Loading...
HomeMy WebLinkAbout05060005.34 Landscape Plans 10-9-2005ij fr (2) Rmd Oak 7 (4) RAtdbud 5 (3) NL-wm9 Spruce - ti (4) FZcd Oak' (5) Colorado Spruce= (1) MATCH LINE SHEET I MATCH LINE SHEET L- I I A 3) Woncmjtlocust 3) Warveat Gold Crab (3) Autumn 51aze Maple + A 0 It V + (4)14arvis3t Gold Crab (S) Wardl Yew (3) Colorado Spruce 0) Maiden Gra66 ,o—O'es &'scat L-3 For tree Frezervatlon j '4) Aitum 151aze Maple MATCH LINE SHEET L-2 MATCH LINE SHEET L-1 COD lRb. gr ft UZI M4�T asp 0 u 9\ C\ cn 0 rT 0 PM04 > z � d O � a W W O � @ a CIA z 0 u w DATE REVISIONS 12/04/04 TAC REVISIONS 1/25/05 DEV. REVISIONS 8/25/05 TIZEE PRESERVATION 9/9/05 TREE PRESERVATION � - I SCALE I It= 50' DATE 9/9/05 PROJECT NO. DRAWN BY MB CHECKED BY IF NH MATCH LINE SHEET L-2 MATCH LINES T-1-1 (2) Redbud See L -4 For Tree Prcac vation x. x. �x. +1 �b 3 Y y (3) Autu�s 151a= Maple .� ..e & ieet L -4 For Trees Preservation �j+ 4 � y7 nt� y f is :fi R ff 1� k r� (3) Norway Spruce (3) Norway Spruce ,f (4) 7hornic3a Hawthorn Y a' r ;4 i f 1 i S S (2) Norway Spruce *(2) Prairiafire Crab (2) Pralric Cas"da Wltlow • k fr�F See Short L -*4 For Tres Preservation General Construction Notes 1. EXISTING SITE INFORMATiON SUPPLIED BY 5TOEPPELWERTH AND ASSOC. FISHER$, IN 46038. ALL QUANTITIES AND DESIGN BASED UPON SAME. 2. BEFORE ANY EXCAVATION ON THE SITE. CALL FOR A LOCATE ON ANY Etc I St I NG UTILITIES ON THE SITE. THE CONTRACTOR SHALL FAM i L I AR i ZE HIMSELF/HERSELF WITH THE LOCATIONS OF ALL BURIED UTILITIES iN THE AREAS OF WORK BEFORE STARTING OPERATIONS. THE CONTRACTOR SHALL BE LIABLE FOR COST OF REPAIRING OR REPLACING ANY BURIED CONDUITS, CABLES OR PIPIWa DAMAGED DURING THE INSTALLATION OF THiS WORK. 3. PROTECT STRLtCTU E S, UTILITIES, SIDEWALKS., PAVEMENTS AND OTHER UTILITIES TO REMAIN FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MO\/EIENT, UNDERMINING, WASHOUTS AND OTHER HAZARDS CREATED BY SITE IMPROVEMENT OPERATIONS. 4. CAREFULLY MAINTAIN PRESENT GRADE AT BASE OF ALL EXISTING TP.EES TO REMAIN. PREVENT ANY DISTURBANCE OF EXISTING TREE=5. USE TREE PROTECTION BARRICADES WHERE INDICATED. PROTECT EXISTING TREES TO REMAIN IN PLACE AGAINST UNNECESSARY CUTTING, BREAKING OR SKINNING OF ROOTS, 5RUISiNG OF BARK, SMOTHERING OF TREES BY STOCKPILING EXCAVATION AND CONSTRUCTION MATERIALS WITHIN THE DRiP LINE. S. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES ON IUHICH THE WORK IS 5r =IWz DONE, CLEAR OF RU5515H AND DE5Ri5. <o. ALL WORK AND OPERATIONS SHALL COMPLY WITH ALL APPLiCABLE FEDERAL, STATE, AND LOCAL CODES AND ORDINANCES. 1. LAYOUT OF ALL NEW PATHWAYS, CURBS AND WALLS SHALL 5E SMOOTH AND CONTINUOUS. KINKY ALIGNMENT OR ABRUPT CHANGES WfL.L. NOT BE ACCEPTED. LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT AND FORMWORK BEFORE CONSTRUCTION CONTINUES. _u_ - - -- Thmntms Hawthorn Planting Notes 1. PLANT LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND REVIEWED BY THE LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS COMMENCE. ADJUST AS REQUESTED TO AVOID UTILITY CONFLICTS. 2. NOTE THAT PLANT L 15T QUANTITIES ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. CONCTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO SUBMITTING THEiR BID FOR THIS PROJECT. 3. ALL PLANT MATERIAL SHALL RM TO ANSI 260.1 STANDARDS. LANDSCAPE ARCHITECT PRESERVES THE RIGHT TO REJECT ANY PLANT MATERIAL 140T MEETING INDUSTRY STANDARDS. 4. PLANTING BEDS SHALL RECEIVE A 3" LAYER OF SHREDDED BARK I" iuLCH. 15. SEED AND STRAW MULCH ALL LAWN AREAS DISTURBED DURING CON67RUCTION, UNLESS NOTED OTHERWISE. 646) Colorado Spruce 2) Red Oak "(3) Norm of Co) Autu,Vf" Btaza Maple MATCH LINE SHEET L-2 MATCH LINE SHEET L-1 Free Preservation 5) Norway Spruce �-t9) Redtwtg D --= 4) Redbud — '(4) Prairtef<re Grab -- =,112) Cray Owl Jumper --:C3) tocust .--(4) 5loodgood planetree x-(31 Colorado Spruce 5urning Bush z 4 4) Lea thcr lea f Vibu 7m, _(5) Autumn 51aze Maple t R Y i 1 1 i - 1 �Ir I I t Warvmt Gotcl Crab (�2) Greg Owl Juniper (iS) Burning Bush _(5,1' Royal Red Maple r l =( -12) Karl Foeratcr Graee :r= =r,'r) Colorado Spru= --(8) Leath=rtear Viburnum 1) Honeylorut Wards Yew rC) Pratriefire Crab e -r u s. • R w •• S f U REVISIONS 12/04/04 TAC REVISIONS 1/25/05 DEV. xEVISIONS 8I25/05 TREE PRESERVATION 4I9I05 TREE PRESERVATION W O a a o W z Q A w � 0 � a L PM, U O AE� H z � a � N o a Fumq H DATE REVISIONS 12/04/04 TAC REVISIONS 1/25/05 DEV. xEVISIONS 8I25/05 TREE PRESERVATION 4I9I05 TREE PRESERVATION SCALE I " = 50' DATE 9/9/05 PROJECT NO. DRAWN BY MB �$ NH SHEET NO. IL -2 i ( i \ ! | ! � � / ! i ! { | ` � � | ' ' | ' } . . } ` 'r WI& Snout f Drip Lim or E)i ---____-~ 1�p ' i | Stated to be =reagsrved that had to be priptne of F-xl6tlrQ Trees ire a art 4*0 4w MJ CHECKED BYNH .-M�MLH REVISIONS FDATE 8/25/05 TREE PRESERVATION 9/9/05 TREE PRESERVATION SCALE 1 50' rSC DAM 9/9/05 OJI DRANWN BY MB CHECKED BYNH .-M�MLH r S e � G t �l 3 j �w �r i i 4` W1!gh Grow Emcee Alone Drip Lire cif Existing Trees � ti= t Y t y� 1 s° 'i Y M .y e i 3' :I S P i r r t i •'i f Y. t a t 1# :J e _ j t Y x 7 _. 'r t Y a I I / o�'t O ,1pS °� `off °���` k ��'� '`,� General Construction Notes gt g¢,�O O� 0¢10 1. EXISTING SITE INFORMATION SUPPLIED BY 5ToEPP=LW=RTHI AND ASSOC. FISHERS, IN 46035. ALL QUANTITIES AND DESIGN BASED UPON SAME. V • a g�titi Additional Tre ea Ackled to Preservation Plan on 8/22/05 2. BEFORE ANY EXCAVATION ION ON THE SITE. CALL FOR A LOCATE ON ANY EXISTING UTILITIES ON THE SITE. THE CONTRACTOR SHALL FAMILIARIZE 14IMSELF /CIERSELF WITH THE LOCATIONS OF ALL BURIED UTILITIES IN THE AREA$ C1= WORK 5EFOR� STARTING OPERATIONS. THE CONTRACTOR SHALL BE L IA5LE FOR COST OF REPAIRING OR REPLACING ANY 5URIED CONDUITS, CA5LE5 OR PIPING DAMAGED DURING THE INSTALLATION OF THIS WORK. 3. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS SAND OTHER UTILITIES TO REMAIN FROM DAMAGE CAUSED 5Y SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUTS AND OTHER HAZARDS CREATED 5Y SITE IMPROVEMENT OPERATIONS. 4. CAREFULLY MAINTAIN PRESENT GRADE AT SASE OF ALL EX161ING TREES TO REMAIN. PREVENT ANY D I STURIB ANCE OF EXISTING TREES. U5E TREE PROTECTION 5ARRICADE6 W14ERE INDICATED. PROTECT EX15TING TREES TO REMAIN IN PLACE AGAINST UNNECE55ARY CUTTING, BREAKING OR SKINNING OF ROOFS, 8RUI5INCB OF 5ARK, SMOTHERING OF TREES 5Y STOCKPILING EXCAVATION AND CONSTRUCTION MATERIALS WITHIN THE DRIP L INE. 5. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES ON WHICH THE WORK 15 LSE ING DONE, CLEAR OF RU5515H AND DE5RI5. (a. ALL WORK AND OPERATIONS SMALL. COMPLY WITH ALL APPLICABLE FEIDERAL, STATE, AND LOCAL CODES AND ORDINANCES. I- LAYOUT OF ALL NEW PATPWAYSf CURBS AND WALLS SMALL BE SMOOTW AND CONTINUOUS. KINKY ALIGNMENT OR ABRUPT CHANGES WILL NCT BE ACCEPTED. LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT A1O FORMWORK, 5EFORE CONSTRUCTION CONTINUES. Planting Notes 1. PLANT LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND REVIEWED BY THE LANDSCAPE ARCHITECT BORE PLANTING OPERATIONS COMMENCE. ,4DJl1St AS REQUESTED TO AVOID UTILITY CONFLICTS. 2. NOTE THAT PLANT L 15T QUANTITIES A FOR THE CONTRACTOR' 5 CONVENIENCE ONLY. CONCTR,ACTOR 5H ALL VERIFY ALL QUANTITIES PRIOR'. TO SUBMITTING THEIR 51D FOR TH 15 PROJECT. 3. ALL PLANT MATERIAL SHALL CONFORM TO AN51 Z60.1 STANDARDS. LANDSCAPE ARCHITECT PRESERYE5 THE RIGHT TO REJECT ANY PLANT MATERIAL. NOT MEETING INDUSTRY STANDARDS. 4. PLANTING 5ED5 SHALL RECEIVE A 3" LAVER OF SHREDDED 5AM< MULCH. �. SEED AND STRAW MULCH ALL LAWN ,AREAS D15TUR5ED DURING CONSTRUCTION, UNLESS NOTED OTHERWISE. ki h r.� now Along PrI LIne of Extatt Trcea t r 1 1 -e i ti i f, T j s s t i i Yre:ca Slated to be 1F're6esrved that had to I" �'oved t t t i S I z a -t ti i r f F f i a 1 J J } Y f i i s 4� i i S { 1 Y r �{ 7 1 � 7 rx r t` i � s i r 4c i z IIYYN! s I3 S S i r h ,3 r • .a t *slid Avg f, s t + V / }. DATE REVISIONS 12/04/04 TAC xEVISIONS 1/25/05 DEV. REvISIONS SIZS/OS TREE PRESERVATION 9/9/05 TREE PRESERVATION SCALE 1 "= 50' DATE 9/9/05 PROJECT NO. DRAWN BY 1CML"tCELTtY NH 4 ♦'rGw isi\ .j_ i•-ai i S .• rt J t { �' c r �;•� fi •F L . .. �'•�_�•. fi Y ~+ .,1`• ♦ 4� -� =. >�� ....Y�iV .... rrr.q...w. +Yr +..f��. . ... . -, ..E .. .. �.... -• I.r � ..,. -- . ; !�- °' i'yi `i.K>,'0 '���•- Sir• t + ... „� ; _ ,�rs t4 ...�` y4` f :aJ ". �: ,i'. Fi :� J 9fv..• - _ - '^ a. :. v !.. - i y. w,r �<✓' �:. a .... ..... •.> . •t`_ a_.. t•<rM+•:+i.e- . w.ry xaa:1 :a,..,.. �i.•.i i-. rK ..• .. .. .. ^ -- ..,rr .. w r. -.� .... -r-.. .. , .. \. -.s.. �._, r• *l-r.. .. - s. ^. r_ _. ! r. ..>... . -.a _. -«w .•. .. r.. -� r �..r - .. ..•. ...... .. _,Y __. t.. _. _. _ a 1 + .-.l' � -.•��. :$ a a� irf•- f y ,4' High &«u Along Drip 1.tna of amxi�ttV.Q Try , - I ,1 � :... a ..i. a. ...., .... -n.. . v. .. .... r. ... ..... I' f .3 , J la' 1 • C i • p Y a - C, { J 1 is y 5 2 i • a:{ �i.' i�s5Kat33�..:�'r��1.eiq�:t;>�a. �;3�t�l.is'i k `Ea.; ?1�y aya;,G'._ '.th ","Ir w�:e..+aif= '�iF!?3,: <G.ie Y i 7 � S Y { y4 i .i51 � `S �q�T�� R , ■ _ �'�', _a. _- .x♦.♦ > .. • _ Y >t N ,^�M } ':r'✓ 4j' >. l�lv� .c a 11i. {J' -....f F>a - {.}{+. ,... ♦ S f _�._. > 5 t 3 i a F 1 t J 1 7 } s t 3 r i i s r } i 5 4 S 4' High Snow Fence Along Drip Lies of Ixisting Treog t♦ ' J 4' High mow Inca ,d►" Drip Lire of Existir , Trees 1 ' 'sue K -tv q � -�• ,.rr.^ ' �: ;ri ''� s _ ; 3 If t-� - - ..... . ,.. .. ..., .�. -s+, -• r_.. -.., r -_ .ter._- r•e.. ..r Sa'�,• ... .. _.. 4' Hi h Snow Fermi Along Dri i.ira of > xtstt Trees p ng 3 � 4A :�rwaV� • 3 I c e • i L i t � t� 1 f i 7 - .. "•�`. ... .'I�•f 1' 's >-:� .! t.T;'t:••+Is t:t =.. ..'i TL .....� �1.H i,r.::.1'e. , ?��. J t 1 r i 4' HI h Snow Fence Along p n9 Dri Line of Exiati Tree a 1� lam' �• 4!• Jam. 4 f 11 ,fir > 1i DATE REVISIONS 12/04/04 TAC REVISIONS 1/25/05 DEV. REVISIONS 8I25/05 TREE PRESERVATION 9/9/05 'TREE PRESERVATION SCALE 1It= 50' DATE 919105 PROJECT NO. DRAWN BY MB CHECKED BY NH 4' 1419h A{ Drip Line of F- AbUrkg Tit IV ks s 'i 0 1 ry (j i` z 1 t y L' Drip Llw or EZistiras 1 tt i i i i r, :t f3 i i i ,a i 5 !t 4 r S 4, �r 't Genera Construction Notes "ION SUPPLIED 5Y STOEF'EL 1. EXISTING SITE IN1= O1"IA UERTN AND A550C. ON SAME. �154��R5, IN U 46036. ALL QUANTITIES AND DESIGN 5A5ED P TN SITE. CALL FOR A LOCATE ON ANY EXISTING 2. �3E1 =ORS ANY ExCAYATION aN � CTOR SHALL FAMILIARIZE N IhSEL = /HERSELF UTILITIES ON T�� SITE. CONTRA AS o� W0% �3�ORE OCATIONS OF ALL 5U -'IED UTILITIES IN THE ARC WITH t�-I L3 L.iA�. FOR GDS' OF TING OPERATIONS. THE CONTRACTOR SHALL STAR �II�-�. REPAIRING OR REPLACING ANY 5URIED UITS, CA�3LE5 Off'. DAMAGE THE INSTALLATION OF THIS UJOi�. 3. PROTECT STRUCTURES, UTILITIES, 51 DEUJALKS, PAVEMENTS AND OTHER UTILITIES CAUSED 15Y SETTLEMENT, LATERAL MOVEMENT,, �'� REMAIN FROM DAMAGE UNDEFalINING, WASHOUTS AND OTHER HAZARDS CREATED 5Y SITE I -HO IMPROVEMENT OPERATIONS. 4. CAREFULLY MAINTAIN PRESENT GRADE AT SASE OF ALL ExI5TING TREES TO iSTUR�3ANCE OF ExISTIN� TREES. USE TREE REMAIN. PREVENT AN�t' D 5�'INt� TREES TO ICADES U1I*IFRE INDICATED. PROTECT EXI PROTECTION �3ARR INS OR SKINNiNC� oI= AC AGAINST UNNECE55ARY CUTTING, ., REAK REMAIN IN PLACE STOCKI=ILING TS RU I S INS OF 5ARK, SMOTHERING OF TREES 5Y ROO MATERIALS UJ1�'1 -#IN �'NE I�RI�' LINE. EXCAVATION AND CONSTRUCTION MATER AL �. THE CONTRACTOR AT ALL TIMES SMALL KEEP THE PREM15ES ON WHICH THE WoR< 15 5E INCA DONE CLEAR OF RU5515N AND DE5RI S. ro. ALL WORK AND OPERATIONS SHALL COMPLY WITH ALL Afi='FL ICA$LE FEDERAL, STATE AND LOCAL CODES AND ORDINANCES- . •� ALL A r 1 M Yy CIIRBs -.AND WALLS SMALL 5E SMOOTH AND c� ,��.. ��'� � � L NOT E ACCEPTED. KINKY ALIGNMENT OR A5RJPT CHANGES U11 5E L coNTINUOU l�c LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT AND FoWulo 5EFORE CONSTRUCTION CONTINUES. Planting Notes 1. PLANT LOCATIONS SHALL 8E STAKED BY THE CONTRACTOR AND REVIEWED BY THE LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS COMMENCE. ADJUST AS REQUESTED TO AVOID UTILITY CONFLICTS. 15T QUANTITIES T I E 5 ARE FOR THE CONTRACTOR'S CONVENIENCE 2. NOTE THAT PLANT L U I ITTINC� ONLY. cONCTRACTOR SHALL VERIFY ALL QUANTITIES 1=RI OR TO 5 � THEIR 5ID FOR TH15 PROJECT. i SHALL CONFORM T O AN51 Z& O -1 5TAND ARID 5- L AND SCAPE 3. ALL PLANT MATERIAL ARCHITECT PRESERVES SERVES THE RIGHT TO REJECT ANY PLANT MATERIAL 14oT MEETING INDUSTRY STANDARDS. F3 .. PLANTING SHALL RECEIVE A 3" LAVER OF SHREDDED 5ARK MULCH. � U CH ALL LAWN AREAS D I STURir3ED DURING C:ONS�'RUCTION, �5. SEED 51'RAUJ MULCH UNLE55 NOTED OTHERWISE. �s E r i _F i i s i } 1 t a f { i 4 1 a H 4 p 2 ti I i 1 ti F{ i i t i r S E i t t 1 3 � a Y • i 1 l S l 1 � w$ � t s •s • �.R..L �•s �� Qm �'.s a 'Ar • � � � -• ir Al ap L U 1 "= 50' DATE 9/9105 a H MB CHECKED BY NH o o W paq � d W <C O 4e..4 0 a W a z O Q Fmmi � W a d W W E-� x H DATE I REVISIONS 12/04/04 TAC REVISIONS 1/25/05 DEV. REVISION; 8/25/05 nZEE PRESERVATI02 919105 TREE PRESERVATIO] SCALE 1 "= 50' DATE 9/9105 PROJECT NO. DRAWN BY MB CHECKED BY NH SHEET NO.