HomeMy WebLinkAbout05060005.34 Landscape Plans 10-9-2005ij
fr
(2) Rmd Oak 7
(4) RAtdbud
5
(3) NL-wm9 Spruce -
ti
(4) FZcd Oak'
(5) Colorado Spruce=
(1)
MATCH LINE SHEET I
MATCH LINE SHEET L- I
I A
3) Woncmjtlocust
3) Warveat Gold Crab
(3) Autumn 51aze Maple
+
A
0
It
V
+
(4)14arvis3t Gold Crab
(S) Wardl Yew
(3) Colorado Spruce
0) Maiden Gra66
,o—O'es &'scat L-3 For
tree Frezervatlon
j '4) Aitum 151aze Maple
MATCH LINE SHEET L-2
MATCH LINE SHEET L-1
COD
lRb.
gr
ft UZI
M4�T asp
0
u
9\
C\
cn
0
rT 0
PM04
> z
� d
O
� a
W W
O �
@ a
CIA
z
0
u
w
DATE
REVISIONS
12/04/04
TAC REVISIONS
1/25/05
DEV. REVISIONS
8/25/05
TIZEE PRESERVATION
9/9/05
TREE PRESERVATION
� -
I
SCALE
I It= 50'
DATE
9/9/05
PROJECT NO.
DRAWN BY
MB
CHECKED BY
IF NH
MATCH LINE SHEET L-2
MATCH LINES T-1-1
(2) Redbud
See L -4
For Tree Prcac vation
x.
x.
�x.
+1 �b
3
Y y
(3) Autu�s 151a= Maple
.� ..e & ieet L -4
For Trees Preservation
�j+ 4
� y7
nt�
y
f
is
:fi R ff
1�
k
r�
(3) Norway Spruce
(3) Norway Spruce
,f
(4) 7hornic3a Hawthorn
Y
a'
r
;4
i
f 1
i
S
S
(2) Norway Spruce
*(2) Prairiafire Crab
(2) Pralric Cas"da Wltlow
• k fr�F
See Short L -*4
For Tres Preservation
General Construction Notes
1. EXISTING SITE INFORMATiON SUPPLIED BY 5TOEPPELWERTH AND ASSOC.
FISHER$, IN 46038. ALL QUANTITIES AND DESIGN BASED UPON SAME.
2. BEFORE ANY EXCAVATION ON THE SITE. CALL FOR A LOCATE ON ANY Etc I St I NG
UTILITIES ON THE SITE. THE CONTRACTOR SHALL FAM i L I AR i ZE HIMSELF/HERSELF
WITH THE LOCATIONS OF ALL BURIED UTILITIES iN THE AREAS OF WORK BEFORE
STARTING OPERATIONS. THE CONTRACTOR SHALL BE LIABLE FOR COST OF
REPAIRING OR REPLACING ANY BURIED CONDUITS, CABLES OR PIPIWa
DAMAGED DURING THE INSTALLATION OF THiS WORK.
3. PROTECT STRLtCTU E S, UTILITIES, SIDEWALKS., PAVEMENTS AND OTHER UTILITIES
TO REMAIN FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MO\/EIENT,
UNDERMINING, WASHOUTS AND OTHER HAZARDS CREATED BY SITE
IMPROVEMENT OPERATIONS.
4. CAREFULLY MAINTAIN PRESENT GRADE AT BASE OF ALL EXISTING TP.EES TO
REMAIN. PREVENT ANY DISTURBANCE OF EXISTING TREE=5. USE TREE
PROTECTION BARRICADES WHERE INDICATED. PROTECT EXISTING TREES TO
REMAIN IN PLACE AGAINST UNNECESSARY CUTTING, BREAKING OR SKINNING OF
ROOTS, 5RUISiNG OF BARK, SMOTHERING OF TREES BY STOCKPILING
EXCAVATION AND CONSTRUCTION MATERIALS WITHIN THE DRiP LINE.
S. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES ON IUHICH THE
WORK IS 5r =IWz DONE, CLEAR OF RU5515H AND DE5Ri5.
<o. ALL WORK AND OPERATIONS SHALL COMPLY WITH ALL APPLiCABLE FEDERAL,
STATE, AND LOCAL CODES AND ORDINANCES.
1. LAYOUT OF ALL NEW PATHWAYS, CURBS AND WALLS SHALL 5E SMOOTH AND
CONTINUOUS. KINKY ALIGNMENT OR ABRUPT CHANGES WfL.L. NOT BE ACCEPTED.
LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT AND FORMWORK
BEFORE CONSTRUCTION CONTINUES.
_u_ - - --
Thmntms Hawthorn
Planting Notes
1. PLANT LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND REVIEWED BY
THE LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS COMMENCE.
ADJUST AS REQUESTED TO AVOID UTILITY CONFLICTS.
2. NOTE THAT PLANT L 15T QUANTITIES ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. CONCTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO SUBMITTING
THEiR BID FOR THIS PROJECT.
3. ALL PLANT MATERIAL SHALL RM TO ANSI 260.1 STANDARDS. LANDSCAPE
ARCHITECT PRESERVES THE RIGHT TO REJECT ANY PLANT MATERIAL 140T
MEETING INDUSTRY STANDARDS.
4. PLANTING BEDS SHALL RECEIVE A 3" LAYER OF SHREDDED BARK I" iuLCH.
15. SEED AND STRAW MULCH ALL LAWN AREAS DISTURBED DURING CON67RUCTION,
UNLESS NOTED OTHERWISE.
646) Colorado Spruce
2) Red Oak
"(3) Norm of
Co) Autu,Vf" Btaza Maple
MATCH LINE SHEET L-2
MATCH LINE SHEET L-1
Free Preservation
5) Norway Spruce
�-t9) Redtwtg D
--= 4) Redbud
— '(4) Prairtef<re Grab
-- =,112) Cray Owl Jumper
--:C3) tocust
.--(4) 5loodgood planetree
x-(31 Colorado Spruce
5urning Bush
z
4 4) Lea thcr lea f Vibu 7m,
_(5) Autumn 51aze Maple
t
R
Y
i
1
1
i
-
1 �Ir
I
I
t
Warvmt Gotcl Crab
(�2) Greg Owl Juniper
(iS) Burning Bush
_(5,1' Royal Red Maple
r
l
=( -12) Karl Foeratcr Graee
:r= =r,'r) Colorado Spru=
--(8) Leath=rtear Viburnum
1) Honeylorut
Wards Yew
rC) Pratriefire Crab
e -r
u
s. • R w ••
S
f
U
REVISIONS
12/04/04
TAC REVISIONS
1/25/05
DEV. xEVISIONS
8I25/05
TREE PRESERVATION
4I9I05
TREE PRESERVATION
W
O
a
a
o
W
z
Q
A
w
�
0
�
a
L
PM,
U
O
AE�
H
z
�
a
�
N
o
a
Fumq
H
DATE
REVISIONS
12/04/04
TAC REVISIONS
1/25/05
DEV. xEVISIONS
8I25/05
TREE PRESERVATION
4I9I05
TREE PRESERVATION
SCALE
I " = 50'
DATE
9/9/05
PROJECT NO.
DRAWN BY
MB
�$
NH
SHEET NO.
IL -2
i
(
i
\
!
|
!
�
�
/
!
i
!
{
|
`
�
�
|
'
' |
' }
. .
}
`
'r WI& Snout f
Drip Lim or E)i
---____-~
1�p
'
i
|
Stated to be
=reagsrved that had to be
priptne of F-xl6tlrQ Trees
ire a
art
4*0 4w
MJ
CHECKED BYNH
.-M�MLH
REVISIONS
FDATE
8/25/05
TREE PRESERVATION
9/9/05
TREE PRESERVATION
SCALE
1 50'
rSC
DAM
9/9/05
OJI
DRANWN BY
MB
CHECKED BYNH
.-M�MLH
r
S
e �
G
t �l
3
j
�w
�r
i
i
4` W1!gh Grow Emcee Alone
Drip Lire cif Existing Trees �
ti= t
Y
t y�
1
s°
'i
Y
M
.y
e
i
3'
:I
S
P
i
r
r
t
i
•'i
f
Y.
t
a
t
1#
:J
e _
j t Y x 7 _.
'r
t Y
a I I / o�'t O
,1pS °� `off °���` k ��'� '`,�
General Construction Notes
gt
g¢,�O
O�
0¢10
1. EXISTING SITE INFORMATION SUPPLIED BY 5ToEPP=LW=RTHI AND ASSOC.
FISHERS, IN 46035. ALL QUANTITIES AND DESIGN BASED UPON SAME.
V • a
g�titi
Additional Tre ea Ackled
to Preservation Plan on
8/22/05
2. BEFORE ANY EXCAVATION ION ON THE SITE. CALL FOR A LOCATE ON ANY EXISTING
UTILITIES ON THE SITE. THE CONTRACTOR SHALL FAMILIARIZE 14IMSELF /CIERSELF
WITH THE LOCATIONS OF ALL BURIED UTILITIES IN THE AREA$ C1= WORK 5EFOR�
STARTING OPERATIONS. THE CONTRACTOR SHALL BE L IA5LE FOR COST OF
REPAIRING OR REPLACING ANY 5URIED CONDUITS, CA5LE5 OR PIPING
DAMAGED DURING THE INSTALLATION OF THIS WORK.
3. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS SAND OTHER UTILITIES
TO REMAIN FROM DAMAGE CAUSED 5Y SETTLEMENT, LATERAL MOVEMENT,
UNDERMINING, WASHOUTS AND OTHER HAZARDS CREATED 5Y SITE
IMPROVEMENT OPERATIONS.
4. CAREFULLY MAINTAIN PRESENT GRADE AT SASE OF ALL EX161ING TREES TO
REMAIN. PREVENT ANY D I STURIB ANCE OF EXISTING TREES. U5E TREE
PROTECTION 5ARRICADE6 W14ERE INDICATED. PROTECT EX15TING TREES TO
REMAIN IN PLACE AGAINST UNNECE55ARY CUTTING, BREAKING OR SKINNING OF
ROOFS, 8RUI5INCB OF 5ARK, SMOTHERING OF TREES 5Y STOCKPILING
EXCAVATION AND CONSTRUCTION MATERIALS WITHIN THE DRIP L INE.
5. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES ON WHICH THE
WORK 15 LSE ING DONE, CLEAR OF RU5515H AND DE5RI5.
(a. ALL WORK AND OPERATIONS SMALL. COMPLY WITH ALL APPLICABLE FEIDERAL,
STATE, AND LOCAL CODES AND ORDINANCES.
I- LAYOUT OF ALL NEW PATPWAYSf CURBS AND WALLS SMALL BE SMOOTW AND
CONTINUOUS. KINKY ALIGNMENT OR ABRUPT CHANGES WILL NCT BE ACCEPTED.
LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT A1O FORMWORK,
5EFORE CONSTRUCTION CONTINUES.
Planting Notes
1. PLANT LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND REVIEWED BY
THE LANDSCAPE ARCHITECT BORE PLANTING OPERATIONS COMMENCE.
,4DJl1St AS REQUESTED TO AVOID UTILITY CONFLICTS.
2. NOTE THAT PLANT L 15T QUANTITIES A FOR THE CONTRACTOR' 5 CONVENIENCE
ONLY. CONCTR,ACTOR 5H ALL VERIFY ALL QUANTITIES PRIOR'. TO SUBMITTING
THEIR 51D FOR TH 15 PROJECT.
3. ALL PLANT MATERIAL SHALL CONFORM TO AN51 Z60.1 STANDARDS. LANDSCAPE
ARCHITECT PRESERYE5 THE RIGHT TO REJECT ANY PLANT MATERIAL. NOT
MEETING INDUSTRY STANDARDS.
4. PLANTING 5ED5 SHALL RECEIVE A 3" LAVER OF SHREDDED 5AM< MULCH.
�. SEED AND STRAW MULCH ALL LAWN ,AREAS D15TUR5ED DURING CONSTRUCTION,
UNLESS NOTED OTHERWISE.
ki h r.� now Along
PrI LIne of Extatt Trcea
t
r
1
1 -e
i
ti
i
f,
T
j
s s
t
i
i
Yre:ca Slated to be
1F're6esrved that had to I"
�'oved
t
t
t
i
S
I
z
a
-t
ti
i
r
f
F
f
i
a
1
J
J
}
Y
f
i
i
s
4�
i
i
S {
1
Y
r �{
7
1 �
7
rx
r t`
i � s
i
r 4c i z
IIYYN! s
I3 S S
i r
h
,3
r
• .a t *slid
Avg
f,
s
t + V
/ }.
DATE
REVISIONS
12/04/04
TAC xEVISIONS
1/25/05
DEV. REvISIONS
SIZS/OS
TREE PRESERVATION
9/9/05
TREE PRESERVATION
SCALE
1 "= 50'
DATE
9/9/05
PROJECT NO.
DRAWN BY
1CML"tCELTtY NH
4 ♦'rGw
isi\ .j_ i•-ai i
S .• rt
J
t { �' c r �;•� fi
•F L
. .. �'•�_�•. fi Y ~+ .,1`• ♦ 4� -� =. >�� ....Y�iV .... rrr.q...w. +Yr +..f��. . ... . -, ..E .. .. �.... -• I.r � ..,. -- .
; !�- °' i'yi `i.K>,'0 '���•- Sir• t
+ ... „� ; _ ,�rs t4 ...�` y4` f :aJ ". �: ,i'. Fi :� J 9fv..• - _ -
'^ a. :. v !.. - i y. w,r �<✓' �:. a .... ..... •.> . •t`_ a_.. t•<rM+•:+i.e- . w.ry xaa:1 :a,..,.. �i.•.i i-. rK ..• .. .. .. ^ -- ..,rr .. w r. -.� .... -r-.. .. , .. \.
-.s.. �._, r• *l-r.. .. - s. ^. r_ _. ! r. ..>... . -.a _. -«w .•. .. r.. -� r �..r - .. ..•. ...... .. _,Y __. t.. _. _. _ a 1 + .-.l' � -.•��. :$ a a� irf•-
f y
,4' High &«u Along
Drip 1.tna of amxi�ttV.Q Try
, - I ,1 � :... a ..i. a. ...., .... -n.. . v. .. .... r. ... .....
I' f
.3
, J
la' 1
• C
i • p
Y a -
C,
{
J
1
is y
5
2
i • a:{ �i.' i�s5Kat33�..:�'r��1.eiq�:t;>�a. �;3�t�l.is'i k `Ea.; ?1�y aya;,G'._ '.th ","Ir w�:e..+aif= '�iF!?3,: <G.ie
Y
i
7 �
S Y
{
y4
i .i51 � `S �q�T�� R , ■
_ �'�', _a. _- .x♦.♦ > .. • _ Y >t N ,^�M } ':r'✓ 4j' >. l�lv� .c a 11i. {J' -....f F>a - {.}{+. ,... ♦ S f _�._.
> 5
t
3
i
a
F
1 t
J
1 7
}
s
t
3
r
i
i
s
r
}
i
5
4
S
4' High Snow Fence Along
Drip Lies of Ixisting Treog
t♦
' J
4' High mow Inca ,d►"
Drip Lire of Existir , Trees
1
' 'sue K -tv q � -�• ,.rr.^ ' �: ;ri ''�
s
_ ; 3
If
t-� - - ..... . ,.. .. ..., .�. -s+, -• r_.. -.., r -_ .ter._- r•e.. ..r Sa'�,• ... .. _..
4' Hi h Snow Fermi Along
Dri i.ira of > xtstt Trees
p ng
3 �
4A
:�rwaV� • 3
I
c
e •
i
L
i
t �
t� 1
f
i
7
- .. "•�`. ... .'I�•f 1' 's >-:� .! t.T;'t:••+Is t:t =.. ..'i TL .....� �1.H i,r.::.1'e. , ?��.
J t
1 r
i
4' HI h Snow Fence Along
p n9
Dri Line of Exiati Tree
a 1� lam' �• 4!•
Jam.
4 f 11 ,fir >
1i
DATE
REVISIONS
12/04/04
TAC REVISIONS
1/25/05
DEV. REVISIONS
8I25/05
TREE PRESERVATION
9/9/05
'TREE PRESERVATION
SCALE
1It= 50'
DATE
919105
PROJECT NO.
DRAWN BY
MB
CHECKED BY
NH
4' 1419h A{
Drip Line of F- AbUrkg Tit
IV
ks
s
'i
0
1
ry
(j
i`
z
1
t
y
L'
Drip Llw or EZistiras 1
tt
i
i
i
i
r,
:t
f3
i
i
i
,a
i
5
!t
4
r
S
4,
�r
't
Genera Construction Notes
"ION SUPPLIED 5Y STOEF'EL
1. EXISTING SITE IN1= O1"IA UERTN AND A550C. ON SAME.
�154��R5, IN U
46036. ALL QUANTITIES AND DESIGN 5A5ED P
TN SITE. CALL FOR A LOCATE ON ANY EXISTING
2. �3E1 =ORS ANY ExCAYATION aN �
CTOR SHALL FAMILIARIZE N IhSEL
= /HERSELF
UTILITIES ON T�� SITE. CONTRA
AS o� W0% �3�ORE
OCATIONS OF ALL 5U -'IED UTILITIES IN THE ARC
WITH t�-I L3 L.iA�. FOR GDS' OF
TING OPERATIONS. THE CONTRACTOR SHALL STAR �II�-�.
REPAIRING OR REPLACING ANY 5URIED UITS, CA�3LE5 Off'.
DAMAGE THE INSTALLATION OF THIS UJOi�.
3. PROTECT STRUCTURES, UTILITIES, 51 DEUJALKS, PAVEMENTS AND OTHER UTILITIES
CAUSED 15Y SETTLEMENT, LATERAL MOVEMENT,,
�'� REMAIN FROM DAMAGE
UNDEFalINING, WASHOUTS AND OTHER HAZARDS CREATED 5Y SITE
I -HO
IMPROVEMENT OPERATIONS.
4. CAREFULLY MAINTAIN PRESENT GRADE AT SASE OF ALL ExI5TING TREES TO
iSTUR�3ANCE OF ExISTIN� TREES. USE TREE
REMAIN. PREVENT AN�t' D 5�'INt� TREES TO
ICADES U1I*IFRE INDICATED. PROTECT EXI
PROTECTION �3ARR INS OR SKINNiNC� oI=
AC AGAINST UNNECE55ARY CUTTING, ., REAK
REMAIN IN PLACE STOCKI=ILING
TS RU I S INS OF 5ARK, SMOTHERING OF TREES 5Y
ROO MATERIALS UJ1�'1 -#IN �'NE I�RI�' LINE.
EXCAVATION AND CONSTRUCTION MATER AL
�. THE CONTRACTOR AT ALL TIMES SMALL KEEP THE PREM15ES ON WHICH THE
WoR< 15 5E
INCA DONE CLEAR OF RU5515N AND DE5RI S.
ro. ALL WORK AND OPERATIONS SHALL COMPLY WITH ALL Afi='FL ICA$LE FEDERAL,
STATE AND LOCAL CODES AND ORDINANCES-
. •� ALL A r 1 M Yy CIIRBs -.AND WALLS SMALL 5E SMOOTH AND
c� ,��.. ��'� � � L NOT E ACCEPTED.
KINKY ALIGNMENT OR A5RJPT CHANGES U11 5E L
coNTINUOU l�c
LANDSCAPE ARCHITECT WILL REVIEW STAKED -OUT LAYOUT AND FoWulo
5EFORE CONSTRUCTION CONTINUES.
Planting Notes
1. PLANT LOCATIONS SHALL 8E STAKED BY THE CONTRACTOR AND REVIEWED BY
THE LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS COMMENCE.
ADJUST AS REQUESTED TO AVOID UTILITY CONFLICTS.
15T QUANTITIES T I E 5 ARE FOR THE CONTRACTOR'S CONVENIENCE
2. NOTE THAT PLANT L U I ITTINC�
ONLY. cONCTRACTOR SHALL VERIFY ALL QUANTITIES 1=RI OR TO 5 �
THEIR 5ID FOR TH15 PROJECT.
i SHALL CONFORM T O AN51 Z& O -1 5TAND ARID 5- L AND SCAPE
3. ALL PLANT MATERIAL
ARCHITECT PRESERVES SERVES THE RIGHT TO REJECT ANY PLANT MATERIAL
14oT
MEETING INDUSTRY STANDARDS.
F3
.. PLANTING
SHALL RECEIVE A 3" LAVER OF SHREDDED 5ARK MULCH.
�
U CH ALL LAWN AREAS D I STURir3ED DURING C:ONS�'RUCTION,
�5. SEED 51'RAUJ MULCH
UNLE55 NOTED OTHERWISE.
�s
E
r
i
_F
i
i
s i
}
1
t
a
f
{
i
4
1 a
H 4
p 2
ti I
i
1
ti
F{
i
i t
i
r
S
E i
t t
1
3 �
a
Y •
i
1
l
S
l
1 �
w$ �
t
s •s • �.R..L �•s ��
Qm
�'.s a 'Ar • � � � -•
ir Al
ap
L
U
1 "= 50'
DATE
9/9105
a
H
MB
CHECKED BY
NH
o
o
W
paq
�
d
W
<C
O
4e..4
0 a
W a
z
O Q
Fmmi �
W
a
d W
W E-�
x
H
DATE I REVISIONS
12/04/04 TAC REVISIONS
1/25/05 DEV. REVISION;
8/25/05 nZEE PRESERVATI02
919105 TREE PRESERVATIO]
SCALE
1 "= 50'
DATE
9/9105
PROJECT NO.
DRAWN BY
MB
CHECKED BY
NH
SHEET NO.