT FENCE x x x = BARB WIRE FENCE o o o = CHAIN -LINK FENCE I -I I I I -I = WOOD FENCE VV = WATER LINE STRM = STORM SEWER LINE SAN = SANITARY SEWER LINE GAS = GAS LINE UGE = UNDERGROUND ELECTRIC LINE OHE = OVERHEAD ELECTRIC LINE Comm = COMMUNICATION LINE T = TELEPHONE LINE UTELE = UNDERGROUND TELEPHONE LINE FO = FIBER OPTIC LINE FW = FIRE DEPARTMENT WATER SUPPLY 35' ESMT = 35' EASEMENT LINE 30' ESMT = 30' EASEMENT LINE 25' ESMT = 25' EASEMENT LINE 20' ESMT = 20' EASEMENT LINE 15' ESMT =15' EASEMENT LINE 10' ESMT =10' EASEMENT LINE 5' ESMT = 5' EASEMENT LINE ESMT = EASEMENT LINE 000) = SWALE LINE 000 = EDGE OF WATER 35' SETBK = 35' SETBACK LINE 30' SETBK = 30' SETBACK LINE 25' SETBK = 25' SETBACK LINE 20' SETBK = 20' SETBACK LINE 15' SETBK =15' SETBACK LINE 10' SETBK =10' SETBACK LINE 5' SETBK = 6 SETBACK LINE SETBACK = SETBACK LINE ROW = RIGHT -OF -WAY LINE - = PROPERTY BOUNDARY UD = SWALE UNDERDRAIN CABLE = CABLE TV LINE FL> = FLOW LINE PROTECTION AND DEMOLITION NOTES: TREE REMOVAL AND PROTECTION: 1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE OCCUPIED BY ROAD, SURFACED AREAS, OR DRAINAGE SWALES. 2. TREES HALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY WITH THE PLACEMENT OF STORM OR SANITARY SEWERS AND THAT SUCH EXCAVATION WILL BE FATAL TO TREES. I CLEARING AND GRUBBING: 1. CLEARING AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY DISPOSING OF ALL TREES, BRUSH,PROJECTINGROOTS,3TUMPS ;RUBBISH, BROKEN PAVEMENT, BROKEN CONCRETE, FENCING (AS DESIGNATED) AND OTHER MATERIALS ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE CONSTRUCTION DOCUMEN IS AND / OR DESIGNATED BY THE CONSTRUCTION LIMITS. 2. ALL'UNSUITABLE MATERIAL' FROM CLEARING OPERATIONS SHALL BE REMOVED TO DISPOSAL AREAS AS DIRECTED BY GENERAL CONTRACTOR. STRIPPING OF TOPSOIL: 1. THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS TO BE OCCUPIED BY ROADS, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO REMOVE ORGANIC MATTER WHERE REQUIRED. 2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND / OR FUTURE STRUCTURAL AREAS. 3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH CONSTRUCTION OPERATIONS AS DIRECTED BY THE GENERAL CONTRACTOR. 4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES. DEMOLITION: 1. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLMON SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID PRICE SHALL REFLECT SAID DRAWINGS. 2. THE CONTRACTOR SHALL OBTAIN FROM ALL APPLICABLE GOVERNMENT AUTHORITIES NECESSARY PERMITS REQUIRED. A COPY OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY WORK HEREIN. 3. ALL EXISTING MANHOLE CASTINGS TO BE ADJUSTED TO FINISH GRADE. GRADING NOTES: GENERAL GRADE NOTES: 1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORATION ( INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTION BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 2. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION. PROPER MOISTURE CONTENT OF FILL MATERICAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FURTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95`Yo OF THE MAXIMUM DRY DENSITY PER ASTM D -1557, FIELD COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT SECTION 211. 3. MAXIMUM LAWN SLOPE IS 3:1. 4. THE CONTRATOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 5. ALL SPOT ELEVATIONS ARE TO FINISHED GRADE. 6. COMPACT'B' BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS. REINFORCED CONCRETE PIPE: 1. REINFORCED CONCRETE PIPE SHALL BE CLASS III, IV OR V AS SPECIFIED IN ASTM C-76. 2. REINFORCED ELLIPTICAL CONCRETE PIPE SHALL BE CLASS HE -III OR HE -IV AS SPECIFIED IN ASTM =7. 3. LIFT HOLES ARE NOT ALLOWED FOR PIPE LESS THAN 24 INCHES IN DIAMETER A MAXIMUM OF TWO LIFT HOLES ARE ALLOWED FOR PIPE 24 INCHES IN DIAMETER OR LARGER. LIFT HOLES SHALL BE REPAIRED ACCORDING TO MOST RECENT INDOT STANDARD SPECIFICATIONS. 4. FITTINGS AND SPECIALTIES SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS FOR THE TYPE OF PIPE BEING USED. 5. EACH PIPE SECTION SHALL BE MARKED WITH DATE OF MANUFACTURE, SIZE AND CLASS OF PIPE, SPECIFICATION DESIGNATION, MANUFACTURER AND PLANT IDENTIFICATION. 6. PIPE SHALL BE FURNISHED WITH A BELL OR GROOVE ON ONE END OF A UNIT OF PIPE AND A SPIGOT OR TONGUE ON THE ADJACENT END OF THE ADJOINING PIPE. ALL JOINTS SHALL HAVE A GROOVE ON THE SPIGOT FOR PLACEMENT OF A RUBBER *O-RING' OR PROFILE GASKET IN ACCORDANCE WITH ASTM C-443. THE GASKET SHALL BE A CONTINUOUS RING WHICH FITS SNUGLY INTO THE ANNULAR SPACE BETWEEN THE OVERLAPPING SURFACES OF THE ASSEMBLED PIPE JOINT. INSTALLATION SCHEDULE: SYMBOL LEGEND: CONSTRUCTION SCHEDULE: PRE - CONSTRUCTION ACTIONS BEFORE CONSTRUCTION, EVALUATE, MARK AND +741.25 PROTECT IMPORTANT TREES AND ASSOCIATED - = STORM SEWER END SECTION ROOTING ZONES, UNIQUE AREAS (e.g., WETLANDS) TO = NEW GRADE ELEVATION BE PRESERVED, ON SITE SEPTIC SYSTEM ABSORPTION FEB FIELDS, AND VEGETATION SUITABLE FOR FILTER APR. STRIPS, ESPECIALLY IN PERIMETER AREAS. = SANITARY SEWER CLEANOUT X1NN'L5 = EXISTING GRADE ELEVATION C.O. = CLEANOUT PERMANENT SEEDING =STRAW BALE DAM INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE = MANHOLE IS ASSESSED. INSTALL ADDITIONAL RUNOFF CONTROL PROTECTION) ® = CATCH BASIN WHERE NECESSARY, STABILIZE STREAMBANKS AS =ROCK DAM ® =CATCH BASIN �- = SIGN REMAINDER OF SYSTEM AFTER GRADING. = CURB INLET BEGIN MAJOR CLEARING AND GRADING AFTER (CUTTINGIFILLINGIGRADING, DRAINS, SEDIMENT INSTALLING THE KEY SEDIMENTAND RUNOFF TRAPS, BARRIERS, DIVERSIONS, SURFACE STOP =STOP SIGN O PLI =FIRE HYDRANT GRADING PROGRESSES. SURFACE STABILIZATION 0 = PRESSURE RELIEF VALVE MEASURES IMMEDIATELY ON ALL DISTURBED AREAS = HANDICAP SIGN 0 BUILDING CONSTRUCTION INSTALL NECESSARY EROSION AND SEDIMENT (BUILDINGS, UTILITIES, PAVING) w w„ LANDSCAPING & FINAL STABILIZATION 0 = ENTER ONLY SIGN SPOIL AREAS. REMOVE TEMPORARY CONTROL = WATER VALVE MEASURES AND STABILIZE. 0 �w =WATER WELL Ay = EXIT ONLY SIGN GV = GAS VALVE O = DO NOT ENTER SIGN Z = LIGHT POLE �a%S TF'q+ti 8� (� = UTILITY POLE %rl \� °EVERGREEN TREE - PROPERTY CORNER O IRF IRF =IRON ROD FOUND 0 = DECIDUOUS TREE O RBF RBF = REBAR FOUND = SURVEY POINT =BUSH (SECTION CORNER) BM = BENCHMARK r = SOIL BORING PROTECTION AND DEMOLITION NOTES: TREE REMOVAL AND PROTECTION: 1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE OCCUPIED BY ROAD, SURFACED AREAS, OR DRAINAGE SWALES. 2. TREES HALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY WITH THE PLACEMENT OF STORM OR SANITARY SEWERS AND THAT SUCH EXCAVATION WILL BE FATAL TO TREES. I CLEARING AND GRUBBING: 1. CLEARING AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY DISPOSING OF ALL TREES, BRUSH,PROJECTINGROOTS,3TUMPS ;RUBBISH, BROKEN PAVEMENT, BROKEN CONCRETE, FENCING (AS DESIGNATED) AND OTHER MATERIALS ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE CONSTRUCTION DOCUMEN IS AND / OR DESIGNATED BY THE CONSTRUCTION LIMITS. 2. ALL'UNSUITABLE MATERIAL' FROM CLEARING OPERATIONS SHALL BE REMOVED TO DISPOSAL AREAS AS DIRECTED BY GENERAL CONTRACTOR. STRIPPING OF TOPSOIL: 1. THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS TO BE OCCUPIED BY ROADS, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO REMOVE ORGANIC MATTER WHERE REQUIRED. 2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND / OR FUTURE STRUCTURAL AREAS. 3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH CONSTRUCTION OPERATIONS AS DIRECTED BY THE GENERAL CONTRACTOR. 4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES. DEMOLITION: 1. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLMON SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID PRICE SHALL REFLECT SAID DRAWINGS. 2. THE CONTRACTOR SHALL OBTAIN FROM ALL APPLICABLE GOVERNMENT AUTHORITIES NECESSARY PERMITS REQUIRED. A COPY OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY WORK HEREIN. 3. ALL EXISTING MANHOLE CASTINGS TO BE ADJUSTED TO FINISH GRADE. GRADING NOTES: GENERAL GRADE NOTES: 1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORATION ( INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTION BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 2. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION. PROPER MOISTURE CONTENT OF FILL MATERICAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FURTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95`Yo OF THE MAXIMUM DRY DENSITY PER ASTM D -1557, FIELD COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT SECTION 211. 3. MAXIMUM LAWN SLOPE IS 3:1. 4. THE CONTRATOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 5. ALL SPOT ELEVATIONS ARE TO FINISHED GRADE. 6. COMPACT'B' BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS. REINFORCED CONCRETE PIPE: 1. REINFORCED CONCRETE PIPE SHALL BE CLASS III, IV OR V AS SPECIFIED IN ASTM C-76. 2. REINFORCED ELLIPTICAL CONCRETE PIPE SHALL BE CLASS HE -III OR HE -IV AS SPECIFIED IN ASTM =7. 3. LIFT HOLES ARE NOT ALLOWED FOR PIPE LESS THAN 24 INCHES IN DIAMETER A MAXIMUM OF TWO LIFT HOLES ARE ALLOWED FOR PIPE 24 INCHES IN DIAMETER OR LARGER. LIFT HOLES SHALL BE REPAIRED ACCORDING TO MOST RECENT INDOT STANDARD SPECIFICATIONS. 4. FITTINGS AND SPECIALTIES SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS FOR THE TYPE OF PIPE BEING USED. 5. EACH PIPE SECTION SHALL BE MARKED WITH DATE OF MANUFACTURE, SIZE AND CLASS OF PIPE, SPECIFICATION DESIGNATION, MANUFACTURER AND PLANT IDENTIFICATION. 6. PIPE SHALL BE FURNISHED WITH A BELL OR GROOVE ON ONE END OF A UNIT OF PIPE AND A SPIGOT OR TONGUE ON THE ADJACENT END OF THE ADJOINING PIPE. ALL JOINTS SHALL HAVE A GROOVE ON THE SPIGOT FOR PLACEMENT OF A RUBBER *O-RING' OR PROFILE GASKET IN ACCORDANCE WITH ASTM C-443. THE GASKET SHALL BE A CONTINUOUS RING WHICH FITS SNUGLY INTO THE ANNULAR SPACE BETWEEN THE OVERLAPPING SURFACES OF THE ASSEMBLED PIPE JOINT. INSTALLATION SCHEDULE: CONSTRUCTION PHASE: CONSTRUCTION SCHEDULE: PRE - CONSTRUCTION ACTIONS BEFORE CONSTRUCTION, EVALUATE, MARK AND (EVALUATIONIPROTECTION OF IMPORTANT SITE PROTECT IMPORTANT TREES AND ASSOCIATED CHARACTERISTICS) ROOTING ZONES, UNIQUE AREAS (e.g., WETLANDS) TO STABILIZATION PRACTICE BE PRESERVED, ON SITE SEPTIC SYSTEM ABSORPTION FEB FIELDS, AND VEGETATION SUITABLE FOR FILTER APR. STRIPS, ESPECIALLY IN PERIMETER AREAS. CONSTRUCTION ACCESS STABILIZE BARE AREAS IMMEDIATELY WITH GRAVEL AND (CONSTRUCTION ENTRANCES, CONSTRUCTION TEMPORARYVEGETATION AS WORK TAKES PLACE ROUTES, EQUIPMENT PARKING AREAS) PERMANENT SEEDING SEDIMENT BARRIERS AND TRAPS INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE (BASIN TRAPS, SILT FENCES, OUTLET IS ASSESSED. INSTALL ADDITIONAL RUNOFF CONTROL PROTECTION) MEASURES DURING GRADING AS NEEDED. RUNOFF CONVEYANCE SYSTEM WHERE NECESSARY, STABILIZE STREAMBANKS AS (STABILIZED STREAM - BANKS, STORM DRAINS, EARLY AS POSSIBLE. INSTALL PRINCIPLE CONVEYANCE INLET AND OUTLET PROTECTIONS, CHANNELS) SYSTEM WITH RUNOFF CONTROL MEASURES. INSTALL REMAINDER OF SYSTEM AFTER GRADING. LAND CLEARING AND GRADING BEGIN MAJOR CLEARING AND GRADING AFTER (CUTTINGIFILLINGIGRADING, DRAINS, SEDIMENT INSTALLING THE KEY SEDIMENTAND RUNOFF TRAPS, BARRIERS, DIVERSIONS, SURFACE MEASURES. CLEAR BORROW AND DISPOSAL AREAS AS ROUGHENING) NEEDED. INSTALL ADDITIONAL CONTROL MEASURES AS J GRADING PROGRESSES. SURFACE STABILIZATION APPLY TEMPORARY OR PERMANENT STABILIZATION (TEMPORARY AND PERMANENT SEEDING, MEASURES IMMEDIATELY ON ALL DISTURBED AREAS MULCHING, SODDING, RIPRAP) WHERE WORK IS DELAYED OR COMPLETED. BUILDING CONSTRUCTION INSTALL NECESSARY EROSION AND SEDIMENT (BUILDINGS, UTILITIES, PAVING) CONTROL PRACTICES AS WORK TAKES PLACE. LANDSCAPING & FINAL STABILIZATION STABILIZE ALL OPEN AREAS, INCLUDING BORROW AND (TOP SOILING, TREES AND SHRUBS, PERMANENT SPOIL AREAS. REMOVE TEMPORARY CONTROL SEEDING, MULCHING, SODDING, RIPRAP) MEASURES AND STABILIZE. SITE NOTES: GENERAL NOTES: 1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION ( INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 2. ALL RADII SHALL BE 5 FOOT UNLESS NOTED OTHERWISE ON PLANS. 3. CONTRACTOR TO VERIFY EXACT LOCATION AND INVERT OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. STORM SEWER PIPE OF OTHER MATERIAL OR MATERIAL NOT MEETING THESE SPECIFICATIONS SHALL REQUIRE THE PRIOR WRITTEN APPROVAL OF THE ENGINEER. PAVEMENT CONSTRUCTION: 1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION, SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF SUBGRADE, PAVEMENT, CURBS AND WALKS. A) PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING. B) BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 403. C) FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE WITH INDOT SECTION 208. CONCRETE PAVEMENT AND WALKS: 1. SEE DETAIL FOR TYPE AND DETAILS. 2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO ASTM C-150. AGGREGATES SHALL CONFORM TO ASTM C•33. COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED, REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO ASTM A -185. 3. ALL EXTERIOR CONCRETE SHALL CONTAIN 6%:t 1% AIR ENTRAINMENT. APPLICATION: A) PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN ACCORDANCE WITH INDOT SECTION 604 AND 605. B) CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF 35 DEGREES OR LESS, PARAGRAPH 702.10 OF THE INDOT SPECIFICATIONS SHALL APPLY. C) EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS DESCRIBED IN INDOT SECTION 501.17. PARKING LOT STRIPING: 1. PAINT MATERIAL SHALL COMPLY WITH FEDERAL SPECIFICATION Tr-P-1 15A FOR TRAFFIC PAINT WITHOUT GLASS SPHERES. (COLOR BY OWNER SELECTION). 2. SUBCONTRACTOR TO PERFORM ALL FIELD LAYOUT WORK NECESSARY TO ACHIEVE STRAIGHT AND TRUE LINES. ASPHALT MUST BE CLEANED NTH POWER BROOM AND HAND BROOM TO REMOVE LOOSE MATERIAL BEFORE STRIPING. THE SUBCONTRACTOR IS TO PROVIDE BARRIERS TO PREVENT MARRING OF LINES BY VEHICLES UNTIL PAINT HAS DRIED. STRIPING PAINT SHALL BE APPLIED AT THE MINIMUM RATE OF ONE GALLON PER 100 SQUARE FEET OF PAINT (BASED ON 39% SOLIDS) AT A WIDTH OF FOUR INCHES. STREET PAVEMENT NOTES: 1. MATERIALS AND CONSTRUCTION FOR STREETS, WALKS, CURBS AND STORM WATER SEWERS SHALL CONFORM TO THE REQUIREMENTS OF THE INDIANA DEPARTMENT OF TRANSPORTATION 'STANDARD SPECIFICATIONS' LATEST PRINTED EDITION UNLESS SHOWN OR NOTED OTHERWISE. 2. PAVEMENT COMPOSITION NOTED ON DETAIL IS THE MINIMUM REQUIREMENT FOR STREET CLASSES 1, 2, 3, 4 AND 5, WITH A GOOD SUB -GRADE SOIL CLASSIFICATION. PAVEMENT COMPOSITION FOR OTHER CLASSES OF STREET SHALL BE DESIGNED WITH CONSIDERATION GIVEN TO THE TRAFFIC VOLUME. SUB -GRADE SOIL EVALUATION AND TYPE OF PAVEMENT MATERIAL TO BE USED. 3. THE SUB -GRADE MUST BE PROOF ROLLED BY THE CONTRACTOR USING A FULLY LOADED TANDEM TRUCK. A TOWN REPRESENTATIVE MUST BE PRESENT FOR PROOF ROLL. 4. ASPHALT BASE SHALL BE LAID IN NO MORE THAN 3' LIFTS. SURFACE ASPHALT SHALL BE LAID IN NO MORE THAN 1 11T LIFTS. ASPHALT SHALL BE ROLLER COMPACTED AS PER INDOT SPECIFICATIONS SEC. 402.13. 5. TEMPERATURE SHALL BE 32T AND RISING FOR BASE MATERIAL AND 45T AND RISING FOR TOP COAT MATERIAL 6. NO ASPHALT SHALL BE INSTALLED ON FROZEN OR WET SUBSURFACE 7. STREET CUT REPAIRS SHALL USE 100 PSI QUICK SET FLOWABLE FILL TO WITHIN 6' OF PAVEMENT SURFACE. INSTALL 5' OF 4000 PSI READY MIX CONCRETE WITHIN V OF PAVEMENT WITHIN 2 -24 HOURS AFTER FLOWABLE FILL HAS BEEN INSTALLED. INSTALL 1' OF #11 SURFACE ASPHALT LEVEL WITH EXISTING PAVEMENT WITHIN 24 HOURS OF CONCRETE BEING INSTALLED. TOWN OF WHTTESTOWN MAY PERMIT USE OF #8 STONE AS AN ALTERNATIVE IN EXTREME SITUATIONS. CONDITIONS WHICH MAY WARRANT #8 STONE SUBSTITUTE INCLUDE TIME OF DAY, COLD MIX MUST BE MAINTAINED AS A SMOOTH SURFACE UNTIL PERMANENT PATCH IS COMPLETE. NO STONE SUBSTITUTE WILL BE ALLOWED FOR COLLECTOR STREETS. 8. FLOWABLE FILL SHALL BE USED FOR BACKFILLING ALL EXCAVATIONS THAT REQUIRE CUT THROUGH EXISTING PAVEMENT. FLOWABLE FILL SHALL BE A MIXTURE OF SAND, PORTLAND CEMENT AND WATER, THOROUGHLY MIXED; AND SHALL HAVE A 100 PSI COMPRESSIVE STRENGTH WITHIN 3 HOURS OF PLACEMENT. FLOWABLE FILL SHALL BE PLACED FROM TOP OF #8 STONE COVER FOR PIPE TO BOTTOM OF NEW PAVEMENT. EROSION CONTROL NOTES: SOIL EROSION CONTROL SUMMARY: 1. CONTRACTOR SHALL INSTALL SODDING, STRAW BALE DROP INLET PROTECTION, AND STRAW BALE FILTERS AS SHOWN. 2. MASS GRADE THE SITE (SIDES OF SWALES, MOUNDS AND PONDS TO BE SODDED OR SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS, ANNUAL RYE GRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR DISTURBED AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES. 3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR OTHER APPROVED METHODS. 4. MAINTAIN ALL FILTERS DURING CONSTRUCTION TO PREVENT ANY BLOCKAGES FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR SOIL CONSERVATION SERVICE. RIPRAP SHALL BE PLACED IN AREAS OF HIGH VELOCITY STREAM FLOW (MINIMUM SIZE 113 CU.FT.). PAYMENT FOR ADDITIONAL STRAW BALES AND RIPRAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT BASIS. 5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER SYSTEM IS INSTALLED. 6. ALL PROPOSED STREET AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE IS PREPARED. 7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY WHEN THERE IS SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER EROSION. 8. ALL SWALES SHALL BE SEEDED AND SODDED (AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN) IMMEDIATELY AFTER FINAL GRADING. I 9. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS, i 'OCTOBER 1, 1992 EDITION. i MAINTENANCE: INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. (CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE: VIGOROUS DARK GREEN OR BLUISH -GREEN SEEDLINGS; UNIFORM DENSITY WITH NURSE PLANTS, LEGUMES, AND GRASSES WELL INTER - MIXED; GREEN LEAVES; AND THE PERENNIALS REMAINING GREEN THROUGHOUT THE SUMMER, AT LEAST AT THE PLANT BASE.) PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILINZING, OVER- OR RESEEDING, AND MULCHING. IF PLANT COVER IS SPARSE OR PATCHY, REVIEW THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCHING AFTER RE- PREPARING THE SEEDBED. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SWCD OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. EROSION CONTROL NOTES: PRIOR TO ANY WORK BEING DONE, SILT FENCING SHALL BE INSTALLED. AFTER COMPLETION OF A STORM STRUCTURE, THE CURB INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. ALL AREAS NOT DENOTING PERMANENT SEEDING OR FIBER BLANKETS SHALL BE TEMPORARILY SEEDED. THE EARTHWORK CONTRACTOR IS RESPONSIBLE FOR KEEPING THE EXISTING ROADWAYS CLEAR OF DIRT AND DEBRIS. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY INSPECTOR AS CONDITIONS WARRANT. EROSION PROTECTION DURING CONSTRUCTION AND SEEDING: 1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING CONSTRUCTION SUCH AS, BUT NOT LIMITED T0: A) STRAW BALE DAMS B) MULCH AND SEEDING C) SOIL STABILIZATION FABRIC 2. DETAILS AND PLACEMENT SPECIFICATION FOR ABOVE ITEMS ARE AVAILABLE ON REQUEST FROM THE ENGINEER. 3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING. UTILITY NOTES: I CONCRETE MANHOLE NOTES: 1. ALL MANHOLES SHALL BE VACUUM TESTED AS PER ASTM C1244 STANDARD METHOD. 2. NO MANHOLES SHALL BE MORE THAN 14' FROM BACK OF CURB. 3. NO MANHOLE SHALL BE LOCATED IN ANY BACKYARD OR SIDE YARD. THEY MUST BE LOCATED IN THE FRONT YARD OR FRONT LOT THAT IS FRONTING A STREET. 4. ALL JOINTS IN MANHOLES SHALL BE SEALED TO PREVENT INFILTRATION BY USING A RUBBER '0 -RING' GASKET AND A 112' EXTRUDABLE PERFORMED GASKET BETWEEN ALL PRECAST SECTIONS. 5. ANNULAR SPACE AROUND SANITARY SEWER AT POINT OF ENTRANCE INTO THE MANHOLE SHALL BE GROUTED COMPLETELY AROUND SANITARY SEWER, INSIDE AND OUTSIDE TO INSURE SMOOTH TRANSITION. 6. WHEN CONNECTING A NEW SEWER INTO AN EXISTING MANHOLE, THE EXISTING MANHOLE SHALL BE BROUGHT UP TO MEET PRESENT STANDARDS, 7. SECTION JOINTS ON PRECAST CONCRETE MANHOLES SHALL BE SEALED WITH BLACK TAR MASTIC 6- ABOVE AND 6' BELOW JOINT, ON MANHOLE EXTERIOR. SEASONAL REVISIONS: SOIL PROTECTION CHART (317) 837 -2767 (317) 837 -7266 (Fax) A = KENTUCKY BLUEGRASS 100 LBSJACRE; CREEPING RED FESCUE 100 LBSJACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400.600 LBSJACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. B = KENTUCKY BLUEGRASS 120 LBSJACRE; CREEPING RED FESCUE 120 LBSJACRE; PLUS 2 TONS STRAW MULCWACRE, OR ADD ANNUAL RYEGRASS 30 LBSJACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 404600 L.BSJACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. C = SPRING OATS 3 BUSHELSIACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 404600 LBSJACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER D = WHEAT OR RYE 2 BUSHELS/ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 404600 LBSJACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILLZER E =ANNUAL RYEGRASS 40 LBSJACRE (1 LB11000 SQ. FT.) FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400.600 LBSJACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. F =SOD G = STRAW MULCH 2 TONSIACRE STABILIZATION PRACTICE JAN FEB MAR APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING W A 11I * II y W z �• Z N < - � Q DORMANT SEEDING B - _ x Q Q W Z .� J 10 Vi Q W B - _ - - TEMPORARY SEEDING C °z * I /II/I /I,I * O 0 w W O SODDING Z �a%S TF'q+ti 8� es? Ale% I/ JI /I I III J/II I II /II * MULCHING r * / I If = IRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER " = IRRIGATION NEEDED FOR 2 WEEKS AFTER SUPPLYING SOD SITE NOTES: GENERAL NOTES: 1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION ( INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 2. ALL RADII SHALL BE 5 FOOT UNLESS NOTED OTHERWISE ON PLANS. 3. CONTRACTOR TO VERIFY EXACT LOCATION AND INVERT OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. STORM SEWER PIPE OF OTHER MATERIAL OR MATERIAL NOT MEETING THESE SPECIFICATIONS SHALL REQUIRE THE PRIOR WRITTEN APPROVAL OF THE ENGINEER. PAVEMENT CONSTRUCTION: 1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION, SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF SUBGRADE, PAVEMENT, CURBS AND WALKS. A) PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING. B) BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 403. C) FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE WITH INDOT SECTION 208. CONCRETE PAVEMENT AND WALKS: 1. SEE DETAIL FOR TYPE AND DETAILS. 2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO ASTM C-150. AGGREGATES SHALL CONFORM TO ASTM C•33. COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED, REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO ASTM A -185. 3. ALL EXTERIOR CONCRETE SHALL CONTAIN 6%:t 1% AIR ENTRAINMENT. APPLICATION: A) PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN ACCORDANCE WITH INDOT SECTION 604 AND 605. B) CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF 35 DEGREES OR LESS, PARAGRAPH 702.10 OF THE INDOT SPECIFICATIONS SHALL APPLY. C) EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS DESCRIBED IN INDOT SECTION 501.17. PARKING LOT STRIPING: 1. PAINT MATERIAL SHALL COMPLY WITH FEDERAL SPECIFICATION Tr-P-1 15A FOR TRAFFIC PAINT WITHOUT GLASS SPHERES. (COLOR BY OWNER SELECTION). 2. SUBCONTRACTOR TO PERFORM ALL FIELD LAYOUT WORK NECESSARY TO ACHIEVE STRAIGHT AND TRUE LINES. ASPHALT MUST BE CLEANED NTH POWER BROOM AND HAND BROOM TO REMOVE LOOSE MATERIAL BEFORE STRIPING. THE SUBCONTRACTOR IS TO PROVIDE BARRIERS TO PREVENT MARRING OF LINES BY VEHICLES UNTIL PAINT HAS DRIED. STRIPING PAINT SHALL BE APPLIED AT THE MINIMUM RATE OF ONE GALLON PER 100 SQUARE FEET OF PAINT (BASED ON 39% SOLIDS) AT A WIDTH OF FOUR INCHES. STREET PAVEMENT NOTES: 1. MATERIALS AND CONSTRUCTION FOR STREETS, WALKS, CURBS AND STORM WATER SEWERS SHALL CONFORM TO THE REQUIREMENTS OF THE INDIANA DEPARTMENT OF TRANSPORTATION 'STANDARD SPECIFICATIONS' LATEST PRINTED EDITION UNLESS SHOWN OR NOTED OTHERWISE. 2. PAVEMENT COMPOSITION NOTED ON DETAIL IS THE MINIMUM REQUIREMENT FOR STREET CLASSES 1, 2, 3, 4 AND 5, WITH A GOOD SUB -GRADE SOIL CLASSIFICATION. PAVEMENT COMPOSITION FOR OTHER CLASSES OF STREET SHALL BE DESIGNED WITH CONSIDERATION GIVEN TO THE TRAFFIC VOLUME. SUB -GRADE SOIL EVALUATION AND TYPE OF PAVEMENT MATERIAL TO BE USED. 3. THE SUB -GRADE MUST BE PROOF ROLLED BY THE CONTRACTOR USING A FULLY LOADED TANDEM TRUCK. A TOWN REPRESENTATIVE MUST BE PRESENT FOR PROOF ROLL. 4. ASPHALT BASE SHALL BE LAID IN NO MORE THAN 3' LIFTS. SURFACE ASPHALT SHALL BE LAID IN NO MORE THAN 1 11T LIFTS. ASPHALT SHALL BE ROLLER COMPACTED AS PER INDOT SPECIFICATIONS SEC. 402.13. 5. TEMPERATURE SHALL BE 32T AND RISING FOR BASE MATERIAL AND 45T AND RISING FOR TOP COAT MATERIAL 6. NO ASPHALT SHALL BE INSTALLED ON FROZEN OR WET SUBSURFACE 7. STREET CUT REPAIRS SHALL USE 100 PSI QUICK SET FLOWABLE FILL TO WITHIN 6' OF PAVEMENT SURFACE. INSTALL 5' OF 4000 PSI READY MIX CONCRETE WITHIN V OF PAVEMENT WITHIN 2 -24 HOURS AFTER FLOWABLE FILL HAS BEEN INSTALLED. INSTALL 1' OF #11 SURFACE ASPHALT LEVEL WITH EXISTING PAVEMENT WITHIN 24 HOURS OF CONCRETE BEING INSTALLED. TOWN OF WHTTESTOWN MAY PERMIT USE OF #8 STONE AS AN ALTERNATIVE IN EXTREME SITUATIONS. CONDITIONS WHICH MAY WARRANT #8 STONE SUBSTITUTE INCLUDE TIME OF DAY, COLD MIX MUST BE MAINTAINED AS A SMOOTH SURFACE UNTIL PERMANENT PATCH IS COMPLETE. NO STONE SUBSTITUTE WILL BE ALLOWED FOR COLLECTOR STREETS. 8. FLOWABLE FILL SHALL BE USED FOR BACKFILLING ALL EXCAVATIONS THAT REQUIRE CUT THROUGH EXISTING PAVEMENT. FLOWABLE FILL SHALL BE A MIXTURE OF SAND, PORTLAND CEMENT AND WATER, THOROUGHLY MIXED; AND SHALL HAVE A 100 PSI COMPRESSIVE STRENGTH WITHIN 3 HOURS OF PLACEMENT. FLOWABLE FILL SHALL BE PLACED FROM TOP OF #8 STONE COVER FOR PIPE TO BOTTOM OF NEW PAVEMENT. EROSION CONTROL NOTES: SOIL EROSION CONTROL SUMMARY: 1. CONTRACTOR SHALL INSTALL SODDING, STRAW BALE DROP INLET PROTECTION, AND STRAW BALE FILTERS AS SHOWN. 2. MASS GRADE THE SITE (SIDES OF SWALES, MOUNDS AND PONDS TO BE SODDED OR SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS, ANNUAL RYE GRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR DISTURBED AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES. 3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR OTHER APPROVED METHODS. 4. MAINTAIN ALL FILTERS DURING CONSTRUCTION TO PREVENT ANY BLOCKAGES FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR SOIL CONSERVATION SERVICE. RIPRAP SHALL BE PLACED IN AREAS OF HIGH VELOCITY STREAM FLOW (MINIMUM SIZE 113 CU.FT.). PAYMENT FOR ADDITIONAL STRAW BALES AND RIPRAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT BASIS. 5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER SYSTEM IS INSTALLED. 6. ALL PROPOSED STREET AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE IS PREPARED. 7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY WHEN THERE IS SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER EROSION. 8. ALL SWALES SHALL BE SEEDED AND SODDED (AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN) IMMEDIATELY AFTER FINAL GRADING. I 9. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS, i 'OCTOBER 1, 1992 EDITION. i MAINTENANCE: INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. (CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE: VIGOROUS DARK GREEN OR BLUISH -GREEN SEEDLINGS; UNIFORM DENSITY WITH NURSE PLANTS, LEGUMES, AND GRASSES WELL INTER - MIXED; GREEN LEAVES; AND THE PERENNIALS REMAINING GREEN THROUGHOUT THE SUMMER, AT LEAST AT THE PLANT BASE.) PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILINZING, OVER- OR RESEEDING, AND MULCHING. IF PLANT COVER IS SPARSE OR PATCHY, REVIEW THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCHING AFTER RE- PREPARING THE SEEDBED. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SWCD OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. EROSION CONTROL NOTES: PRIOR TO ANY WORK BEING DONE, SILT FENCING SHALL BE INSTALLED. AFTER COMPLETION OF A STORM STRUCTURE, THE CURB INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. ALL AREAS NOT DENOTING PERMANENT SEEDING OR FIBER BLANKETS SHALL BE TEMPORARILY SEEDED. THE EARTHWORK CONTRACTOR IS RESPONSIBLE FOR KEEPING THE EXISTING ROADWAYS CLEAR OF DIRT AND DEBRIS. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY INSPECTOR AS CONDITIONS WARRANT. EROSION PROTECTION DURING CONSTRUCTION AND SEEDING: 1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING CONSTRUCTION SUCH AS, BUT NOT LIMITED T0: A) STRAW BALE DAMS B) MULCH AND SEEDING C) SOIL STABILIZATION FABRIC 2. DETAILS AND PLACEMENT SPECIFICATION FOR ABOVE ITEMS ARE AVAILABLE ON REQUEST FROM THE ENGINEER. 3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING. UTILITY NOTES: I CONCRETE MANHOLE NOTES: 1. ALL MANHOLES SHALL BE VACUUM TESTED AS PER ASTM C1244 STANDARD METHOD. 2. NO MANHOLES SHALL BE MORE THAN 14' FROM BACK OF CURB. 3. NO MANHOLE SHALL BE LOCATED IN ANY BACKYARD OR SIDE YARD. THEY MUST BE LOCATED IN THE FRONT YARD OR FRONT LOT THAT IS FRONTING A STREET. 4. ALL JOINTS IN MANHOLES SHALL BE SEALED TO PREVENT INFILTRATION BY USING A RUBBER '0 -RING' GASKET AND A 112' EXTRUDABLE PERFORMED GASKET BETWEEN ALL PRECAST SECTIONS. 5. ANNULAR SPACE AROUND SANITARY SEWER AT POINT OF ENTRANCE INTO THE MANHOLE SHALL BE GROUTED COMPLETELY AROUND SANITARY SEWER, INSIDE AND OUTSIDE TO INSURE SMOOTH TRANSITION. 6. WHEN CONNECTING A NEW SEWER INTO AN EXISTING MANHOLE, THE EXISTING MANHOLE SHALL BE BROUGHT UP TO MEET PRESENT STANDARDS, 7. SECTION JOINTS ON PRECAST CONCRETE MANHOLES SHALL BE SEALED WITH BLACK TAR MASTIC 6- ABOVE AND 6' BELOW JOINT, ON MANHOLE EXTERIOR. Ps ATE�OF �ff lid alp REVISIONS: 3996 Clarks Creek Road Sate #100 Plamflela( lndana 46168 (317) 837 -2767 (317) 837 -7266 (Fax) THESE DRAWINGS ARE GIVEN IN CONFIDENCE AND SHALL BE USED ONLY IN PURSUANT TO THE AGREEMENT WITH MOENCH ENGAVEENNC; P.C. NO OTHER USE OR DUPLICATION MAY BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF MOENCH FJVG EER/NC PC. ALL OTHER COPYRIGHT AND COMMON LAW RIGHTS ARE HEREBY SPECIFICALLY RESERVED. W W = ce Z Q O W z �• Z N < ISSUE SET: PERMIT ISSUE � Q W x Q Q W Z .� J 10 Vi Q W i cz um) WQ °z LL. W 0 O 0 w W O Z �a%S TF'q+ti 8� es? Ale% Ps ATE�OF �ff REVISIONS: 0 ISSUED FOR PERMIT 05418/05 DRAWN BY: jells CHECKED BY: BEM PROJECT NUMBER: 05024 DATE: 5117105 SHEET NUMBER: cool ISSUE SET: PERMIT ISSUE