Loading...
HomeMy WebLinkAboutA1.0.1GENERAL NOTES Courtyard I LLC COURTYARD BY MARRIOTT GENERAL REQUIREMENTS - DIVISION I: 13. QUESTIONABLE INFORMATION. R CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE LOCATED IN F. APPLICATION FOR PAYMENT AT SUBSTANTIAL COMPLETION SHALL 51BCC4002 Drawing File: FILENAME CONFINED AREAS APPROVED BY THE OWNER AND TRUCK TRAFFIC IS FOLLOW COMPLETION AND SUBMITTAL OF THE FOLLOWING: Checked By A. THE AIA CONTRACT, CONTRACTOR BID FORM, OR OTHER CONTRACT A. IF AT ANY TIME THE CONTRACTOR DOES NOT HAVE SUFFICIENT TO BE ROUTED TO AND FROM THE PROJECT SITE, AS COORDINATED OCCUPANCY PERMITS OR OTHER APPROVALS, WARRANTIES, DOCUMENTS, ARE BY REFERENCE MADE A PART OF THE CONTRACT INFORMATION TO PROCEED WITH THE WORK WITH ABSOLUTE WITH THE OWNER /LESSOR, SO AS NOT TO BURDEN THE BUILDING PROJECT RECORD DOCUMENTS, MAINTENANCE AGREEMENTS AND BETWEEN THE OWNER AND CONTRACTOR. CERTAINTY, OR IF THE INFORMATION PROVIDED TO CONTRACTOR IS OPERATIONS AND USERS. PARKING FOR THE CONTRACTOR'S INSTRUCTIONS, FINAL CLEANING, APPLICATION FOR REDUCTION OF SEEMINGLY VAGUE, UNCLEAR OR INCORRECT, THE CONTRACTOR HAS PERSONNEL SHALL BE LIMITED TO ONLY THOSE AREAS DESIGNATED RETAINAGE, INSURANCE COVERAGE INFORMATION, AND A LIST OF B. ALTERNATES: FULL RESPONSIBILITY TO IMMEDIATELY DIRECT SUCH QUESTIONS IN BY THE OWNER /LESSOR. THE OWNER /LESSOR SHALL HAVE THE INCOMPLETE WORK TO BE COMPLETED BY THE CONTRACTOR BY AN WRITING TO THE PROJECT MANAGER AND THE ARCHITECT FOR RIGHT TO ORDER ANY CONTRACTOR OR SUBCONTRACTOR WHO AGREED UPON DATE. APPLICATION FOR FINAL PAYMENT SHALL 1. THE REFERENCED SPECIFICATION SECTIONS CONTAIN THE PERTINENT CLARIFICATION BEFORE PROCEEDING WITH WORK. VIOLATES THE ABOVE REQUIREMENTS TO CEASE WORK AND TO FOLLOW COMPLETION AND SUBMITTAL OF THE FOLLOWING REQUIREMENTS FOR MATERIALS REQUIRED TO ACHIEVE THE WORK IMMEDIATEY REMOVE IT, ITS EQUIPMENT, AND ITS EMPLOYEES FROM INCOMPLETE WORK ITEMS, PROJECT CLOSEOUT REQUIREMENTS, PAID DESCRIBED HEREIN. B. DO NOT SCALE DRAWINGS± DIMENSIONS GOVERN. DRAWINGS THE PROJECT SITE. TAXES AND FEES, REMOVAL OF TEMPORARY FACILITIES, REMOVAL GOVERN OVER SPECIFICATIONS. LARGE SCALE SHALL GENERALLY OF SURPLUS MATERIALS AND TRASH, CHANGE OF DOOR LOCKS TO 2. FIELD CONDITIONS: EXAMINE EXISTING FIELD CONDITIONS, AND GOVERN OVER SMALL SCALE WORK. ITEMS NOT SHOWN ON THE 22. MATERIAL SUBSTITUTIONS: OWNER'S ACCESS, AND ASSURANCE THAT ANY UNSETTLED CLAIMS, COORDINATE PERTINENT RELATED WORK AND MODIFY SURROUNDING DRAWINGS OR SPECIFIED HEREIN, BUT REASONABLY INCIDENTAL TO INCOMPLETE WORK ITEMS, ETC. WILL BE RESOLVED WITHOUT DELAY. CONDITIONS AS REQUIRED TO COMPLETE THE PROJECT UNDER EACH THE INSTALLATION, AS REQUIRED BY APPLICABLE CODES, AS A. THE CONTRACTOR MAY USE AN ACCEPTABLE SUBSTITUTE PRODUCT ALTERNATE IN COMPLIANCE WITH THE CONTRACT DOCUMENTS AND PRACTICED BY THE TRADE, OR WHICH IS STIPULATED BY THE OR PROCESS WHICH FULFILLS THE REQUIREMENTS OF THE CONTRACT 34. REPORTS AND PHOTOGRAPHS: CURRENT CODE REQUIREMENTS. MANUFACTURER OF EQUIPMENT BEING INSTALLED OR CONNECTED, DOCUMENTS ONLY UPON WRITTEN ACCEPTANCE BY THE PROJECT SHALL BE FURNISHED AND INSTALLED WITHOUT ADDITIONAL MANAGER AND ARCHITECT IN ADVANCE. WHERE A SPECIFIC A. THE CONTRACTOR SHALL PREPARE MONTHLY PROGRESS REPORTS 3. SCHEDULE OF ALTERNATES: REFERENCE CONTRACT FORM EXPENSE_ PRODUCT IS NOT SPECIFIED, CONTRACTOR IS RESPONSIBLE TO INDICATING ACTUAL START AND COMPLETION TIMES FOR EACH MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND ACTIVITY CORRELATED TO SCHEDULE DATES. C. PROJECT NOTES: C. SHOULD ANY DISCREPANGIES OR AMBIGUITIES BE FOUND IN THE LOCAL GOVERNING AUTHORITIES. DRAWINGS, OR THESE SPECIFICATIONS, THE SAME SHALL AT ONCE 35. MODIFICATION PROCEDURES: 1. THE CONTRACT DOCUMENTS SHALL CONSIST OF THE "AGREEMENT" WHICH BE REPORTED TO THE PROJECT MANAGER AND ARCHITECT FOR B. SUBSTITUTIONS WILL NOT BE ACCEPTED WITH SUBSTANTIAL IMPACT IS A WRITTEN CONTRACT BETWEEN THE OWNER AND CONTRACTOR, THE CORRECTION, DURING THE BIDDING= PERIOD, OTHERWISE EXECUTE TO ADJACENT TRADES, OR REQUIRE SUBSTANTIAL REVISIONS TO THE A. MINOR CHANGES IN THE WORK: ARCHITECT'S SUPPLEMENTAL GENERAL CONDITIONS, THE CONTRACT DOCUMENTS (INCLUDING THE WORK AS DIRECTED BY THE OWNER OR PROJECT MANAGER, CONTRACT DOCUMENTS. INSTRUCTIONS (ASI) AUTHORIZING MINOR CHANGES IN THE WORK, NOT DRAWINGS AND SPECIFICATIONS), ALL ADDENDA, THERETO AND ALL PER THE ARCHITECT'S RECOMMENDATIONS. INVOLVING AN ADJUSTMENT TO THE CONTRACT SUM OR CONTRACT MODIFICATIONS INCORPORATED IN THE DOCUMENTS BEFORE THEIR C. THE CONTRACTOR IS TO DIRECT SUBSTITUTION REQUESTS TO THE TIME, WILL BE 155U €D BY THE PROJECT MANAGER OR ARCHITECT ON EXECUTION. IN THE CASE OF POSSIBLE CONFLICT OR AMBIGUITY WITH 14. LAYING OUT THE WORK: CONTRACTOR IS SOLELY RESPONSIBLE FOR PROJECT MANAGER IN WRITING USING THE EXAMPLE "RFI" FORM THE 'AIS' FORM SUPPLIED IN THE FRONT -END DOCUMENTS. ANY REFERENCED DOCUMENTS, THESE WRITTEN PROJECT PROPERLY LAYING OUT THE WORK, AND FOR ALL LINES, LEVELS, AND SUPPLIED IN THE PROJECT MANUAL. THE CONTRACTOR MUST SPECIFICATIONS GENERAL CONDITIONS, GENERAL REQUIREMENTS, AND MEASUREMENTS. CONTRACTOR SHALL VERIFY THE FIGURES SHOWN ON INDICATE THE REASON FOR SUBSTITUTION COMPLIANCE WITH B. OWNER- INITIATED REQUESTS FOR PROPOSALS (RFP) WILL BE ISSUED OTHER CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE_ THE DRAWINGS PRIOR TO COMMENCING THE WORK AND SHALL LAYOUT PERFORMANCE REQUIREMENTS, PRODUCT DATA, DRAWINGS OR BY THE PROJECT MANAGER OR ARCHITECT FOR CHANGES IN THE THE ACTUAL PARTITION LOCATIONS FOR REVIEW WITH THE ARCHITECT DESCRIPTIONS AS NEEDED TO DESCRIBE THE SUBSTITUTED WORK WHICH WILL REQUIRE ADJUSTMENT TO THE SCHEDULE OR 2. WORK UNDER OTHER CONTRACTS: HVAC RETROFIT, SECURITY EQUIPMENT, AND FURNITURE INSTALLER BEFORE STUD INSTALLATION BEGINS. THE PROUDUCT. INCLUDE ANY CHANGES IN COST OR EFFECT UPON THE CONTRACT SUM ON THE 'RFP' FORM SUPPLIED IN THE FRONT -END CARDKEY ACCESS EQUIPMENT, COMPUTER EQUIPMENT, FIRE ALARM CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ERRORS OR CONSTRUCTION SCHEDULE. DOCUMENTS. PROPOSAL REQUESTS ARE FOR INFORMATION ONLY, SYSTEM SHALL BE PERFORMED UNDER A SEPARATE CONTRACT WITH INACCURACIES RESULTING FROM HIS FAILURE TO DO SO. THE PROJECT AND ARE NOT INSTRUCTIONS TO STOP ONGOING WORK OR THE OWNER. THOSE OPERATIONS MAY BE CONDUCTED SIMULTANEOUSLY MANAGER OR THE ARCHITECT DOES NOT ASSUME RESPONSIBILITY FOR 23. CUTTING AND PATCHING: PATCH WITH DURABLE SEAMS THAT ARE INCORPORATE A CHANGE. WITH THE WORK UNDER CONTRACT. COOPERATE FULLY, AND LAYING OUT THE WORK. INVISIBLE, ELIMINATE EVIDENCE OF PATCHING. USE MATERIALS COORDINATE WITH THE SEPARATE CONTRACTOR TO ALLOW WORK IDENTICAL TO EXISTING MATERIALS. DO NOT CUT AND PATCH C. CONSTRUCTION CHANGE AUTHORIZATIONS (GCA) MUST BE ISSUED BY UNDER BOTH CONTRACTS TO BE CARRIED OUT WITHOUT INTERFERENCE 15. SUBMITTALS: SUBMIT SHOP DRAWING AND SAMPLE SUBMITTALS TO THE STRUCTURAL ELEMENTS, UNLESS NOTED IN THE CONTRACT DOCUMENTS. IF THE ARCHITECT OR THE PROJECT MANAGER OR ARCHITECT OR DELAY. ARCHITECT, ALLOWING A MINIMUM OF 14 DAYS FOR THE ARCHITECT'S CUTTING OF STRUCTURAL ELEMENTS IS ANTICIPATED, SUBMIT INSTRUCTING THE CONTRACTOR TO PROCEED WITH THE CHANGE IN REVIEW_ ALLOW TIME FOR RESUBMITTALS WHEN NECESSARY. EXTENSIONS ENGINEERED PROPOSAL FOR THE WORK TO THE PROJECT MANAGER WORK PRIOR TO ITS SCHEDULE AND COST IMPACTS BEING 3. THE ARCHITECT: ZIMMERMAN WEINTRAUB ASSOCIATES, LLC OF TIME WILL NOT BE GRANTED BECAUSE OF FAILURE TO FURNISH AND ARCHITECT FOR INFORMATION. ESTABLISHED ON THE 'CCA' FORM, WHICH IS SUPPLIED IN THE SUBMITTALS IN A TIMELY MANNER. FRONT -END DOCUMENTS. THE CONTRACTOR SHALL KEEP DETAILED 4. THE PROJECT MANAGER: BEGKER s FRONDORF 24. CLEANING AND PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR RECORDS, ON A TIME AND MATERIALS BASIS, OF THE WORK 1 &. SHOP DRAWINGS: MAINTAINING A CLEAN AND SAFE CONSTRUCTION AREA AT ALL TIMES. REQUIRED. THE CONTRACTOR SHALL SUBMIT AN ITEMIZED ACCOUNT, 5. THE INTERIOR DESIGNER: N/A REMOVE TRASH DAILY TO AN AREA COORDINATED WITH THE OWNER. IN ORDER TO SUSTANTIATE THE COST AND TIME ADJUSTMENT CLAIMS, A. SUBMISSION FOR ARCHITECT'S REVIEW INCLUDES DIMENSIONS, PROTECT THE WORK SO THAT IT WILL BE FREE OF DAMAGE AT FINAL PRIOR TO THE OWNER'S REVIEW AND APPROVAL OF A CHANGE (o. THE ENGINEER: N/A IDENTIFICATION OF PRODUCT AND MATERIAL USES, NOTATION OF ACCEPTANCE. BEFORE FINAL ACCEPTANCE, REMOVE CONSTRUCTION ORDER AND REVISIONS TO THE SCHEDULE AND CONTRACT SUM. COORDINATION REQUIREMENTS, NOTATION OF DIMENSIONS MATERIALS, TEMPORARY PROTECTION AND THOROUGHLY CLEAN THE 1. GENERAL INTENT: ESTABLISHED BY FIELD MEASUREMENTS. WORK TO BE READY FOR ITS INTENDED USE. D. CHANGE ORDER (CO) PROCEDURES: UPON THE PROJECT MANAGER'S APPROVAL OF A CHANGE ORDER PROPOSAL REQUEST, THE THESE NOTES, SPECIFICATIONS AND DRAWINGS SHOW THE GENERAL B. FURNISH ONE REPRODUCIBLE SEPIA AND TWO PRINTS FOR EACH 25. PERMITS: ARCHITECT WILL ISSUE A CHANGE ORDER FOR SIGNATURES OF THE EXTENT OF THE PROJECT, AND NOT NECESSARILY INDICATE OR ITEM REQUIRING SHOP DRAWINGS. FIVE COPIES OF PRODUCT DATA OWNER AND THE CONTRACTOR, ON THE 'CO' FORM PROVIDED BY DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND AND FIVE COPIES OF PRODUCT DATA AND TEST REPORTS. A. THE OWNER (SEE *2, GEN. NOTES, A -1.0) SHALL SECURE AND PAY FOR THE PROJECT MANAGER OR ARCHITECT IN THE FRONT -END COMPLETION OF THE REQUIREMENTS, NOR DO THEY SHOW ALL OF THE THE BUILDING PERMIT. THE CONTRACTOR SHALL SECURE ALL DOCUMENTS IN ACCORDANCE WITH THE GENERAL CONDITIONS OF THE CONDITIONS WHICH MAY BE ENCOUNTERED TO PROPERLY EXECUTE THE C. DO NOT USE SHOP DRAWINGS WITHOUT ARCHITECT'S STAMP OTHER PERMITS AND FEES, LICENSES AND INSPECTION NECESSARY CONTRACT. WORK, ON THE BASIS OF THE GENERAL DESIGN SCOPE INDICATED OR INDICATING ACTION TAKEN IN CONNECTION WITH CONSTRUCTION. FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL WORK ITEMS WARRANTIES: CONTRACTOR SHALL UNCONDITIONALLY WARRANTY REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE 17. SUBMITTAL REVIEWS: B. THE CONTRACTOR SHALL OBTAIN OCCUPANCY CERTIFICATES AS ALL SYSTEMS, EQUIPMENT, MATERIALS, AND WORKMANSHIP TO BE FREE WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE INTERMESHING OF REQUIRED BY THE GOVERNING AUTHORITIES. FROM DEFECTS FOR A PERIOD OF ONE YEAR AFTER THE DATE OF THE VARIOUS PARTS OF THE WORK SO THAT NO PART SHALL BE LEFT IN A. THE ARCHITECT WILL REVIEW AND TAKE APPROPRIATE ACTION UPON SUBSTANTIAL COMPLETION UNDER THIS CONTRACT. THE CONTRACTOR AN UNFINISHED OR INCOMPLETE CONDITION OWING TO ANY THE CONTACTOR'S SUBMITTALS SUCH AS SHOP DRAWINGS, PRODUCT 26. PROTECTION OF ADJACENT PROPERTIES: THE CONTRACTOR SHALL SHALL REPLACE OR REPAIR THE WORK WHICH MAY PROVE DEFECTIVE DISAGREEMENT BETWEEN THE VARIOUS SUBCONTRACTORS, OR THE DATA, AND SAMPLES, BUT ONLY FOR THE LIMITED PURPOSE OF PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL PROPERTIES OR NOT IN COMPLIANCE WITH THE DRAWINGS AND SPEGIFICATIONS SUBCONTRACTORS AND THE CONTRACTOR AS TO WHERE THE WORK OF CHECKING FOR GENERAL CONFORMANCE WITH INFORMATION GIVEN ADJACENT TO THE SITE AND THE EXISTING BUILDING. THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER AND WITHOUT INTERFERENCE ONE BEGINS AND ENDS WITH RELATION TO THE WORK OF ANOTHER. AND THE DESIGN CONCEPT EXPRESSED IN THE CONTRACT BEFORE COMMENCEMENT OF ANY PART OF THE WORK, SHALL GIVE ANY WITH THE OWNER'S OPERATIONS. THE CONTRACTOR SHALL SUBMIT THE DOCUMENTS. REVIEW OF SUCH SUBMITTALS IS NOT CONDUCTED FOR NOTICES REQUIRED TO BE GIVEN TO AN ADJOINING LAND, THE OWNER COMPLETED EXTENDED WARRANTY FORM ATTACHED IN THE PROJECT B. CONTRACTOR USE OF PREMISES: THE PURPOSE OF DETERMINING THE ACCURACY AND COMPLETENESS OR OTHER PARTY. THE REQUIREMENTS FOR 'CONTRACTOR USE OF MANUAL_ OF OTHER DETAILS SUCH AS DIMENSIONS AND QUANTITIES, OR TO PREMISES' SHALL APPLY TO ADJACENT PROPERTIES. A. CONFINE OPERATIONS TO AREAS PERMITTED BY LAW, ORDINANCES, SUBSTANTIATE INSTRUCTION FOR INSTALLATION OR PERFORMANCE CONTRACT GLOSEOUT: PERMITS, AND CONSTRUCTION DOCUMENTS AND WHICH SHALL NOT OF EQUIPMENT OF SYSTEMS, ALL OF WHICH REMAIN THE 2-1. EXECUTION: ALL WORK IS TO BE EXECUTED IN ACCORDANCE WITH THE UNREASONABLY ENCUMBER THE SITE WITH MATERIALS AND RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED BY THE MANUFACTURER'S PRINTED WRITTEN SPECIFICATIONS AND A. THE CONTRACTOR SHALL REMOVE ALL TRASH, WASTE MATERIALS, EQUIPMENT. DO NOT DISTURB AREAS BEYOND CONSTRUCTION CONTRACT DOCUMENTS. RECOMMENDATIONS, AND IN ACCORDANCE WITH THE HIGHEST INDUSTRY TEMPORARY PARTITIONS, ETC. THE CONTRACTOR IS RESPONSIBLE OPERATIONS, TAKE NECCESSARY PRECAUTIONS TO PROTEECT THE STANDARDS. FOR FINAL CLEANING OF THE PROJECT SITE, ALSO ADJACENT AREAS EXISTING BUILDING FROM DAMAGE DUE TO DEMOLITION AND B. THE ARCHITECT WILL TAKE RESPONSIVE ACTION TO THE FOLLOWING (CARPETS, WALLS, GLASS, ETC. SOILED DURING CONSTRUCTION) CONSTRUCTION OPERATIONS, AND THE CONTRACTOR SHALL REPAIR SUBMITTALS: PRODUCT DATA, MATERIALS LISTS, SHOP DRAWINGS, 28. UTILITY COORDINATION: ANY UTILITY SHUT -OFFS AS REQUIRED BY THE THROUGH THE DATE OF SUBSTANTIAL COMPLETION, AND AS OR REPLAGE, AT HIS COST, ELEMENTS WHICH ARE NOT SPECIFIED TO AND SAMPLES. THE ARCHITECT MAY NOT TAKE RESPONSIVE ACTION CONTRACTOR FOR COMPLETION OF THEIR WORK SUCH AS ELECTRICAL, REQUIRED BY LATER CONSTRUCTION. BE DEMOLISHED DURING THE PROJECT. TO THE FOLLOWING QUALITY CONTROL SUBMITTALS: DESIGN GAS, WATER, SEWER, STEAM, ETC. MUST BE SCHEDULED THROUGH THE DATA,TEST REPORTS, TEMPORARY WORK SUBMITTALS, AND OWNER AND PROJECT MANAGER PRIOR TO COMMENCING WITH THE WORK B. THE CONTRACTOR SHALL MAKE ADJUSTMENTS TO MECHANICAL AND B. THE BUILDING WILL BE OCCUPIED DURING THE PROJECT. THE SAFETY CERTIFICATES. AND SHALL HAVE PRIOR WRITTEN APPROVAL OF THE APPROPRIATE ELECTRICAL EQUIPMENT AS REQUIRED FOR THEIR PROPER OF THE OCCUPANTS AND PROPERTY SHALL BE MAINTAINED AT ALL PUBLIC UTILITIES AND AUTHORITIES. OPERATION. TIMES DURING THE PROJECT. ALL WORK SHALL BE DONE SO AS NOT C. THE ARCHITECT'S REVIEW ACTIONS SHALL BE AS NOTED BELOW: TO INTERFERE WITH ACCESS TO REQUIRED EXITS FOR ANY OCCUPIED 29. MISCELLANEOUS: THE CONTRACTOR SHALL PROTECT, CUT OFF, CAP, G. THE CONTRACTOR SHALL MAINTAIN A RECORD COPY OF DRAWINGS, PART OF THE BUILDING AND TO CAUSE THE LEAST POSSIBLE 1) 'A' ACTION: FABRICATION, MANUFACTURE, AND CONSTRUCTION AND /OR REPLACE AND RELOCATE EXISTING VACATED PIPES, DUCTS, SPECIFICATIONS, AND DOCUMENT REVISIONS MARKED -UP BY THE INTERFERENCE WITH THE OPERATIONS OF THE BUILDING AND ITS MAY PROCEED PROVIDING THE WORK IS IN COMPLIANCE WITH ELECTRICAL CONDUITS, ETC. WHICH INTERFERE WITH THE WORK, AS CONTRACTOR TO RECORD ACTUAL AS -BUILT CONDITIONS. THE 5ERVIGE5. NOISE AND DUST SHALL BE HELD TO A MINIMUM THE CONTRACT DOCUMENTS. APPLICABLE AND AS NECESSARY TO MAINTAIN THE EXISTING BUILDING CONTRACTOR SHALL ALSO MAINTAIN A RECORD OF PROJECT CONSISTENT WITH REASONABLE CONSTRUCTION METHODS. SYSTEMS IN A WORKABLE, FULLY FUNCTIONAL STATE. RECORD SHOP DRAWINGS, DATA SUBMITTALS, AND COMPLETE 2) B' ACTION: FABRICATION, MANUFACTURE, AND CONSTRUCTION MECHANICAL AND ELECTRICAL EQUIPMENT MAINTENANCE MANUALS IN G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE MAY PROCEED AS NOTED PROVIDING THE WORK IS IN 30. FINISH SURFACES: ALL FINISH SURFACES INCLUDING FACTORY - FINISHED HARD COVER BINDERS. THE CONTRACTOR SHALL CERTIFY BY WORK AROUND, AND TEMPORARY PROTECTION OF THE EXISTING COMPLIANCE WITH THE CONTRACT DOCUMENTS. AND JOB - FINISHED ITEMS SHALL BE CLEAN AND NOT MARRED UPON STAMP ON A REPRODUCIBLE OF THE RECORD DOCUMENTS, PAID IN -PLACE SERVICES. EXISTING EQUIPMENT AND SERVICES ENTERING DELIVERY TO THE BUILDING. THE CONTRACTOR SHALL, WITHOUT EXTRA FOR BY THE CONTRACTOR, THAT EACH OF THE REVISED SHEETS AND LEAVING THE BUILDING SHALL REMAIN INTACT, IN THEIR EXISTING 3) C' ACTION: NO WORK SHOWN ON THE SUBMITTAL MAY BE COMPENSATION, REPLACE ALL SUCH SURFACES WHERE SUCH SURFACES REPRESENTS A COMPLETE AND ACCURATE RECORD OF THE WORK LOCATIONS, UNDISTURBED DURING THE WORK. THE CONTRACTOR FABRICATED, MANUFACTURED OR CONSTRUCTED. PROVE TO HAVE BEEN INADEQUATELY PROTECTED, AND ARE AS EXECUTED. THE CONTRACTOR SHALL ALSO SUBMIT A COMPLETED SHALL COORDINATE WITH THE OWNER, AND PROVIDE ANY DAMAGED. STATEMENT OF APPLICATION FORM PROVIDED IN THE FRONT -END SUPPLEMENTAL SUPPORT, BRACING, AND RECONNECTION OF EXISTING 4) 'INFORMATION': RECEIPT OF A QUALITY CONTROL SUBMITTAL IS DOCUMENTS. PIPING, DUCTWORK, CONDUITS, ETC. NECESSARY TO MAINTAIN THE ACKNOWLEDGED. 31. PRECONSTRUCTION MEETING: PRIOR TO COMMENCEMENT OF THE WORK, EXISTING SYSTEMS IN GOOD WORKING ORDER. THE CONTRACTOR SHALL MEET WITH OWNER AND ARCHITECT TO D. PROVIDE OWNER WITH COMPLETE AS- GUILTS AND AUTOCAD FILES. 5) 'NOT REVIEWED': SUBMITTAL IS NOT PREPARED IN ACCORDANCE DISCUSS COORDINATION AND EXECUTION OF THE WORK, PROVIDING D. ANY WORK, WHICH WILL AFFECT BUILDING OPERATIONS AND WITH THE CONTRACT DOCUMENTS OR IS NOT A REQUIRED EVIDENCE OF THE FOLLOWING: SUBMITTALS FOR CONTRACT CLOSEOUT: IN ADDITION TO THE SERVICES, SHALL BE COORDINATED IN A MANNER SATISFACTORY TO SUBMITTAL. GENERAL WARRANTY OF THE WORK AND ADDITIONAL ITEMS REQUIRED THE PROPERTY MANAGER. PROVIDE NOT LESS THAN 12 HOURS A. THE SET OF APPROVED DOCUMENTS. BY THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS, PRIOR NOTICE TO THE PROPERTY MANAGER OF ACTIVITIES THAT WILL 18. SAMPLES: SUBMIT SAMPLES IDENTICAL TO PRODUCT PROPOSED FOR FURNISH THE FOLLOWING: AFFECT THE OPERATIONS OF THE FACILITY. ARCHITECTS REVIEW. FURNISH 3 SAMPLES EACH INCLUDING GENERIC B_ CONSTRUCTION SCHEDULE TO BE APPROVED BY THE OWNER AND DESCRIPTION, SOURCE, PRODUCT NAME OR MANUFACTURER PROJECT MANAGER A. THE FINAL WAIVER OF LIEN. E. THE OWNER, THE PROJECT MANAGER, AND THE ARCHITECT, AND THEIR COMPLIANCE, AVAILIBILTY AND DELIVERY TIME. REPRESENTATIVES SHALL HAVE COMPLETE, UNRESTRICTED ACCESS C. THE BUILDING PERMIT. B. THE WARRANTIES (OUTSTANDING). TO THE SITE DURING CONSTRUCTION. 19. CONTRACTOR'S CONSTRUCTION SCHEDULE: SUBMIT BAR -CHART TYPE CONSTRUCTION SCHEDULE WITHIN 14 DAYS PRIOR TO DATE D. THE CERTIFICATES OF INSURANCE (EACH TYPE REQUIRED). C. THE RECORD DOCUMENTS. F. THE GENERAL CONTRACTOR SHALL FOLLOW ALL BUILDING RULES ESTABLISHED FOR COMMENCEMENT OF THE WORK± ENCOMPASSING THE AND REGULATIONS FOR CONSTRUCTION. ENTIRE CONSTRUCTION PERIOD AS ESTABLISHED IN THE AGREEMENT. E. THE NOTIFICATION OF APPROPRIATE PUBLIC UTILITIES. D. OPERATING MAINTENANCE MANUALS. INDICATE DATE OF SUBSTANTIAL AND FINAL COMPLETION. UPDATE THE 9. FULL SET OF DRAWINGS: DRAWINGS ARE TO BE ISSUED TO THE SCHEDULE WEEKLY. F. THE SUBCONTRACTOR AND SUPPLIER LIST. E. THE CERTIFICATIONS. SUBCONTRACTORS IN COMPLETE SETS SO THAT THEY WILL KNOW THE OTHER DETAILS AFFECTING THEIR WORK. 20. SUBCONTRACTORS AND SUPPLIERS: THE CONTRACTOR SHALL SUBMIT, G. COMPLETION OF ANY REQUIRED ON-SITE PERSONNEL ORIENTATION F. THE CERTIFICATE OF OCCUPANCY. PRIOR TO COMMENCEMENT OF CONSTRUCTION, A SWORN STATEMENT MEETINGS. 10. VERIFICATION OF CONDITIONS: IDENTIFYING ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS TO BE UTILIZED ON THE PROJECT. 32. PROJECT MEETINGS: THE PROJECT MANAGER SHALL CONDUCT WEEKLY A. ALL EXISTING GONDITIONS SHALL BE VERIFIED IN THE FIELD BY THE MEETINGS AT A DATE AND TIME ACCEPTABLE TO OWNER AND THE CONTRACTOR. EACH BIDDER SHALL SCHEDULE A VISIT TO THE SITE 21_ TEMPORARY FACILITIES: ARCHITECT. THE PROJECT MANAGER SHALL PREPARE MINUTES AND AN OF THE PROPOSED WORK AND FULLY ACQUAINT AND FAMILIARIZE AGENDA RECORDING REVIEW OF JOB PROGRESS, RECOMMENDATIONS, HIMSELF /HERSELF WITH THE CONDITIONS AS THEY EXIST± A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING AND UNRESOLVED ISSUES, INCOMPLETE ITEMS, AND POTENTIAL PROBLEMS THOROUGHLY EXAMINING THE DOCUMENTS PREPARED BY THE PROVIDING GENERAL SERVICES AND TEMPORARY FACILITIES AS WHICH MAY AFFECT THE CONSTRUCTION, THE SCHEDULE, AND /OR THE ARCHITECT± INCLUDING OTHER PARTS OF THE PROPOSED CONTRACT SPECIFIED HEREIN AND AS REQUIRED FOR THE PROPER AND COST. DOCUMENTS AND FULLY UNDERSTAND THE CONDITIONS, D11~FICULTIES EXPEDITIOUS EXECUTION OF THE WORK± INCLUDING BUT NOT LIMITED AND RESTRICTIONS ATTENDING THE EXECUTION OF THE WORK. IT IS TO: TEMPORARY TOILET, TEMPORARY STORAGE, TEMPORARY 33, APPLICATIONS FOR PAYMENT: UNDERSTOOD THAT OMISSIONS FROM THE BID DUE TO FAILURE OF ELECTRICAL POWER AND LIGHTING, TEMPORARY MECHANICAL THE BIDDER TO FULLY ACQUAINT HIMSELF WITH THE SITE CONDITIONS VENTILATION, TEMPORARY ENCLOSURES, TEMPORARY PARTITIONS, A. THE CONTRACTOR SHALL PREPARE A DETAILED BREAKDOWN AND THE REQUIREMENTS OF THE DOCUMENTS WILL NOT ENTITLE THE TEMPORARY OPENINGS, TEMPORARY TELEPHONE. SCHEDULE OF VALUES, IN A LINE -ITEM TABULAR FORMAT INDICATING: BIDDER TO ADDITIONAL CONSIDERATION, COMPENSATION OR THE GENERIC TRADE NAME, NAME OF SUBCONTRACTOR, NAME OF EXTENSION OF TIME IF AWARDED THE CONTRACT. NO EXTRAS WILL B. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN REFUSE SUPPLIER, CHANGE ORDERS, DOLLAR VALUE, PERCENTAGE OF BE AUTHORIZED FOR WORK, WHICH IS REQUIRED TO COMPLETE THE CONTAINERS IN AN APPROPRIATE LOCATION ON THE SITE COMPLETION, AND ANY OTHER IDENTIFYING INFORMATION AS MAY PROJECT SCOPE AND INTENT DUE TO CONDITIONS THAT ARE ACCEPTABLE TO THE OWNER /LESSOR AND PROJECT MANAGER, FOR BE REQUIRED. READILY OBSERVABLE AT THE PROJECT SITE. DISPOSAL OF DEBRIS AND REFUSE DURING THE CONSTRUCTION PERIOD. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO B_ PROGRESS PAYMENTS SHALL BE ON A REGULAR AGREED UPON 11. QUALITY ASSURANCE, REMOVE THE CONSTRUCTION REFUSE FROM THE WORK AREA AND SCHEDULE, NO LESS THAN 30 DAYS APART IN FREQUENCY. DEPOSIT IT IN THE CONTAINERS. SHOULD THE OWNER /LESSOR DEEM A. CONTRACTOR IS SOLELY RESPONSIBLE FOR QUALITY CONTROL OF IT NECESSARY TO REMOVE TRASH DUE TO AN ACCUMULATION, THE C. CHANGES TO THE CONTRACT SUM MAY ONLY OCCUR AFTER WRITTEN THE WORK AND PROVIDE THE WORK IN ACCORDANCE WITH THE CONTRACTOR SHALL BE CHARGED ACCORDINGLY. APPROVAL BY THE PROJECT MANAGER AND OWNER OF A CHANGE CONTRACT DOCUMENTS. USE ONLY NEW MATERIALS AND EQUIPMENT. ORDER. THE CONTRACTOR MAY SUBMIT CHARGES FOR CHANGES TO B. THE INSTALLER OF EACH BUILDING COMPONENT OR INDIVIDUAL C. ADEQUATE PROTECTION SHALL BE TAKEN AGAINST FIRE THE WORK ONLY AFTER THE PROJECT MANAGER'S AND OWNER'S SYSTEM SHALL VERIFY THAT THE CONDITION UNDER WHICH THE WORK THROUGHOUT ALL THE CONTRACTOR'S AND SUBCONTRACTOR'S WRITTEN APPROVAL. IS TO BE PERFORMED ARE AS REQUIRED. THE CONTRACTOR SHALL OPERATIONS. THE INTEGRITY OF THE FIRE PROTECTION SYSTEMS REMEDY CONDITIONS DETRIMENTAL TO PROPER AND TIMELY MUST BE MAINTAINED, AND A FIRE -WATCH BE PROVIDED BY THE D. PAYMENT APPLICATION FORMS AIA G -102 AND AIA G103 OR OWNER COMPLETION OF THE WORK. DO NOT PROCEED UNTIL SATISFACTORY CONTRACTOR AS REQUIRED. FURNISHED DOCUMENTS SHALL BE USED. THREE COPIES, NOTARIZED CONDITIONS HAVE BEEN CORRECTED. BY THE CONTRACTOR'S AUTHORIZED OFFICIAL, WITH THE REQUIRED D. THE PROJECT SITE SHALL BE LEFT IN A GLEAN AND SAFE WAIVERS AND AFFIDAVITS SHALL BE SUBMITTED. 12. PROJECT COORDINATION. CONDITION AT THE END OF EACH DAY. E. SUBMIT WAIVERS OF MECHANICS LIENS FOR THE FULL VALUE OF THE A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE E. ONLY THOSE ENTRANCES DESIGNATED BY THE OWNER /LESSER WORK COMPLETED, FROM THE CONTRACTOR, EACH WORK OF ALL TRADES. ALL TRADES SHALL BE REQUIRED TO ASSIST IN SHALL BE USED DURING CONSTRUCTION FOR PERSONNEL, SUBCONTRACTOR, SUB- SUBCONTRACTOR, AND SUPPLIER. SUBMIT WORKING OUT FUNCTIONAL CONSIDERATIONS AND SPACE CONDITIONS TO DELIVERIES, REMOVAL OF MATERIALS, ETC. MATERIALS AND ALSO AFFIDAVITS OF PARTIAL PAYMENT AS MAY BE REQUIRED BY MAKE SATISFACTORY ADJUSTMENTS AND SHALL BE PREPARED TO EQUIPMENT SHALL NOT BE MOVED THROUGH COMMON AREAS THE OWNER. SUBMIT FINAL WAIVERS FROM EVERY SUBCONTRACTOR, SUBMIT COORDINATED SHOP DRAWINGS. WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER /LESSOR, DURING SUPPLIER, ETC. WHO COULD LAWFULLY BE ENTITLED TO A LIEN WITH HOURS DETERMINED BY THE OWNER_ THE FINAL APPLICATION FOR PAYMENT_ USE STANDARD B. THE CONTRACTOR SHALL COORDINATE THE WORK WITH WORK THAT APPLICABLE AND LEGALLY ACCEPTABLE FORMS OR OWNER SHALL BE CONDUCTED BY OTHER CONTRACTORS /VENDORS /SUPPLI €RS FURNISHED FORMS. COMMISSIONED INDEPENDENTLY BY THE OWNER, BY THE OWNER'S PERSONNEL, AND BY THE PROJECT MANAGER. Zimmerman Weintraub Associates, LLC Strategic Facilities Consulting and Architecture 410 SOUTH MICHIGAN AVE, SUITE 500 CHICAGO, ILLINOIS 60605 voice: 312. 879. 9636 fax: 312.554.9640 06/16/06 I ISSUE FOR PERMIT 05/16/2006 I ISSUE FOR REVIEW 04/00/2006 PRELIMINARY DESIGN No. Date Issue / Revision CCMH Courtyard I LLC COURTYARD BY MARRIOTT INDIANAPOLIS - CARMEL 10290 N Meridian Street INDIANAPOLIS, INDIANA Project No. 51BCC4002 Drawing File: FILENAME Drown By HMB Checked By PH Signature: Date License 7 Signed: �O'�� Expiration: D `� o Sheet Title: GENERAL NOTES Sheet: Al ■ ■