Loading...
HomeMy WebLinkAboutC102SECTION 01340 - SHOP DRAWINGS AND SAMPLES 1. Submit all drawings, diagrams, illustrations, schedules, performance charts, Instructions, specifications and other project data illustrating portions of the work as required by the specification section. Such submittals, whether or not referred to as shop drawings herein specification prescribed. Unless otherwise note d in the sections, submit a minimum of five (5) sets of shop drawings to Engineer. Two (2) sets will be returned to Contractor unless otherwise requested. 2. Do not commence any portion of the work requiring a shop drawing or sample submittal until the submittal has been approved as prescribed herein. All such portions of the work shall be in accordance with approved shop drawings or samples. SECTION 02110 - SITE CLEARING 1. Scope of Work Clearing and grubbing shall consist of cutting, removal and satisfactory disposal of all trees, down timber, brush, projecting roots, stumps, rubbish, boulders, broken concrete, fencing (as designated), and other material on the project site within the construction limits. 2. All debris generated from the clearing operations stated in Item 1 shall be removed and legally disposed of off the project site; unless a "Bury -Pit ", approved by the Owner and Engineer in advance, can be utilized in an location where it shall not be beneath building areas and /or pavement areas and shall not be located in an area where any utility structures are located or where impoundment of surface drainage may occur. 3. Materials shall not be disposed of by burning unless approved by the local Fire Marshall and Owner, and all required permits are obtained by the Contractor. 4. Traffic: Conduct site clearing operations to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities. Do not close or obstruct streets, walks, or other occupied or used facilities without permission from the appropriate ovt,rnmental agency. 5. Protection of Existing Improvement: Provide protections necessary to prevent damage to existing improvements indicated to remain in place. a. Protect improvements on adjoining properties and on Owner's property. b. Restore damaged improvements to their original conditions, as acceptable to parties having jurisdiction. 6. Protection of Existing Trees and Vegetation: Protect existing trees and other vegetation indicated to remain in place, against unnecessary cutting, breaking or skinning of roots, skinning and bruising of bark, smothering of trees by stockpiling construction materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line. Provide temporary fencing or approved guarding methods to protect trees and vegetation to be left standing. SECTION 02210 - STRIPPING 1 No Subsurface Investigations or foundrtion Recommendations were prepared for this r)roject. The Owner and Contractor have decided to Rely on the soils and construction history of past projects in the area to determine earthwork design and construction. SECTION 02220 - EARTHWORK 1 Refer to Section 02210 - Stripping Zvi `N �� 15 TEA*F,O 17398 -0 STATE OF ON O � "W11111VIIII, m, A7 .v C C rn o n to W Q D Z Q CO Z O W Cr Z 0 0 V Z Z 40 I X s� W r r�rt UA �■ La LAm (fir 0 r V 2 LU illill '�" W: D W a� 0 N O Y 0- LL } Z 't to 3 N 11 L0 z o uj a (D ((D Co -°c M Y 0 L Q 0 Q Un CM C 12. Concrete: Plain concrete pavements shall be constructed SECTION 2715 - WATER LINE SPECIFICATIONS 14. Trenching: Lay all pipe in open trenches, except when SECTION 2730 - SANITARY SEWER CONSTRUCTION C LIJ 11111110 cr__ M 4J � in accordance with section 501 of INDOT, latest 1. See Sanitary Sewers for vertical and horizontal the local authority gives written permission for tunneling. Open the trench sufficiently ahead of pipe- A. Standard specifications of Clay Regional Waste revision. separations laying to reveal any obstructions. The width of the shall apply for all work materials. Pipe shall be y i J: CL Concrete shall be ready -mixed concrete and shall be a L trench shall be the outside pipe diameter plus nine (9) installed in accordance with Section 715. mix of proportioned fine and coarse aggregates with 2. All water lines shall be in accordance with the Standards inches each side for 12 inches above the pipe or 0.3 x Portland cement and water. Minimum cement content shall and Specifications of the Indiana Department of O.D., whichever is greater. Sheet and brace trench as B. Sanitary sewer pipe shall be PVC in accordance with be 6 bags per cubic yard of concrete and maximum water Environmental Management. Sterilization of water mains necessary to protect workmen and adjacent structures. ASTM D -3034 (S.D.R. 35) and ASTM 2321. PVC pipe content shall be 5.5 U.S. gallons per sack of cement, shall be In accordance with the Indiana Department of All trenching is to comply with Occupational safety and shall have grooved bell and gasket. The pipe shall including moisture in the aggregate. Slump for normal Environmental Management for procedures and time of Health Administration standards. Contractor shall be made of PVC plastic having a cell classification weight concrete shall be a maximum of 4 inches and a treatment. employ a Registered Professional Engineer to design trench safety systems for all trenches over twenty (20; of 12454B. minimum of 2 inches. The slump of machine placed concrete shall be no less than 1 -1/4 inches nor more 3. Pressure tests for the water system shall be done in feet in depth. Keep trenches free from water while C. PVC sewer fittings shall conform to the requirements than 3 inches. Standard test ASTM C -143 shall be used accordance with manufacturer's recommendations. construction is in progress. Under no circums`ances lay of ASTM D- 3034 -89 specifications. Fittings in to measure slump. Compressive strength of concrete at pipe or appurtenances in standing water. Corduct the sizes through 8" shall be molded in one piece with 28 days shall be 4000 psi. All exterior concrete shall 4. Granular backfill shall be required for entire trench if discharge from trench dewatering to drains or natural elastomeric joints and minimum socket depths as have air entrainment of 5% to 8% by volume per ASTM C- any portion of trench is within 5 feet from edge of drainage channels. specified in Sections 6.2 and 7.3.2. Fittings 10" and larger shall be molded or fabricated in 260. pavement. 15. All pipes on steep slopes (over 20 %) shall have concrete accordance with manufacturers standard pipe bells Retempering of delivered concrete will not be allowed. 5. All water lines shall be installed in accordance with the anchors at maximum 40 feet intervals as shown on detail. and gaskets. Wall thickness of fittings shalt be Concrete shall be composed of: Indianapolis Water Company Specifications. All pipe to be PVC C -900 with PVC fittings conforming to IWC 16. Backfilling: For a depth of at least 12 inches above the SDR 26 as defined in Section 7.4.1 of the specifications. Gaskets for elastomeric joints A. Portland Cement: Conforming to ASTM C -150, Type specifications top of the pipe, backfill with earth or granular shall be molded with a minimum cross - sectional area IA or Type IIIA. material free from large stones, rock fragments, roots, of 0.20 square inches and conform to ASTM F -477 or sod. Tamp this backfill thoroughly, taking care not specification. Fittings shall be manufactured by B. Aggregates: Conforming to ASTM C -33. to disturb the pipe. For the remaining trench depth, Harco or equal. backfill with earth or granular material which may C. Water: Shall be clear and free from injurious contain stones or rocks not larger than four (4) inches. D. All sanitary manholes shall be "precast concrete" amounts of oils, acids, alkalies, organic SECTION 02720 -STORM SEWERS Backfill under walks, parking areas, driveways, and manholes in accordance with ASTM C -478 and Section materials or other deleterious substances. 1. Scope of Work: The work under this section includes all streets shall be granular material of ly and shall be thoroughly compacted by approved methods to the density 720. O -Rings shall conform to C -443. Kent Seal or equivalent shall also be applied to all joints and 13. Welded Steel Wire F=abric: Where required for concrete reinforcement shall conform to ASTM A185. storm sewers, storm sewer inlets, and related items specified. Trenches parallel with and within five (5) between riser rings and castings. Manhole step including excavating and backfilling, necessary to feet of paved roadways shall be constructed the same. spacing shall be no more than 16 inches. SECTION 02510 - STREETS AND PARKING LOTS 14. Premoulded Joint Filler: Shall be of non - extruding type complete the work shown on the Plans. All granular backfill shall be compacted to 95% Standard 1. Scope of Work: The work required under this section meeting ASTM D -544, except that premoulded joint filler used in concrete walk construction may be either non- 2. Standard Specifications of the City of Carmel and Proctor maximum dry density. E. Butyl rubber coating shall be applied around each manhole joint from 6 inches above to 6 inches below Includes all concrete and bituminous paving and related extruding or resilient. Indiana Department of Transportation Standard 17. Manhole Inverts: Construct manhole flow channels of each joint. The appropriate primer shall be Items necessary to complete the work Indicated on Plans Specifications ( INDOT), latest edition, shall apply for concrete, sewer pipe or brick, smoothly finished and of applied prior to applying the rubber coating. and described In the Specifications, Including but not 15. Placing Concrete: all work and materials. semicircular section conforming to the inside diameter Inside joints to be filled with precoat plug limited to: of the connecting sewers. Make changes in size or grade material. All streets, parking areas in Contract limits A. Subgrade: Place concrete only on a moist, Pipe shall be installed in accordance with Section 715 gradually and changes in direction by true curves. Curbs and Gutters compacted subgrade or base free from loose of INDOT. All trench excavations deeper than five (5) Provide such channels for all connecting sewers at each F. The casting elevations are set by plan. However, Sidewalks material. Place no concrete on a muddy or feet are covered by OSHA Standard 29CIR 1926 Subpart P. manhole. the castings are to be adjusted in the field by the Signs, concrete slabs and exterior steps - frozen subgrade. Refer to SECTION 02220 - 3A . All storm sewer pipe shall be reinforced concrete pipe Engineer's representative, should a discrepancy 9 P P occur between plan grade and existing grade. New 2. Construction within Right -of -Way: All street EARTHWORK and requirements pertaining to subgrade described within this Section. conforming to ASTM Designation C -76 Class III, unless manhole ring and cover shall be installed to construction within the lines of dedicated right -of -way otherwise noted, in accordance with Section 906 of establish grade. Maximum height of adjusting rings shall be in accordance with the requirements of the B. Forms: All forms shall be free from warp, tight INDOT. Joints shall conform to ASTM C -433, latest shall be 12 inches. Indiana Department of Transportation ( INDOT), latest revision, and the Hamilton County Highway Department. enough to prevent leakage and substantial enough to maintain their shape and position revision. G. Backfill around all structures and al cuts under without springing or settling when concrete is B B. Alternate pipe material may be (aluminum coated) steel, paved areas with granular material. Trenches 3. Grading: erform an necessary grading to that 9� Y Y 9 9 placed. Forms shall be clean and smooth Type II material conforming to the current AASHTO M36 opening within 5 feet of paved roadways shall be P 9 P y accomplished in accordance with SECTION 02220 - EARTHWORK, to bring subgrades, after final compaction, immediately before placing concrete. for pipe 18 inches and smaller with a helical corrugation of 2 -2/3" x 1/2" and AASHTO M196 for pipe 21 backfilled with granular material in accordance with Section 211. Backfill under sidewalks shall to the required grades and cross - sections for site q 9 C. Placing Concrete: Concrete shall be deposited inches and larger with a helical HyFlo corrugation of ". be granular, unless the walks are constructed a 9 improvement. so as to require as little rehandling as 3/4" x 3/4" x 7 -1/2 minimum of 6 months after backfill has been in 4 Preparation of Subgrade: Refer to Section 02210 - Stripping practicable. When concrete is to be placed at an atmospheric temperature of 35 degrees F. or All pipe shall meet the following minimum gages place. less, section 702.10 of INDOT, latest edition unless specified otherwise: H. The Contractor shall be responsible for verifying shall be followed. that all state highway, cif and count 9 Y. Y. Y permits 12 inch through 36 inch shall be 16 gage have been obtained by the developer prior to start D. Curing Concrete: Except as otherwise specified, 42 inch through 48 inch shall be 14 gage of construction. cure all concrete by one of the methods 54 inch through 84 inch shall be 12 gage 5 Compaction of Subgrade: Refer to Section 02210-Stripping p g PP 9 described in section 501.17 of INDOT, latest edition. All sewers shall be installed so as not to exceed the I. The Contractor shall be required to furnish the developer's Engineer with a set of print$, marked maximum allowable pipe strength per ASTM and in red pencil, showing actual sewer location and 16. Concrete Curb and Gutter: shall conform to requirements manufacturer's requirements. If additional pipe strength is required for the probable earth live load invert, to include lateral location, depth and length. Such "as- built" prints must be received by set forth in Section 605 of INDOT, latest edition. condition, the Contractor shall use a higher strength or the Engineer before the final contract payment can A. Expansion Joints: Shall be 1/2 in thick bedding method to satisfy the conditions. be authorized. The sanitary sewer laterals and premoulded at ends of all returns and at a C. Where shown on plan, use high density Polyethylene stubs termination shall be indicated on the surface with a metal fence post set immediately above said 6. Acceptance of Subgrade: The Earthwork Contractor shall maximum spacing of 100 feet. (HDPE) Corrugated pipe with smooth interior (N = 0.012). termination point. coordinate the preparation of subgrade with the appropriate governmental agency (General Contractor), B. Contraction Joints: Unless otherwise provided, contraction joints shall be sawed joints spaced Pipe and fittings which meet or exceed the requirements of Type III, Category 4 or 5, Grade P33 or P34, Class C J. All sanitary sewer lines upon completion will be the Owner, and the Paving Contractor. Subgrade shall be 20 feet on center, bedding per ASTM D1248. Joints shall be split required to pass an infiltration weir test and a inspected and tested by the General Contractor prior to corrugated couplings at least 7 corrugations wide and low pressure air test, unless otherwise directed by pavement construction. The condition of the subgrade as C. Finish: Tamp and screed concrete as soon as exceeding the soil tightness requirements of AASHTO the Engineer. Said test shall be conducted 9 finally and acceptably prepared shall prevail at the placed, and fill any honeycombed voids. Finish standard specifications for Highway Bridges, Section 23 according to NCPI Standard Method, and shall be time any paving material is placed thereon. square corners to 1/4 inch radius and other (2.23.3). Backfill and installation shall comply with witnessed by an Engineer and a representative of corners to radii shown. manufacturer's recommendations. Cla y Regional ional Waste. Prepared subgrade damaged for any reason prior to acceptance by the General Contractor and Paving D. Curing: Concrete curbs shall be cured with 4. Subdrainage system shall be installed as shown on Plans K. Deflection test shall be performed on all flexible' Contractor shall be repaired by the Earthwork Contractor white membrane compound according to section and be of pipes designated in Section 906 of INDOT as pipe after the final backfill has been place at at no additional cost to Owner. Approved subgrade shall be paved with the Initial H.A.C. base course one day 501.17(e) of INDOT, latest edition. follows: Pipes to be installed for subsurface drainage only may be least 30 days. No pipe shall exceed a vertical deflection of 5 percent deflection test results. after acceptance by the Street Inspector. Approved 17. Concrete Walks and Exterior Steps: shall conform to one of the following: The deflection test shall be performed with a nine - subgrade damaged for any reason after acceptance by the section 604 of INDOT, latest revision. point mandrel. Proving rings shall be available. General Contractor and the Paving Contractor shall be A. Perforated corrugated drainage pipe in repaired b the Paving Contractor at no additional cost P Y 9 A. Slopes: Provide 1/4 inch per foot minimum cross accordance with AASHTO M252 or AASHTO M294. 'The following are considered non - flexible pipes: ( 9 P P to Owner. slope. Make adjustments in slopes at walk PVC shall have minimum cell classification concrete pipe, ductile iron pipe and cast iron pipe.) P P P P P ) intersections as necessary to provide proper conforming to requirement of 12454 -C ASTM D- Should the Paving ontractor refuse acceptance of the Should 9 P drainage. 1784' L. All mandrel testing shall observed by a subgrade, he shall notify the Earthwork Contractor and Professional Engineer for certification and a the Owner of the deficiencies. Should the Paving B. Dimensions: Walks and steps shall be one course B. Concrete drain tile in accordance with AASHTO representative of Clay Regional Waste. Contractor fall to notify the Earthwork Contractor and construction and of widths and details shown on M178. the Owner of any deficiencies and /or proceed In the the plans. M. The ends of lateral are to be plugged tight with a placing of the H.A.C. base course, said actions shall C. Vitrified clay tile in accordance with AASHTO braced plastic disc or cap capable of withstanding constitute acceptance of subgrade. C. Finish: Screed concrete and trowel with a steel M179. a low pressure air test without leakage. The Owner shall have the authority to adjust the trowel to a hard dense surface after surface water has disappeared. Apply medium broom Where pipe is to be used for a collector of other P P N. Bedding for flexible pipe shall be No. 8 crushed construction schedules of the Earthwork Contractor and finish and scribe control joints at 8 foot subsurface laterals and /or sump pumps and installed with e stone from 6- inches below the pipe to 12- inches the Paving Contractor as is required to meet the above spacing. Provide 1/2 inch expansion joints provisions for cleaning, it may be one of the following: above the pipe. Bedding for rigid pipe shall requirements. where sidewalks intersect, and at a maximum A. ABS or PVC composite in accordance with ASTM D- No. 8 crushed stone from 6 inches below the pipe to the spring line of the pipe and from this point 7. Utility Structures: Earthwork Contractor shall check for spacing of 15 feet between expansion joints. 2680. inches above shall fill sand or equivalent. correct elevation of all manhole covers, valve boxes, and similar structures located within areas to be paved, D. Wheel chair ramps shall be provided as detailed. B. PVC in accordance with ASTM D -3034 SDR -35. Manholes shall be placed on no less than 6 inches M of No. 8 crushed stone bedding. and make, or have made, any necessary adjustments in structures. Paving Contractor shall verify the above 18. Street and Other Signs: Street name and other signs shall be furnished at the Developer's expense and C. PVC corrugated with smooth interior in O. Water and sewer line crossings and separations shalt prior to placing pavement materials. Adjustments to installed prior to the release of the performance bond. accordance with ASTM F949 . be in accordance with Ten States' Standards. utility structures required after placement of paving materials shall be the responsibility of Paving P Y 9 The signs shall be installed on one post at each street intersection at an appropriate spot in the northeast 5. Backfill around all structures and cuts under paved areas P. Trench shall be opened sufficient) ahead of pipe P Y P P Contractor. corner wherever possible, and within five (5) feet of pavement edges with granular laying to reveal obstructions, and shall be material in accordance with Section 211 of INDOT. properly protected and /or barricaded when left 8. Bituminous Pavement: All materials and construction methods proposed for the construction of bituminous 6. See standard detail sheet for construction dimensions of unattended. pavements shall comply with section 403 of INDOT, per storm structures. Manholes, inlets and catch basins Cl. No water shall permitted to flow into the latest revision. The front face of curbs shall be tack SECTION 02710 - UTILITIES shall be in accordance with Section 720 of INDOT. system sanitary sewer system during construction. coated where H.A.0 pavement will be In contact. Unless Precast concrete and steel for manholes and inlets shall Contractor shall utilize a pump to keep water level specific approval Is ranted, paving will not be P PP 9 P 9 1. Utilities: It shall be the responsibility of each be in accordance with ASTM C -478, latest revision. below the pipe. Pump discharge shall be directed P�P P 9 permitted during unfavorable weather or when the Contractor to verify all existing utilities and Steps shall be ductile iron or aluminum integrally cast to a storm outlet. Any pipe entering existing temperature Is 40 degrees F. and falling. conditions pertaining to his phase of work. It shall into each catch basin sidewalls. sewers shall be plugged, until such time as all also be the Contractor's responsibility to contact the tests on the sewers have been completed and the 9. Tack and Prime Coats: If the previously constructed owners of the various utilities before work is started. 7. The Contractor shall provide a minimum of one (1) foot of lines have passed all punch lists. course Is granular and a prime coat is required, priming The Contractor shall notify in writing the owners or the earth cover over all storm sewers. If pipe is to have shall conform with applicable provisions of section 408 Engineer of any changes, errors or omissions found on construction traffic over it, Contractor shall provide a R. All sewer laterals installed by the main line of INDOT, per latest revision. these plans or in the field before work is started or minimum temporary earth cover of four (4) feet, until Contractor shall be bedded the same as the main resumed. construction period is complete. After completion of line sewer. The tack coat on H.A.0 base or binder shall conform with operations requiring construction traffic over pipe, requirements set out In section 409 of INDOT, per latest q P 2. If active utilities are encountered that are not shown on Contractor shall remove the temporary earth cover and S. Forty -eight (48) hours notice shall be given to revision. the drawings, the Engineer and utility representative grade the earth to elevations shown on the Plans. Clay Regional Waste prior to the start of sewer shall be advised before work is continued. constriction. Also, 48 hours notice shall be given 10. Compacted Aggregate Base Course: shall conform with 8. Rip -rap particles shall be a minimum of 6" and a maximum prior to any testing done on the sewer. material and construction method requirements set out in 3. Inactive and abandoned utilities encountered in of 17" in size and shall be placed a minimum of 18" in section 303 of INDOT, per latest revision. The excavating and grading operations shall be reported to depth. Dimensions for rip -rap on this plan are for T. Manhole castings shall be stamped "SANITARY SEWER" thickness shown on the Plans Is the minimum thickness of the Engineer and utility company. The shall be 9� Y P Y• Y estimating purposes only. Actual best placement of rip- 9 P P Y• P P- (Neenah canting R 1842 or equal) and be self - the fully compacted aggregate base course. Compaction removed, plugged or capped as directed by the utility rap shall be determined by field conditions and shall be sealing type. Waterproof castings shall be Neenah shall be accomplished by rolling with a smooth wheeled company and Engineer. in accordance with Section 616 of INDOT. R- 1916 -F1 and stamped "Sanitary Sewer ". roller weighing 8 to 10 tons. 4. Rules and regulations governing the respective utilities 9. All drainage pipe and ditch outfalls to receiving streams U. The minimum slope for sewer acceptance are : Compact to 100 % of maximum dry density In accordance shall be observed in executing all work under this shall be constructed in accordance with drawings, with INDOT section 304.05, latest revision. Along section. subject however, to any modification required by Size of Pipe Minimum Constructed Slope curbs, headers, and walls and at all places not Engineer at the time of installation, and to any 8 -inch 0.4C% accessible to the roller, the aggregate material shall 5. Granular backfill shall be required for all crossings adjustments needed for field conditions not adequately a 10 -inch 0.289'0 be tamped with mechanical tampers or with approved hand P P PP under pavement areas except for utilities which are anticipated by the design drawings. 12 -inch 0.22% tampers. r o pushed under street. bored P 15 -inch 0.15% 10. Castings shall be as shown on detail sheet for 18 -inch 0.12% 11. Pavements built by stage construction, that Is pavements 6. Conduit shall be required for all crossings under manufacturer, type, and number. All castings shall be used to carry traffic before the full pavement structure pavement areas. Contractor shall coordinate with each Neenah or East Jordan approved equal. Castings shall be Is In place, will have each stage used by traffic respective utility for their location and installation. gray iron meeting ASTM A -48, latest revision. V. The Contractor shall provide measurements of the Inspected by the General Contractor for distressed areas Conduit shall be 4" PVC Schedule 40 or approved equal. slope of the sewer for each manhole section as before the next stage Is started. Distressed areas will 11. Install gaskets in accordance with manufacturer's construction progresses. Such measurements shall be repaired to the satisfaction of the General p 7. Existing storm sewers, sanitary sewers, water mains, gas recommendations for use of lubricants, cements, and be certified by a Registered Land Surveyor or Contractor before an additional stage Is constructed. mains, electric ducts, telephone ducts, steam mains and other special installation requirements. Engineer and be available on -site for okservation other underground structures have been shown on the by the District's Inspector. No more than three plans according to the best available information. The 12. Place plugs in ends of incomplete piping at and of work manhole sections can be constructed in advance of exact location and protection of these facilities and day or whenever work stops, and at stubs for future such measurements. structures, their support and maintenance in operation development. during construction (in cooperation with the proper W. In the event the Contractor does not meet the authorities of the utility involved), is the express 13. Carry depth of trenches for piping to establish indicated minimum slopes, the sewer sectio- and any other responsibility of the Contractor in the performance of flow lines and invert elevations. Notch under pipe affected sewer sections shall be rer.instructed to his Contract and in the preparation of his bid. bells where applicable to provide solid bearing for meet such minimum slopes. entire body of pipe. Zvi `N �� 15 TEA*F,O 17398 -0 STATE OF ON O � "W11111VIIII, m, A7 .v C C rn o n to W Q D Z Q CO Z O W Cr Z 0 0 V Z Z 40 I X s� W r r�rt UA �■ La LAm (fir 0 r V 2 LU illill '�" W: D W a� 0 N O Y 0- LL } Z 't to 3 N 11 L0 z o uj a (D ((D Co -°c M Y 0 L Q 0 Q Un CM C ai N a t.1J CD 00 LM C LIJ 11111110 cr__ M 4J � Cl- W CC W 2 CL _ r,, :D •� c n: - 1�. i IC 1 UA It: MAKLAI 1, '-'JL J a SCALE: N /P...# PROJECT" NO. 111 -12:2 SHEET NO. .- �- - - -� -' C 1186SPEC.DGIJ U N --J c-) _J 0 r) y M 4J � CC W 2 U _ r,, :D •� c n: - 0 LL CCJ -' u,. - :: y i J: CL L UA It: MAKLAI 1, '-'JL J a SCALE: N /P...# PROJECT" NO. 111 -12:2 SHEET NO. .- �- - - -� -' C 1186SPEC.DGIJ