Loading...
HomeMy WebLinkAbout05050009.11• 0v \ / r x1t . r . • -�- 890 —� 8 t : . . . . . • :I: . . . - ` • - - . 7.69 .. . .. . . ... . ❑ \ ____ ` —_ 889 _ _ -.� `'' .'. ++.•.`. •.\••••• `� -_'+ .'.• ., �. ..•i; fi •` + -.- .`. .�• \ r \ ` ` .. - -� 1 STY. HSF. • .��� ; .,♦.� .. •. ; . +..�,; . ;• +. ., .+ F.F.E.= 891.14 / �\ . +`•�.• . . , \ \ \\ _ ____ 886 _ I f ID .• a. C*1 xx G {� co \ �- \\ �m I OOL ELEVATION • \ / \ \\ \ \ \� EVATION m 8 / 882 x air i \ \ �� \ \� \\ \ \ = � \' .- -----' // --- -_ _ ._._._ ---- ___..._. _.__- -- —` � t • • � I I 74 .� ' `- _ .. " .� 580 _ __ , •f • I gig -,.' 879 - -- - \ \ .T / /� i / \ �• i \ j \ �EtTCY / • t WOODS NE TO 8E AAIUS ED / \\ \ 10• WIDE �• %/ \ { AS NEED FOR CONTOUR1�iG J I � \ SPILLWAY (SEE ST-68) bib _ _ _ r BT1 — \ \ / .1.I L ION OJT AIN If r_ _. ._ _. -- - -ozf == =- �. G -- - - - - -- -- -- --- —� -- `- "L --� — c - -. "G_ -� -,. _.�.�� — — - '�°o- �_T•.i+o— may^-= __:_�' • + - -- ----�- `"� 882 000 000 ooa- \ _ _ _ '�_ �_� - -- -------- .____- - - - -o� $�U - - - - - - - _ :� 1 TEL. MANHOLE T H T R" E E T TC= 889.12 W u EROSI A CONTROL KEY PERMANENT SEED EROSION CONTROL 0 PERMANENT 771 (NAG C-15 §'_'_ Ex-, ................ ............... CONCRETE WASHOUT AREA i CTION ENTRANCE EC-33 ME. EC-28 ............... ............... ............... ............... ...............� ............... ................ SILT FENCE EC -2 EC -26 ❑ CURB INLET PROTECTION EC -8A O YARD INLET PROTECTION - CONSTRUCTION LIMITS EC -28 C ROCK CHECK DAM EC -16A r l RIP -RAP EROSION CONTROL NOTES- 1. SEE SHEET C100 FOR SOILS MAP AND SOIL CHARACTERISTICS. 2. SEE SHEET C403 -C404 FOR EROSION CONTROL DETAILS AND NOTES. 3. SILT FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION. 4. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. 5. STORM WATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FROM THIS PROJECT. 6. SEE EROSION CONTROL SPECIFICATIONS FOR ALL EROSION CONTROL MEASURES SCHEDULES AND SEQUENCES. 7. CONTRACTOR TO PROVIDE A STABLE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT CONDITION FROM THE CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC ROADS. 8. EROSION CONTROL MAINTENANCE - SITE TO BE INSPECTED AT LEAST ONCE A WEEK AND MAKE REPAIRS IMMEDIATELY AFTER PERIODS OF RAINFALL 9. 100 YEAR FLOODPLAIN, FLOODWAY FRINGE AND FLOODWAYS ARE NOT PRESENT. 10. CONTRACTOR TO PROVIDE THE COUNTY SOIL AND WATER CONSERVATION DISTRICT(S) WITH A NARRATIVE DESCRIBING THE CONSTRUCTION SEQUENCE, INCLUDING START DATES FOR EACH LAND DISTURBING ACTIVITY. 11. ALL SEEDING TO BE DONE By OWNER. COORDINATE REQUIRED SEEDING WITH OWNER. 12. CONTRACTOR SHALL SEQUENCE EARTHWORK TO MINIMIZE UNSTABAUZED AREAS. COORDINATE WITH OWNER TO STABALIZE AREAS AS THEY ARE COMPLETED. 13. NO TOPSOIL SHALL LEAVE THE SITE. 'HOLLY MOLEY ' SAYS CALL AT LEAST TWO FULL WORKING DAYS BEFORE YOU BIG IT S THE I AW CAUTION i SHOWN ON THIS PLAN ARE BASED UPON ABOVE I GROUND EVIDENCE (including, but not limited to, \ \ \\ _ ____ 886 _ I f ID .• a. C*1 xx G {� co \ �- \\ �m I OOL ELEVATION • \ / \ \\ \ \ \� EVATION m 8 / 882 x air i \ \ �� \ \� \\ \ \ = � \' .- -----' // --- -_ _ ._._._ ---- ___..._. _.__- -- —` � t • • � I I 74 .� ' `- _ .. " .� 580 _ __ , •f • I gig -,.' 879 - -- - \ \ .T / /� i / \ �• i \ j \ �EtTCY / • t WOODS NE TO 8E AAIUS ED / \\ \ 10• WIDE �• %/ \ { AS NEED FOR CONTOUR1�iG J I � \ SPILLWAY (SEE ST-68) bib _ _ _ r BT1 — \ \ / .1.I L ION OJT AIN If r_ _. ._ _. -- - -ozf == =- �. G -- - - - - -- -- -- --- —� -- `- "L --� — c - -. "G_ -� -,. _.�.�� — — - '�°o- �_T•.i+o— may^-= __:_�' • + - -- ----�- `"� 882 000 000 ooa- \ _ _ _ '�_ �_� - -- -------- .____- - - - -o� $�U - - - - - - - _ :� 1 TEL. MANHOLE T H T R" E E T TC= 889.12 W u EROSI A CONTROL KEY PERMANENT SEED EROSION CONTROL 0 PERMANENT 771 (NAG C-15 §'_'_ Ex-, ................ ............... CONCRETE WASHOUT AREA i CTION ENTRANCE EC-33 ME. EC-28 ............... ............... ............... ............... ...............� ............... ................ SILT FENCE EC -2 EC -26 ❑ CURB INLET PROTECTION EC -8A O YARD INLET PROTECTION - CONSTRUCTION LIMITS EC -28 C ROCK CHECK DAM EC -16A r l RIP -RAP EROSION CONTROL NOTES- 1. SEE SHEET C100 FOR SOILS MAP AND SOIL CHARACTERISTICS. 2. SEE SHEET C403 -C404 FOR EROSION CONTROL DETAILS AND NOTES. 3. SILT FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION. 4. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. 5. STORM WATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FROM THIS PROJECT. 6. SEE EROSION CONTROL SPECIFICATIONS FOR ALL EROSION CONTROL MEASURES SCHEDULES AND SEQUENCES. 7. CONTRACTOR TO PROVIDE A STABLE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT CONDITION FROM THE CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC ROADS. 8. EROSION CONTROL MAINTENANCE - SITE TO BE INSPECTED AT LEAST ONCE A WEEK AND MAKE REPAIRS IMMEDIATELY AFTER PERIODS OF RAINFALL 9. 100 YEAR FLOODPLAIN, FLOODWAY FRINGE AND FLOODWAYS ARE NOT PRESENT. 10. CONTRACTOR TO PROVIDE THE COUNTY SOIL AND WATER CONSERVATION DISTRICT(S) WITH A NARRATIVE DESCRIBING THE CONSTRUCTION SEQUENCE, INCLUDING START DATES FOR EACH LAND DISTURBING ACTIVITY. 11. ALL SEEDING TO BE DONE By OWNER. COORDINATE REQUIRED SEEDING WITH OWNER. 12. CONTRACTOR SHALL SEQUENCE EARTHWORK TO MINIMIZE UNSTABAUZED AREAS. COORDINATE WITH OWNER TO STABALIZE AREAS AS THEY ARE COMPLETED. 13. NO TOPSOIL SHALL LEAVE THE SITE. 'HOLLY MOLEY ' SAYS CALL AT LEAST TWO FULL WORKING DAYS BEFORE YOU BIG IT S THE I AW CAUTION 1:1 LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (including, but not limited to, * manholes, inlets, valves, and marks made upon the ground by others) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE 1 -800- 382 -5544 GROUND EVIDENCE WAS OBSERVED. THE EXACT CALL TOLL FREE 1 -800- 428 -5200 LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR FOR CALLS OUTSIDE OF INDIANA PRIOR TO ANY AND ALL CONSTRUCTION. 1:1 t I I I 3 I N w � 0 w W z W z w _ 60 z 0 O �L'S az�wa Z W z > U U Q _ O L,J L- w U) U) U J z z z Q �?aaa V' a U J J J U 00 O I N E Q O OQI� a M Q U - • - Qzx S - Q N Q LL a � JI, U_ O n r Na_ D Q c1 .0 I �<Qt c!) 00 LLI Z Q) P0 M 1 ,c cc W� Z cc O I- J w C 0 O '`L+ z o 0 co o Q z o z � oz 0 � -o J r-) w cc cc L0 Q '— W i U cc a- s Lo 00 1 O 57' U v w z 0 CL FlED BY: _ M.Ouj�_ WlEK M. PE10504920 E STATE OF Qz Drawn By MAW Checked By. CMW Quality Assurance: DAL Scale: 0 Scale: 1' = 50' Sheet C402 Dote 06-20 -05 Project Number 990433 -20610