HomeMy WebLinkAbout05050009.13IMPLEMENTATION AND MAINTENANCE PROCEDURE
PART 1 - EXECUTION
1.1 AT BEGINNING OF SITE WORK
A. Prior to general stripping topsoil and excavating, install silt fence where
indicated.
B. Construct erosion control devices where indicated on drawings during rough
grading as grading progresses.
C. Topsoil must be present to ensure growth.
D. Temporarily seed topsoil stockpiles, and areas disturbed by
construction.
1. Seeding times and rates:
a. May 15 to September 15; Annual Ryegrass at 40 lbs. acre.
b. August 15 to November 15; e (grain) or wheat at bushels /acre.
c. March 1 to May 15; Oats at b shels acre.
2. Fertilizer: Commercial analysis 1271.'2 %12 applied at a rate of 600# /acre.
a. Apply lime to raise PH to the level needed for species being
seeded.
b. Work fertilizer and lime into the soil to a depth of 2 -3 IN.
3. All Hydroseeding shall be in accordance with the preceding
requirements.
4. Reseed as required until good stand of grass is achieved.
1.2 DURING CONSTRUCTION PERIOD
A. Maintain rock dams, inlet barriers, concrete wash out areas, and silt fences, etc.
B. Inspect regularly especially after rainstorms.
C. Repair or replace damaged or missing items.
D. After rough grading sow temporary grass cover over exposed earth areas not
draining into a protected device.
E. Construct inlets as soon as possible.
1. Install silt fences, stone bags or silt /sediment barriers at each new
inlet, as necessary to control erosion.
F. Provide necessary swales and dikes to direct water towards a protected
device.
G. Do not disturb existing vegetation (grass and trees) outside limits of
construction.
H. Remove sediment from behind silt fences when sediment reaches one - fourth
fabric height.
I. Topsoil and fine grade slopes and swales, etc. Seed and mulch as soon as
possible in areas as they become ready.
1.3 NEAR COMPLETION OF CONSTRUCTION
A. Eliminate erosion control devices except inlet protection.
B. Grade to finished or existing grades.
C. Fine grade remaining earth areas disturbed by construction activities.
D. Topsoil must be a minimum of 4" to ensure growth.
F. Permanent seed: March 1 to May 15 and August 10 to October 15. (Dates
may vary at discretion of Landscape Architect depending on weather conditions.)
G. Soil Preparation.
1. Soil surface must be free of rocks, debris, and other foreign materials.
2. Soils must have proper moisture control to assure proper germination and growth.
3. Soil surface must be compacted to a depth of at least 6 inches.
4. Soil preparation depends on soil conditions at time of seeding. Various tools
may be necessary to achieve surface finish.
5. Surface of soil shall be level and large voids eliminated to applying fertilizer, lime and seed.
H. Applying fertilizer, lime and seed.
1. Work fertilizer and lime into soil to a depth of 2 - 3 inches.
2. Apply seed carefully and cover seed with 1/4 inch soil, apply seed carefully
and avoid covering seed more than 1/4 inch.
3. A ply mulch at rate of 2 tons per acre following seeding.
4. Water as necessary to ensure adequate moisture for germination and growth.
5. Reseed as necessary until a good stand of grass is achieved.
I. Products
1. Fertilizer: Commercial analysis 12/12/12 o equivalent applied at a rate of 600 pounds per acre.
2. Lime: Apply agricultural lime to raise PH o the level needed for species being seeded. Soil test
may be required to determine rate.
3. Swales /Slopes: Blended mixture of seed shall be applied at the rate of 110 pounJs per acre.
The mix shall consist of 40 pounds Mustang turf -type Tall Fescue, 30 pounds Banff or Wabash
Kentucky Bluegrass, 30
4. Graded areas adjacent to pavement: Blended mixture of seed shall be applied at a rate of 90
pounds per acre. The mixture shall consist of 35 pounds Mustang turf -type Tall Fescue, 30
pounds Fiesta Perennial
5. Apply mulch straw at rate of 2 tons per acres immediately after seed ing.
e straw must be even) distributed loosely over the entire area. Slabs'
of straw must be redistributed or it will kill young seedlings. On large open
areas the mulch must be secured to soil by a tack or mechanical means to prevent wind action
on mulch.
1.4 MAINTENANCE
A. Reseed all areas that don't take.
B. Apply a maintenance fertilizer ( *) within 6 months of acquiring a good stand of gross.
C. Avoid traffic on area until area is well protected and stable.
D. Water as necessary to ensure adequate growth and development.
*Maintenance fertilizer - apply 200 Ibs of 12 -12 -12 or equivalent.
Erosion and Sediment Control_ Sequence
1. Assign an on -site person trained in erosion control proceedures with the daily responsibility
and authority to ensure that erosion /sediment control practices are installed according to this
sequence schedule. 327 LAC 15 -5 requires that a Pollution Prevention Plan monitoring log
and permit information be posted at the project site.
2. Contact Indiana Underground Planned Protection Systems, Inc. ( "Holey Moley ") for
underground Utility locations. (1- 800 - 382 -5544)
3. Before opening up the site, first evaluate, mark and protect important trees and associated
root zones, uni ue areas to be preserved (i.e. wetlands), or existing vegetation suitable for use
as filter strips especially in perimeter areas).
4. Install sediment basins or traps around the perimeter of the site and diversions above the
site to direct water from undisturbed areas away from the sediment traps while conveying
sediment -laden runoff from disturbed areas to the traps.
5. Install an adequate and stable construction entrance / exit drive from the construction site
to keep mud and sediment off public roads. Dust shall be kept to a minimum by utilizing
sprinkling, Calcium Chloride, vegetative cover, spray on adhesives or other approved methods.
6. Install the main runoff conveyance system with inlet and outlet protection devices to convey
storm runoff through the site without creating gullies and to prevent damage to open channels.
Sides of Swales, mounds and ponds to be seeded and mulched upon completion. Temporary
seeding shall be required for all swales and disturbed areas that connot be final seeded within
• time period that will prevent slope erosion. For temporary seeding, the contractor shall utilize
• fast growing seed of either oats, annual rye grass, wheat or rye depending on time of year.
Disturbed areas shall be kept to a minimum at all times.
7. As soon as the storm drain system is functional, install drain inlet protections, which trap
sediment on -site in shallow pools while allowing high water flows to enter the system.
8. Once erosion and sediment control measures are in place, begin land clearing followed
immediately by grading. Do not leave large areas unprotected for more than 7 days.
9. As grading progresses, install additional traps, silt fences, slope drains, temporary
diversions, and other runoff control measures at appropriate locations to keep sediment
contained on -site.
10. Immediately after grading, apply surface stabilization practices on all graded areas, using
permanent measures in accordance with the erosion control plan. However, if weather delays
permanent stabilization, temporary seeding and /or mulching may be necessary as a stop -qap
measure. Also stabilize (using temporary seeding /mulching or other suitable means) any
disturbed area where active construction will not take place for 30 working days.
11. After construction and final grading, landscape and permanently stabilize all disturbed
sites, including borrow and disposal areas. Also remove temporary runoff control structures
and any unstable sediment around them, and vegetate those areas.
TENTATIVE SCHEDULE
*NOTE TO CONTRACTOR - SCHEDULE PROVIDED PER AGENCY REQUIREMENTS
MORE DETAILED SCHEDULE TO BE PROVIDED BY CONTRACTOR.
PRIOR TO CONSTRUCTION
CONSTRUCTION /STORMWATER POLLUTION PREVENTION PLAN
ASSESSMENT OF CONSTRUCTION PLAN ELEMENTS (SECTION A)
Al PLAN INDEX SHOWING LOCATIONS OF REQUIRED ITEMS
SEE CS
A3 NARRATIVE DESCRIBING PROJECT NATURE AND PURPOSE:
THIS PROPOSED DEVELOPMENT INCLUDES THE CONSTRUCTION OF COX HALL AND HOOVER ROAD
EXTENTION AS WELL AS MULTI -USE TRAILS. THE CONSTRUCTION SEQUENCING SHALL BE AS
SHOWN ON THE TABLE ON THIS SHEET. CONSTRUCTION SEQUENCE: (SEE SCHEDULE OF LAND
DISTURBING ACTIVITIES ON THIS SHEET.)
A4 VICINITY MAP SHOWING PROJECT LOCATION:
SEE SHEET CS
A5 LEGAL DESCRIPTION OF THE PROJECT SITE:
SEE COVER SHEET (CS) FOR LEGAL DESCRIPTION.
LATITUDE 39'5.7'35° N, LONGITUDE 86'11'32' W
A6 LOCATION OF ALL LOTS AND PROPOSED SITE IMPROVEMENTS:
SEE SHEETS C201 AND C501.
A7 HYDROLOGIC UNIT CODE:
05120201090060
WILLIAMS CREEK
AB NOTATION OF ANY STATE OR FEDERAL WATER QUALITY PERMITS:
NONE.
A9 SPECIFIC POINTS WHERE STORMWATER DISCHARGE WILL LEAVE THE SITE
THE STORMWATER WILL DISCHARGE FROM THE SITE VTO EXISTING COX HALL DETENTION POND
AND TO THE EXISTING BOX CULVERT UALONG HOOVER ROAD.
A10 LOCATION & NAME OF ALL WETLANDS LAKES & WATER COURSES ON AND ADJACENT TO THE SITE:
SEE SHEET C100
All IDENTIFY ALL RECEIVING WATERS:
RECEIVING WATER IS THE COX HALL DETENTION POND AND BOX CULVERT UNDER HOOVER ROAD.
Al2 IDENTIFICATION OF POTENTIAL DISCHARGE TO GROUNDWATER:
NONE.
A13 100 YEAR FLOODPLAINS FLOODWAYS AND FLOODWAY FRINGES:
NONE PER THE FLOOD INSURANCE RATE MAP 18057CO205F DATED FEBRUARY 19, 2003.
A14 PRE - CONSTRUCTION AND POST CONSTRUCTION ESTIMATE OF PEAK DISCHARGE:
DRAINAGE INFRASTRUCTURE HAS BEEN PREVIOUSLY INSTALLED AND APPROVED. NO CHANGE IN
DRAINAGE PATTERNS OR RUNOFF COEFFICIENTS, SO PRE DEVELOPED PEAK DISCHARGE EQUALS
POST DEVELOPED PEAK DISCHARGE.
A15 ADJACENT LAND _USE. INCLUDING UPSTREAM WATERSHED:
NORTH - RESIDENTIAL
SOUTH - RESIDENTIAL
EAST - RESIDENTIAL
WEST - RESIDENTIAL
A16 LOCATIONS AND APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS:
SEE SHEETS C401 AND C402.
A17 IDENTIFICATION OF
_XISTING VEGETATIVE COVER:
SEE SHEETS C101 AND C102.
A18 SOILS MAP INCLUDING DESCRIPTIONS AND LIMITATIONS
START DATE
DURATION (WEEKS)
Pre - construction actions
07 -20 -05
1
Construction access
07 -27 -05
1
Demolition
08 -01 -05
1
Clearing and Grubbing
08 -01 -05
1
Stripping Topsoil
08 -01 -05
1
Rough Grading
08 -01 -05
3
Surface Drainage Excavation
08 -01 -05
3
Utility Excavation
PLAN - CONSTRUCTION COMPONENT (SECTION B)
Storm Sewer
09 -01 -05
2
Pavement and Tail Installation
09 -01 -05
1
Finish Grading
09 -01 -05
1
Topsoil Replacement
10 -01 -05
1
Seeding
10 -01 -05
2
*NOTE TO CONTRACTOR - SCHEDULE PROVIDED PER AGENCY REQUIREMENTS
MORE DETAILED SCHEDULE TO BE PROVIDED BY CONTRACTOR.
PRIOR TO CONSTRUCTION
CONSTRUCTION /STORMWATER POLLUTION PREVENTION PLAN
ASSESSMENT OF CONSTRUCTION PLAN ELEMENTS (SECTION A)
Al PLAN INDEX SHOWING LOCATIONS OF REQUIRED ITEMS
SEE CS
A3 NARRATIVE DESCRIBING PROJECT NATURE AND PURPOSE:
THIS PROPOSED DEVELOPMENT INCLUDES THE CONSTRUCTION OF COX HALL AND HOOVER ROAD
EXTENTION AS WELL AS MULTI -USE TRAILS. THE CONSTRUCTION SEQUENCING SHALL BE AS
SHOWN ON THE TABLE ON THIS SHEET. CONSTRUCTION SEQUENCE: (SEE SCHEDULE OF LAND
DISTURBING ACTIVITIES ON THIS SHEET.)
A4 VICINITY MAP SHOWING PROJECT LOCATION:
SEE SHEET CS
A5 LEGAL DESCRIPTION OF THE PROJECT SITE:
SEE COVER SHEET (CS) FOR LEGAL DESCRIPTION.
LATITUDE 39'5.7'35° N, LONGITUDE 86'11'32' W
A6 LOCATION OF ALL LOTS AND PROPOSED SITE IMPROVEMENTS:
SEE SHEETS C201 AND C501.
A7 HYDROLOGIC UNIT CODE:
05120201090060
WILLIAMS CREEK
AB NOTATION OF ANY STATE OR FEDERAL WATER QUALITY PERMITS:
NONE.
A9 SPECIFIC POINTS WHERE STORMWATER DISCHARGE WILL LEAVE THE SITE
THE STORMWATER WILL DISCHARGE FROM THE SITE VTO EXISTING COX HALL DETENTION POND
AND TO THE EXISTING BOX CULVERT UALONG HOOVER ROAD.
A10 LOCATION & NAME OF ALL WETLANDS LAKES & WATER COURSES ON AND ADJACENT TO THE SITE:
SEE SHEET C100
All IDENTIFY ALL RECEIVING WATERS:
RECEIVING WATER IS THE COX HALL DETENTION POND AND BOX CULVERT UNDER HOOVER ROAD.
Al2 IDENTIFICATION OF POTENTIAL DISCHARGE TO GROUNDWATER:
NONE.
A13 100 YEAR FLOODPLAINS FLOODWAYS AND FLOODWAY FRINGES:
NONE PER THE FLOOD INSURANCE RATE MAP 18057CO205F DATED FEBRUARY 19, 2003.
A14 PRE - CONSTRUCTION AND POST CONSTRUCTION ESTIMATE OF PEAK DISCHARGE:
DRAINAGE INFRASTRUCTURE HAS BEEN PREVIOUSLY INSTALLED AND APPROVED. NO CHANGE IN
DRAINAGE PATTERNS OR RUNOFF COEFFICIENTS, SO PRE DEVELOPED PEAK DISCHARGE EQUALS
POST DEVELOPED PEAK DISCHARGE.
A15 ADJACENT LAND _USE. INCLUDING UPSTREAM WATERSHED:
NORTH - RESIDENTIAL
SOUTH - RESIDENTIAL
EAST - RESIDENTIAL
WEST - RESIDENTIAL
A16 LOCATIONS AND APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS:
SEE SHEETS C401 AND C402.
A17 IDENTIFICATION OF
_XISTING VEGETATIVE COVER:
SEE SHEETS C101 AND C102.
A18 SOILS MAP INCLUDING DESCRIPTIONS AND LIMITATIONS
0
SEE SHEET C100.
A19 LOCATION SIZE AND DIMENSIONS OF PROPOSED STORMWATER SYSTEMS:
SEE SHEET C201 AND C202.
A20 PLAN FOR ANY OFF -SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS
PROJECT:
N/A
A21 LOCATIONS OF PROPOSED SOIL STOCKPILES BORROW AND /OR DISPOSAL
AREAS
SEE SHEET C401 AND C402.
A22 EXISTING SITE TOPOGRAPHY AT AN INTERVAL APPROPRIATE TO SHOW DETAILED
DRAINAGE PATTERNS:
SEE SHEET C101 AND C102.
A23 PROPOSED FINAL TOPOGRAPHY AT AN INTERVAL APPROPRIATE TO SHOW DETAILED
DRAINAGE PATTERNS:
SEE SHEET C301 AND C302.
ASSESSMENT OF STORMWATER POLLUTION PREVENTION
PLAN - CONSTRUCTION COMPONENT (SECTION B)
B1 DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTION
ACTIVITIES:
POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION INCLUDE DISTURBED SOILS, STORED MATERIALS
AND FUELS, WASTE CONCRETE WASHOUT AND EQUIPMENT USED DURING CONSTRUCTION. EQUIPMENT
AND FUEL WILL BE STORED IN A CENTRAL LOCATION AND THE CONTRACTOR SHALL INSTITUTE
METHODS AND PROCEDURES TO PREVENT DISCHARGE OF POLLUTANTS.
OF EROSION AND SEDIMENT CONTROL SEQUENCES ON THIS SHEET.
3 STABLE CONSTRUCTION ENTRANCE LOCATIONS AND SPECIFICATIONS:
SEE SHEET C401 -C404.
B4 SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS:
SEE SHEET C401 -C404.
B5 SEDIMENT CONTROL MEASURES FOR CONCENTRATED FLOW AREAS:
SEE SHEET C401 -C404.
ASSESSMENT OF STORMWATER POLLUTION PREVENTION
PLAN - CONSTRUCTION COMPONENT (SECTION B) (CON'T)
B6 STORM SEWER INLET PROTECTION MEASURE LOCATIONS AND SPECIFICATIONS:
SEE SHEET C401 -C404.
B7 RUNOFF CONTROL MEASURES:
SEE SHEET C401 -C404
88 STORMWATER OUTLET PROTECTION SPECIFICATIONS:
N.A.
B9 GRADE STABILIZATION STRUCTURE LOCATIONS AND SPECIFICATIONS:
SEE SHEET C401 -C404.
BID LOCATION, DIMENSIONS, SPECIFICATIONS AND CONSTRUCTION DETAILS FOR EACH
STORMWATER QUALITY MEASURE:
SEE SHEET C401 -C404.
B11 TEMPORARY SURFACE STABILIZATION METHODS APPROPRIATE FOR EACH SEASON:
SEE SHEET C401 -C404 AND IMPLEMENTATION AND MAINTENANCE PROCEDURE ON THIS SHEET.
B12 PERMANENT SURFACE STABILIZATION SPECIFICATION
SEE SHEET C401 -C404 AND IMPLEMENTATION AND MAINTENANCE PROCEDURE ON THIS SHEET.
B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN:
POTENTIAL POLLUTANT MATERIALS DURING CONSTRUCTION INCLUDE CONCRETE WASH -OUT, OIL,
GASOLINE, FERTILIZERS, AND HERBICIDES. CONCRETE TRUCKS WILL BE CLEANED IN A DESIGNATED
AREA AND RUNOFF FROM THIS OPERATION WILL NOT BE ALLOWED TO ENTER THE STORM SEWER
SYSTEM. FUELS OIL AND GASOLINE CAN LEAK OR BE
SPILLED FROM TRUCKS AND CONSTRUCTION
EQUIPMENT. SPILLS AND LEAKS OF THESE MATERIALS ONTO NON -PAVED AREAS WILL BE SHOVELED
INTO CONTAINERS OR DUMPSTERS FOR DISPOSAL. FUELING TRUCKS WILL BE EQUIPPED WITH SPILL
PREVENTION KITS FDR SMALLER FUEL SPILLS THE BROWNSBURG FIRE DEPARTMENT WILL BE
NOTIFIED IMMEDIATELY FOR LARGER SPILLS OR LEAKS. MANUFACTURERS INSTRUCTIONS WILL BE
FOLL17WED WHEN USING OR APPLYING ALL FERTILIZERS, HERBICIDES, AND PESTICIDES. FOR
ADDITIONAL INFORMATION AND INSTRUCTIONS, REFER TO THE ADDITIONAL STORMWATER POLLUTION
PREVENTION MEASURES AS LISTED BELOW.
814 MONITORING AND MAINTENANCE GUIDELINES FOR EACH PROPOSED_ POLLUTION
PREVENTION MEASURE:
EACH PROPOSED POLLUTION PREVENTION MEASURE SHALL BE CHECKED AND INSPECTED AFTER EACH
1/2" RAINFALL EVENT TO ENSURE PROPER FUNCTIONING AND EFFECTIVE POLLUTION PREVENTION.
REFER TO MAINTENANCE GUIDELINES SHOWN FOR EACH EROSION CONTROL MEASURE - THIS SHEET.
B15 EROSION AND SEDIMENT CONTROL SPECIFICATIONS FOR INDIVIDUAL BUILDING LOTS:
N/A
ASSESSMENT OF STORMWATER !POLLUTION PREVENTION
POST - CONSTRUCTION COMPONENT (SECTION C)
C1 DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THE PROPOSED LAND USE:
POTENTIAL POLLUTANT SOURCES POST CONSTRUCTION INCLUDE FERTILIZERS, HERBICIDES, PESTICIDES
AND OTHER LAWN TREATMENT APPLICATIONS ALONG WITH ASSORTED FUELS, OILS AND LIQUIDS ASSOCIATED
WITH VEHICULAR TRAFFIC THROUGHOUT THE THEATRE FACILITY.
C2 SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION:
THE STORMWATER QUALITY MEASURE IMPLEMENTATION SHALL BE SUBSTANTIALLY COMPLETE UPON
COMPLETION OF THE CONSTRUCTION ACTIVITIES FOR THE STORM SEWER SYSTEM. FOLLOWING
CONSTRUCTION, ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED UNTIL ALL
PERMANENT MEASURES AND VEGETATION HAS BEEN ESTABLISHED AND CONSTRUCTION, INCLUDING
LANDSCAPING, IS COMPLETE.
INDIVIDUAL EROSION CONTROL MEASURES MAY BE REMOVED FROM INLET PROTECTION STATUS
FOLLOWING SEEDING AND AFTER SUFFICIENT VEGETATION HAS BEEN ESTABLISHED IN AN AREA TO
PREVENT SILT AND SOIL EROSION INTO THE STORM SEWER SYSTEM.
INSPECTION AND MAINTENANCE OF ALL COMMON AREAS, LANDSCAPE AREAS AND INFRASTRUCTURE
IMPROVEMENTS ARE THE RESPONSIBILITY OF THE DEVELOPER /OWNER OR LOCAL AGENCIES TAKING
JURISDICTION OVER THE INFRASTRUCTURE IMPROVEMENTS.
C3 DESCRIPTION OF PROPOSED POST CONSTRUCTION [ORMWATER QUALITY MEASURES:
POST CONSTRUCTION STORM WATER QUALITY MEASURES WILL CONSIST OF VEGETATIVE COVER ON
THE DISTURBED AREAS, THE VEGETATIVE COVER ARE INTENDED TO STABILIZE THE DISTURBED AREAS
AND TO SERVE AS A SEDIMENT TRAP FOR FINER PARTICLES WITHIN THE STORM SEWER SYSTEM.
C4 LOCATION. DIMENSIONS. SPECIFICATIONS. AND C014STRUCTION DETAILS OF EACH _STORMWATER
QUALITY MEASURE:
THE STORMWATER QUALITY MEASURES FOR POST '%STRUCTION ACTITIVES ARE INDICATED WITHIN
THESE CONSTRUCTION DOCUMENTS. REFER TO SHE77S C401 -C404 FOR EROSION CONTROL
MEASURES TO BE IMPLEMENTED WITHIN THE PROJECT SITE, AND SHEET C201 -C202 FOR STORM
SEWER IMPROVEMENTS INTENDED TO SERVE THE POST CONSTRUCTED AREA. DIMENSIONS,
SPECIFICATIONS AND CONSTRUCTION DETAILS FOR 'HL 4E STORMWATER QUALITY MEASURES ARE
INCLUDED WITHIN THE AFOREMENTIONED SERIES OF aINSTRUCTION DOCUMENTS.
BUILDING AND GROUNDS PERSONNEL WILL PROVIDE
CONSTRUCTION WATER QUALITY MEASURES. MAINTE
DESCRIBED BELOW.
ALL INLET CASTINGS WILL BE INSPECTED MONTHLY
TRASH AROUND OR OBSTRUCTING INLETS WILL BE 1
CATCH BASINS WILL BE INSPECTED MONTHLY AND t
DEBRIS, AND SEDIMENT WILL BE REMOVED TO ENS(
BASIN.
GRASS AREAS SURROUNDING INLETS WILL BE MAINT
AND DEBRIS WILL BE REMOVED FROM SEEDED At,'"
DAMAGE TO INLET CASTINGS, INLET STRUCTURES, S
BE REPAIRED AS SOON AS POSSIBLE.
NANCE ACTIVITIES FOR THE POST
ACTIVITIES WILL BE COMPLETED AS
AFTER EACH RAINFALL EVENT. DEBRIS AND
2 EACH RAINFALL EVENT. TRASH, STICKS,
PROPER PERFORMANCE OF THE CATCH
ON A REGULAR MOWING CYCLE. TRASH
D AREAS.
STRUCTURES, OR CATCH BASINS SHOULD
ADDITIONAL STORMWATER POLLUTION PREVENTION MEASURES
CRIPTION AND PUR
TO PREVENT OR REDUCE THE AMOUNT OF CONTAMINATION TO STORMWATER RESULTING FROM
VEHICLE AND EQUIPMENT MAINTENANCE BY MAINTAINING A "DRY AND CLEAN SITE". THE BEST
PRACTICE WOULD BE TO PERFORM MAINTENANCE ACTIVITIES AT AN OFFSITE FACILITY WHENEVER
POSSIBLE. IF THIS OPTION IS NOT FEASIBLE, THEN WORK SHOULD BE PERFORMED ONLY IN
DESIGNATED AREAS, WHILE PROVIDING ADEQUATE COVER FOR MATERIALS STORED OUTSIDE,
ROUTINELY CHECKING FOR LEAKS AND SPILLS, AND CONTAINING AND CLEANING UP ALL SPILLS
IMMEDIATELY,
UITABLE APPLICATIO
THESE PROCEDURES ARE APPLICABLE FOR ALL CONSTRUCTION PROJECTS WHERE AN ONSITE
STAGING YARD AREA IS NECESSARY FOR THE STORAGE AND MAINTENANCE OF HEAVY
CONSTRUCTION EQUIPMENT AND VEHICLES.
KN.
VEHICLE AND EQUIPMENT MAINTENANCE SHOULD ONLY BE PERFORMED ONSITE WHEN IT IS
IMPRACTICAL TO SEND THEM OFFSITE FOR MAINTENANCE AND REPAIR. TRANSPORTING VEHICLES
AND /EQUIPMENT OFFSITE SHOULD BE DONE ONLY AT THE STABILIZED CONSTRUCTION
ENTRANCE /EXIT. VEHICLE STORAGE AND EQUIPMENT MAINTENANCE PROVIDES FOR A
POTENTIALLY SIGNIFICANT SOURCE OF STORMWATER POLLUTION. ONSITE ACTIVITIES THAT CAN
CONTAMINATE STORMWATER INCLUDE GENERAL MAINTENANCE SUCH AS CHANGING OR
REPLACEMENT OF FLUIDS AND FILTERS, ENGINE REPAIR AND SERVICE, AND OUTDOOR
EQUIPMENT STORAGE OR PARKING (FROM SOURCES SUCH AS THE ENGINE, OIL, FUEL, OR
HYDRAULIC FLUID LEAKS).
IMPLEMENTATION
IF MAINTENANCE MUST OCCUR ONSITE, WORK SHOULD BE DONE ONLY IN DESIGNATED AREAS
LOCATED AWAY FROM DRAINAGE COURSES. DEDICATED MAINTENANCE AREAS SHOULD BE
PROTECTED FROM STORMWATER INFILTRATION AND RUNOFF. THE MAINTENANCE AREA SHOULD
BE LOCATED AT LEAST 50 FEET FROM DOWNSTREAM DRAINAGE FACILITIES, WATERWAYS, AND
FLOOD PLAINS.
STORE AN ADEQUATE AMOUNT OF SPILL CLEANUP MATERIALS ONSITE WHERE THEY CAN BE
READILY ACCESSIBLE.
DRIP PANS OR ABSORBENT PADS SHOULD BE USED DURING VEHICLE AND EQUIPMENT
MAINTENANCE WORK THAT INVOLVES FLUIDS, UNLESS THE MAINTENANCE WORK IS PERFORMED
OVER AN IMPERMEABLE SURFACE WITHIN THE DEDICATED MAINTENANCE AREA
USE ABSORBENT MATERIALS ON SMALL SPILL AREAS. REMOVE THE CONTAMINATED ABSORBENT
MATERIALS PROMPTLY AND DISPOSE OF THEM PROPERLY.
ALL FUELING TRUCKS AND FUELING AREAS SHALL HAVE SPILL KITS AND /OR USE OTHER
ADEQUATE SPILL PROTECTION DEVICES.
INSPECT ONSITE VEHICLES AND EQUIPMENT DAILY AT THE BEGINNING OF EACH DAY FOR LEAKS
AND REPAIR IMMEDIATELY.
KEEP VEHICLES AND EQUIPMENT CLEAN; DO NOT ALLOW EXCESSIVE BUILD -UP OF OIL, GREASE
OR SILT MATERIALS THAT MAY CONTAMINATE OTHER PORTIONS OF THE SITE.
EMPLOYEES AND SUBCONTRACTORS SHALL BE TRAINED IN PROPER MAINTENANCE AND SPILL
MEDIATION PROCEDURES.
PROPERLY DISPOSE OF USED OILS, FLUIDS, LUBRICANTS, AND SPILL CLEANUP MATERIALS PER
LOCAL AND STATE LAWS.
SEPARATE AND RECYCLE WASTES SUCH AS GREASES, USED OIL, HYDRAULIC FLUID, OIL
T BATTERIES, FILTERS, ANTIFREEZE, CLEANING SOLVENTS, TT S, AND TRANSMISSION FLUIDS. IF THESE
MATERIALS ARE STORED ONSITE, PROVIDE ADEQUATE SECONDARY CONTAINMENT AND COVERS.
DO NOT PLACE USED OIL IN AN UNAPPROVED DUMPSTER, POUR INTO A STORM DRAIN OR
WATERCOURSE, OR POUR ONTO THE GROUND.
DRIP PANS OR PLASTIC SHEETING SHOULD BE PLACED UNDER ALL VEHICLES AND EQUIPMENT
WATER BODIES
E
PLACED ON WATERWAY DOCKS, BARGES, OR OTHER STRUCTURES LOCATED OVE R W
WHEN THE VEHICLE OR EQUIPMENT IS ANTICIPATED TO BE IDLE FOR MORE THAN ONE HOUR.
DO NOT BURY OR BURN USED TIRES.
SOLID WASTE MANAGEMENT
TION AND PURPOS
SOLID WASTE MANAGEMENT PROCEDURES AND PRACTICES ARE DESIGNED TO PREVENT OR
REDUCE THE POTENTIAL FOR DISCHARGE OF POLLUTANTS TO STORMWATER FROM SOLID OR
CONSTRUCTION WASTE BY PROVIDING DESIGNATED WASTE COLLECTION AREAS AND CONTAINERS,
ENSURING REGULAR DISPOSAL, AND TRAINING OF EMPLOYEES AND SUBCONTRACTORS.
SUITABLE APPLICATIONS
THIS PRACTICE IS APPLICABLE FOR CONSTRUCTION SITES WHERE THE FOLLOWING WASTES ARE
GENERATED OR STORED:
SOLID WASTE GENERATED FROM DEMOLITION ACTIVITIES SUCH AS TREES OR SHRUBS,
DEMOLITION OF EXISTING STRUCTURES, AND NEW BUILDING CONSTRUCTION MATERIALS
INCLUDING CONCRETE, MASONRY, WOOD, METAL, GLASS, RUBBER, STYROFOAM, PAPER, PLASTIC,
PIPE, ELECTRICAL COMPONENTS, AND PACKAGING MATERIALS.
DOMESTIC WASTES INCLUDE: FOOD CONTAINERS, BEVERAGE CONTAINERS, COFFEE CUPS, PAPER
BAGS, PLASTIC WRAPPERS, STYROFOAM, AND CIGARETTES.
CONSTRUCTION WASTES INCLUDING BRICK, MORTAR, TIMBER, STEEL AND METAL SCRAPS, PIPE
AND ELECTRICAL CUTTINGS, NONHAZARDOUS EQUIPMENT PARTS, STYROFOAM AND OTHER
MATERIALS SEND TRANSPORT AND PACKAGE CONSTRUCTION MATERIALS.
IMPLEMENTATION
THE FOLLOWING STEPS WILL AID IN KEEPING THE SITE CLEAN AND REDUCE THE POTENTIAL
FOR STORMWATER POLLUTION:
SELECT A DESIGNATED WASTE COLLECTION AREA ONSITE THAT IS DOWNSTREAM FROM THE
STORMWATER COLLECTION SYSTEM AND AT LEAST 50 FEET AWAY FROM ALL WATERWAYS AND
FLOOD PLAINS.
INFORM THE TRASH- HAULING CONTRACTOR THAT ONLY WATERTIGHT DUMPSTERS FOR ONSITE
USE WILL BE ACCEPTED.
INSPECT DUMPSTERS WHEN THEY REACH THE SITE FOR LEAKS. REJECT ANY DUMPSTER THAT
IS NOT WATERTIGHT OR IS DEFECTIVE.
PROVIDE AN ADEQUATE NUMBER OF CONTAINERS WITH LIDS OR COVERS TO KEEP RAINWATER
OUT AND TO PREVENT LOSS OF MATERIALS DUE TO WINDY CONDITIONS.
ALLOW FOR ADDITIONAL DUMPSTERS OR MORE FREQUENT PICKUPS DURING THE DEMOLITION
PHASE OF CONSTRUCTION TO INSURE TRASH MATERIALS DO NOT GET STORED ON THE
GROUND.
HAVE SITE TRASH COLLECTED DAILY, DURING RAINY AND WINDY CONDITIONS IT MAY BE
NECESSARY TO COLLECT TRASH MORE THAN ONCE A DAY.
REMOVE SOLID WASTE MATERIALS PROMPTLY FROM THE SITE SINCE EROSION AND SEDIMENT
CONTROL MEASURES TEND TO COLLECT TRASH WHICH HINDERS THE EFFECTIVENESS OF THE
EROSION CONTROL MEASURES.
INSURE THAT TOXIC LIQUID WASTES SUCH AS USED OILS, SOLVENTS, AND PAINTS AND
CHEMICALS SUCH AS ACIDS, PESTICIDES, ADDITIVES, AND CURING COMPOUNDS ARE NOT
DISPOSED OF IN DUMPSTERS DESIGNATED FOR CONSTRUCTION DEBRIS BUT ARE PROPERLY
DISPOSED OF ACCORDING TO LOCAL AND STATE LAWS.
DO NOT WASH OUT DUMPSTERS ON THE CONSTRUCTION SITE. DUMPSTER CLEANING SHOULD
BE THE RESPONSIBILITY OF THE TRASH HAULING CONTRACTOR.
ARRANGE FOR REGULAR WASTE COLLECTION BEFORE DUMPSTERS OVERFLOW. DO NOT PILE
MATERIAL ABOVE THE DUMPSTER SIDE OR ALLOW MATERIAL TO DRAPE OVER THE SIDES.
IMMEDIATELY CLEAN UP DUMPSTER SHOULD A SPILL OCCUR.
MAKE SURE THAT CONSTRUCTION WASTE IS COLLECTED, REMOVED, AND DISPOSED OF IN A
TIMELY MANOR BY AN AUTHORIZED DISPOSAL CONTRACTOR.
I I I aJ9 W,au -ies\rur, I MAL)kk Nk,KIUu'.AkAt _f awy orzuuuuo 12 1 i s 1'M SL,yka
11
INSPECTION AND MAINTENANCE
INSPECT AND VERIFY THAT PRACTICES ARE IN PLACE PRIOR TO THE START OF EACH ASSOCIATED
ACTIVITY. WHILE ACTIVITIES ARE IN PROGRESS, INSPECT EACH PRACTICE WEEKLY TO VERIFY
CONTINUED IMPLEMENTATION.
KEEP ADEQUATE SUPPLIES OF SPILL CLEANUP MATERIALS ONSITE. INSURE THAT ALL EMPLOYEES
ARE AWARE OF MATERIAL STORAGE LOCATIONS AND ACCESS CAN BE OBTAINED TO THE
MATERIALS.
MAINTAIN FLUID WASTE CONTAINERS IN LEAK PROOF CONDITION. REMOVE AND REPLACE ANY
CONTAINERS FOUND TO BE DEFECTIVE.
VEHICLES AND EQUIPMENT SHOULD BE INSPECTED AT THE START OF EACH DAY. IMMEDIATELY
REPAIR ALL LEAKS. IT IS PREFERRED THAT THE PROBLEM VEHICLE OR EQUIPMENT BE REMOVED
FROM THE PROJECT SITE FOR REPAIRS TO MINIMIZE ONSITE IMPACTS.
INSPECT EQUIPMENT FOR DAMAGED HOSES AND LEAKY GASKETS DAILY. IMMEDIATELY REPAIR OR
REPLACE FAULTY COMPONENTS.
SCRIPTION AND PURPOSE
VEHICLE AND EQUIPMENT FUELING PROCEDURES AND PRACTICES ARE DESIGNED TO PREVENT
FUEL SPILLS OR LEAKS AND REDUCE OR ELIMINATE CONTAMINATION OF SOILS AND STORMWATER,
THIS CAN BE ACCOMPLISHED BY USING OFFSITE FACILITIES, FUELING IN DESIGNATED ONSITE
AREAS ONLY, ENCLOSING OR COVERING STORED MATERIAL, UTILIZING SPILL CONTROLS, AND
TRAINING EMPLOYEES AND SUBCONTRACTORS IN PROPER FUELING
PROCEDURES.
0
ONSITE VEHICLE AND EQUIPMENT FUELING SHOULD ONLY BE DONE WHEN IT IS NOT FEASIBLE TO
SEND VEHICLES AND EQUIPMENT OFFSITE FOR FUELING. VEHICLES AND EQUIPMENT ENTERING
AND EXITING THE SITE SHOULD ALWAYS BE DONE AT THE STABILIZED CONSTRUCTION
ENTRANCE /EXIT.
IMPLEMENTATION.
THE USE OF OFFSITE FUELING STATIONS IS ENCOURAGED WHENEVER FEASIBLE. THESE FACILITIES
FUELING AND SPILLS
ARE EQUIPPED TO HANDLE PROPERLY. PERFORMING THIS WORK OFFSITE
MAY BE MORE ECONOMICAL BY ELIMINATING THE NEED FOR A SEPARATE DESIGNATED FUELING
AREA AND CONTAINMENT MEASURES ONSITE.
DISCOURAGE EMPLOYEES FROM 'TOPPING -OFF" FUEL TANKS TO PREVENT UNNECESSARY SPILLS.
ABSORBENT SPILL CLEANUP MATERIALS AND SPILL KITS SHALL BE AVAILABLE IN ONSITE FUELING
AREAS AND ON MOBILE FUELING TRUCKS. PROPERLY DISPOSE OF USED MATERIALS AFTER USE.
ABSORBENT PADS OR DRIP PANS SHOULD BE USED DURING VEHICLE AND EQUIPMENT FUELING
UNLESS THE FUELING IS PERFORMED OVER AN IMPERVIOUS SURFACE WITHIN A DEDICATED
FUELING AREA.
ABSORBENT MATERIALS FOR SMALL SPILLS SHALL BE USED. DO NOT WASH OR BURY THE SPILL
MATERIAL AS THIS ONLY RESULTS IN ADDITIONAL REMEDIATION REQUIREMENTS. REMOVE THE
CONTAMINATED ABSORBENT MATERIALS PROMPTLY AND DISPOSE OF PROPERLY ACCORDING TO
LOCAL AND STATE LAWS.
AVOID FUELING OF CONSTRUCTION EQUIPMENT AT VARIOUS LOCATIONS AROUND THE SITE.
TRANSPORT THE VEHICLE OR EQUIPMENT TO DESIGNATED ONSITE FUELING AREAS WHERE
ADEQUATE PREVENTION AND SPILL CONTAINMENT MATERIALS ARE LOCATED.
EMPLOYEES AND SUBCONTRACTORS SHOULD BE TRAINED IN PROPER FUELING AND CLEANUP
PROCEDURES.
DEDICATED FUELING AREAS SHOULD BE PROTECTED FROM STORMWATER INFILTRATION AND
RUNOFF, AND SHOULD BE LOCATED AT LEAST 50 FT AWAY FROM DOWNSTREAM DRAINAGE
FACILITIES, WATERWAYS, AND FLOOD PLAINS. FUELING MUST BE PERFORMED IN A LEVEL AREA.
PROTECT FUELING AREAS WITH BERMS OR DIKES TO PREVENT INFILTRATION, RUNOFF, AND TO
CONTAIN SPILLS.
NOZZLES USED IN VEHICLE AND EQUIPMENT FUELING SHOULD BE EQUIPPED WITH AN AUTOMATIC
SHUTOFF TO CONTROL SPILLS AND DRIPS. FUELING OPERATIONS SHOULD BE MONITORED BY THE
FUELING OPERATOR AT ALL TIMES.
FEDERAL, STATE, AND LOCAL REQUIREMENTS SHOULD BE OBSERVED FOR ANY TEMPORARY ABOVE
GROUND STORAGE TANKS.
COLLECTION, STORAGE, AND DISPOSAL OF MATERIALS
LITTERING ON THE PROJECT SITE IS PROHIBITED.
TO PREVENT CLOGGING OF THE STORM DRAINAGE SYSTEM LITTER AND DEBRIS SHOULD BE
REMOVED FROM DRAINAGE GRATES, TRASH RACKS, AND DITCHES DAILY.
TRASH RECEPTACLES SHOULD BE PROVIDED IN THE CONSTRUCTION STAGING AREAS, FIELD
TRAILER AREAS, AND AREAS UTILIZED FOR LUNCH AND BREAK PERIODS.
DOMESTIC TRASH FROM WORK AREAS WITHIN THE CONSTRUCTION LIMITS OF THE SITE SHOULD
BE COLLECTED AND PLACED IN WATERTIGHT DUMPSTERS WEEKLY AT A MINIMUM. DOMESTIC
TRASH SHOULD BE COLLECTED FROM THE SITE REGARDLESS OF THE SOURCE. COLLECTED
UTTER AND DEBRIS SHOULD NOT BE PLACED IN OR NEXT TO THE STORMWATER DRAINAGE
SYSTEMS OR WATERWAYS.
DUMPSTERS OF SUFFICIENT SIZE AND QUANTITY SHOULD BE PROVIDED TO CONTAIN THE SOLID
WASTE GENERATED BY THE PROJECT.
DUMPSTERS SHOULD BE REMOVED FROM THE PROJECT SITE ONCE THEY BECOME FULL AND
THE CONTENTS DISPOSED OF BY THE TRASH HAULING CONTRACTOR.
CONSTRUCTION DEBRIS AND WASTE SHOULD BE REMOVED FROM THE SITE WEEKLY OR MORE
FREQUENTLY AS REQUIRED. THE CONTRACTOR SHOULD USE THEIR BEST JUDGEMENT IN
ANTICIPATING WHEN A DUMPSTER WILL BE FULL AND SCHEDULE A PICKUP IN ADVANCE OF
THE DUMPSTER BEING FULL TO PREVENT OVER TOPPING OF THE DUMPSTER OR PLACEMENT
OF EXCESS MATERIAL ON THE GROUND.
CONSTRUCTION MATERIAL VISIBLE TO THE PUBLIC SHOULD BE STORED OR STACKED IN AN
ORDERLY MANNER AWAY FROM THE STORM DRAINAGE SYSTEM, WATERWAYS, AND FLOOD PLAIN,
STORMWATER RUNOFF SHOULD BE DIVERTED FROM STORED SOLID WASTE THROUGH THE USE
OF BERMS, DIKES, OR OTHER TEMPORARY DIVERSION STRUCTURES OR THROUGH THE USE OF
MEASURES TO ELEVATE THE WASTE COLLECTION DUMPSTER.
SOLID WASTE STORAGE AREAS SHOULD NOT BE LOCATED IN AREAS PRONE TO FLOODING OR
PONDING AND SHOULD BE LOCATED AT LEAST 50 FT FROM STORM DRAINAGE SYSTEMS AND
WATERWAYS.
INSPECTION AND MAINTENANCE
INSPECT AND VERIFY THAT ACTIVITY -BASED PRACTICES ARE IN PLACE PRIOR TO THE START OF
CONSTRUCTION IN THAT AREA. INSPECT EACH PRACTICE WEEKLY TO VERIFY IMPLEMENTATION.
INSPECT CONSTRUCTION WASTE COLLECTION AREA REGULARLY TO INSURE ALL WASTE MATERIALS
ARE BEING DISPOSED OF PROPERLY.
ARRANGE FOR REGULAR WASTE COLLECTION WITH A TRASH HAULING CONTRACTOR.
CONCRETE AND MASONRY WASHO
THE FOLLOWING STEPS WILL HELP REDUCE STORMWATER POLLUTION FROM CONCRETE AND
MASONRY WASTES: DISCUSS THE CONCRETE MANAGEMENT TECHNIQUES DESCRIBED, SUCH AS
HANDLING OF CONCRETE WASTE AND WASHOUT AREAS WITH THE READY -MIX CONCRETE
SUPPLIER BEFORE ANY DELIVERIES ARE MADE. DISCUSS MASONRY WASTE MANAGEMENT
TECHNIQUES WITH THE MASONRY CONTRACTORS FOR THE CONTROL OF CEMENT MIXER
WASHOUT AREAS.
INCORPORATE REQUIREMENTS FOR CONCRETE AND MASONRY WASTE MANAGEMENT INTO
MATERIAL SUPPLIER AND SUBCONTRACTOR AGREEMENTS.
STORE DRY AND LIQUID MATERIALS IN A COVERED AREA AWAY FROM DRAINAGE AREAS.
PREVENT MASONRY SAND STOCKPILE FROM WASHING INTO STREETS, STORM DRAINAGE
SYSTEMS, AND WATERWAYS.
AVOID MIXING EXCESS AMOUNTS OF FRESH CONCRETE OR MORTAR.
PERFORM WASHOUT OF CONCRETE TRUCKS OFFSITE OR IN DESIGNATED AREAS ONLY
PERFORM MORTAR MIXER WASHOUT IN ONE DESIGNATED AREA FOR THE DURATION OF THE
PROJECT.
DO NOT WASH OUT CONCRETE TRUCKS OR MORTAR MIXERS INTO STORM DRAINS, OPEN
DITCHES, STREETS, OR WATERWAYS.
DO NOT ALLOW EXCESS CONCRETE OR MORTAR TO BE DUMPED ONSITE, EXCEPT IN
DESIGNATED AREAS.
FOR ONSITE WASHOUT AREAS:
- LOCATE WASHOUT AREA AT LEAST 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATERWAYS.
-DO NOT ALLOW RUNOFF TO LEAVE THE DESIGNATED AREA BY CONSTRUCTING A TEMPORARY
PIT OR BERMED AREA LARGE ENOUGH FOR LIQUID AND SOLID WASTE.
-WASH OUT WASTES INTO THE TEMPORARY PIT WHERE THE CONCRETE CAN SET, BE BROKEN
UP, AND BE DISPOSED OF PROPERLY.
-AVOID CREATING UNNECESSARY RUNOFF BY DRAINING WATER FROM THE WASHOUT AREA INTO
A BERMED, LEVEL AREA WHEN WASHING CONCRETE TO REMOVE FINE PARTICLES AND EXPOSE
THE AGGREGATE.
-DO NOT WASH SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE INTO THE STREET OR
STORM DRAIN SYSTEM. COLLECT AND RETURN SWEEPINGS TO AGGREGATE BASE STOCKPILE OR
DISPOSE OF PROPERLY.
0
w �
� w
w
Z
U Z
Li
z
o
it Li
�ZwZ�~
O CL
J
Q
W 0 O
(n u) U)
�5 °z °z°za�
-aaa
Q U
• • • • • • •
00
rn
o�
Ln I
N `- O
o � 00
Q ai
oar` a.
Z i
Qff)
Q�x�
= -Q a�
Q a
D
N d
r\ cD -
.- Q I o
Q
0 00 w
Z
OM
N
Ln
�
~
o
i
it-
M
C
8
W
"O
W
J C
u7
Q �
w d�-
>
t�
Zp coo
Z C
ZD Q
"D
=Q
10
U cc
� o z
Z CD
�+ LI)
O
C
Lr) 0�
u7
CC
U
Y O
W `-
td
a-
= c
t
[�
r-
co
ti
U
z
0
x
CL
/tIRTIRED BY:
N
.
PE10504920
••
C
•O STATE OF
ivv
Drawn By
MAW
Checked Ely: CMW
Quality Assurance: DAL
Scale:
0 Scale: 1' = 40'
Shed
C404
Date
06 -20 -05
Project Number
990433 -20610