Loading...
HomeMy WebLinkAboutC108MH frame And Cover -- Neenah R -164$ Or Equal For Mbtert/pht Inatallatlons Neenah R- 1916 -F, Or Equal 112' Cement Mortar. --/'� Manhole Steps 0 16' a /c, Rubber Gasket Jo+hts A.S. T.M. C44J A.S. T.M. C478 Rehf. ----.. Cone. Manhole Seetlons Note: Lift Holes Shall Be Mod In w1h Non -Shrhk Mortar f Precast Inverts Pro Wde - 1' Appraa COmbp Between Ppe And Channel Concrete At Plonetratlon 0 Bed Bose SoctIm In 4' (Mh.) pass B" Conn Or Carpacted Gilwvlar BOW# Motedo% CantbrmIng INDOr sax o2, Site No. 6 Notes- Preformed Bltumon Sto/s, Kent g Sid Or Equal May Be Used Between Ad/f/athg RIngs In Lieu Of Mortar e� a� Nbtert/pht nex/b/e „bhb Shah' Be Res -Sedl (Prke Bros.), Lock dbht (Interpoce Co.), Kor- N -Seol (U.S Class 'A' Cone. Ppe), Or Equal. Cana Fbl `7 ° 4w 4 —_ d CITY OF CARMEL r TYPE I & ii STANDARD DETAILS MANHOLES al« Jenny If" SWO Net To We Dr o.e op �. � 0tve4 NeT« ep Note: Preformed But)Y Rubber StaYant Between MH Adbstk[p Rhps May Be Usrd In Usu Of Cement Mortar Channel Shelf Unless Otherwise OMected onels Mo. I ANUAMU Ut I AILa JtU l IUNAL FLAN �n,r«y If10 twMr Not To fete wen bolors.. i5a.wing No" G4 MH nwne s Cover Neenah R-1042, Or Equal for Ntrf"ghf stallat/ons Neenah R- 1916 -F, Or Equal 1M' Mtn. f7nished / Powrrnont "Ad)/stlnp —N. H10 7hroaded Rod (4 Repd) RAvps • q 2- H*xlh' Preformed Bufyl Rubber Sealant Strps, Concrete SoJlant Inc. r)pe CS -SD? Or Equal In Eoch Joktt. E/ata Precast Concrete Catch Bosh May Be Used /n Lieu Of Masonry Construction Shown. Provide 6' to 12" Of Adbolinp Rhys. not dote Top Of Costknp E /evrrllon As Shown On Drowlnys And Frome Lead To Moh Lho - FLAT GRATE — PLAN Invert Vevat /on- As Requlred ro• I Square 11 a• 4- - Expdn /on t Joht (T 000 r I L Concrete Curb East Jordan 704A or equal CURB GRATE — PLAN �6 j4 0 /2 EW- rop R Batton, SECTION b CITY OF CARMEL CATCH BASIN STANDARD DETAILS DETAIL Dale J«wwy tee soul« Not To two Dro n Ir � Dro.Mq N.. Cti SEWER PIPE 1) ALL SEWtR PIPE SHALL BE PVC PIPE MIN. SVR Jd 2) FAR PIPE 15- INCHES D/AM£7ER AND wALLER. PIPE, nr W4 AND .0N)WO SMIUS SHALL CONFORM ro AS7M 0 -10.74 EXCEPT 7HA r THE STANDARD DYMiN376W RA AO OF 7HE OuME DVAMENR Or 7HE PW TO WALL 7NlCKNESS MALL NOT Exam ,TS J) FAR P/PE /B- INCHES DIAMETER AND LARGER. PIPE f7777NO4 AND ,ON77NO SYSTEMS SHALL CONFORM 712 ASM r -679 WTH A T -1 WALL 7MCKNESS 4) ovr SYSTEMS SHALL Of ELASMWE77/C SEAL (GAS(Er) TYPE.. SEALS SHALL Ca*-O M 70 ASW F-477 REOWREMENIS ,CYNT MATERIALS A/VIO 7ES7WG SHALL CGWfOiRM rO A= D-J212 Aff1Q lPfWNM 5) AU SE'RNCE COWHEC77 NS SHALL BE MADE USNG A WYE ANO A BENID. 7EES SHALL BE USED ONLY AS DIRECTED BY 7HE ary 7ErS AND WYES SHALL BE DYE CAST OR FAC7WY FABRI►CAIED. ALL SERWCE PIPE SHALL Be SW ja 6) CGWN£C77GWS 70 E4S7WNG P/P1NG SHALL BE MADE USNG nE,1 &E REPAIR COUPLINGS BY PFRNCO OR EQUAL. 11140 i NO 00 giawa 4" of imp bf(�4.EIi/t(AfC 0 e� CITY OF CARMEL PIPE STANDARD DETAILS SPECIFICATIONS ■ deee.y IM eve MM To bee pirew er Jw •alt `awl Nre« Ckli ALL WVU MAIN AND SEVER PIPING SHALL BE 71:V D IN ACCORDANCE W17H INDIANA CODE AND IDEM RE MA 17ONS AIR PRffSVRE ACCEPTANCE TEST 1) CQVTRACrOR SHALL PREFORM AN AIR PRESSURE 7ESr ON ALL ORAWTY SEDER PIPE IN ACCORDANCE Wt7H AS7M F -1417 SPECV70A 17ONS T) 7HE GOW7RACr W SHALL FURNISH ALL EOU/PM£NT, MA7ERIALS, LABOR, AND CONDUCT me TfSr UNDER 019S><RVAMN OF drY PERSONAL. J) MrST MEINQQ A) LOW PRESSURE AIR TEST MEltlao SHALL BE WE IWE PRESSURE DROP METHOD, THE PRE3wRE USE'0 IN 7HE 7>rST wAa B£ 7Hf STATED PRESSURE mrAin THAN THE AVE'RAOF BACK PRESSURE OF ANY GROUND WfA TE'R ABOVE THE PIPE: THE 77Mf RETJtIIRED fw 1NE PRESSURE IN THE 7ESr SE'CAAN rO DROP 1.0 pslp SHALL BE MEASWED USING A STW WA 7CN. IF INC AME EXCEEDS WE 77Mf DETERMINED FROM A57M F -1417 7HE SEC770N FAITS FORGE MAIN AND WA7F'R MANN PRESSURE AND LEAKAGE 7FSTS !)AND LEAK TEST ON ALL MAINS UNDER 7Hf LABOR, N AND NA ON OF q7Y P RSONAL RY FAR THE HYDROSTATIC PRESSURE 2) 7ESrS PRESSURE SHALL Of 100 PS OR 150X Or NORMAL PIPE OPERA WO PRESSURE, WH ICH EVER /S GREATER. J) LEAKAGE 7E ST PREsSI'/RE SHALL NOT BE LESS 7NAN 7HE MAXIMUM OPMA IWO PRESSURE' or 7HE PIPE: THE DURA17AN or THE LEAKAAf TEST SMALL NOT BE LESS THAN TWt7 HOURS ALLOWABLE LEAKAGE SHALL NOT EXGIEEO 9 poll?h Or PIPE DIAMETER PER MILE Or PIPE /H 24hr. DE7'LfCIIAN TEST OF PVC SEVER PIPE 1) ,Wj jZ . LAG t1MEC71oN- &T'ORE fWAL ACCEPTANCE OF SEWER L#VES; ALL SCC77ONS Of' SENfR PIPE 6- INCHES AND LARGER SPEC0E0 DIAMETER SHALL Of MEASURED FOR WR77M RING DinfCP W BY THE CONTRACTOR AND W7NESSED BY THE Pry. MAXIMUM DEFLECAON UNDER FULL LOAD SHALL NOr EYAE£D 5X Or WE ASW DESYGNATED AWRAGEE INSYDE DIAMETFR AS DE7SRM#VED BY THE LABORATORY FOR THE SFEGYf/ED PbP/IVGi J) rAIL lRES- SHOULD A PIPE EXCEED 7HE ALLOWABLE D£fIEVM,, THE CON7RACTOR SHALL REPLACE 7HOSE PIPES AND RETLcST THE SEC17CW J) EYX/1WWr- IrS7)NO SHALL BE GO -NO -GO PULL 7HR000H OAGES OF A TYPE APPROVED BY THE Q?Y A METAL OR PLASTIC GAUGING RWO OF O/AMET£R EOUAL 70 95X Or THE SPECIM AVERAGE WAX PIPE D/AMiF SHALL BE 107H EACH GAGE: 4) THE CONTRACTOR SHALL fURN/SH 7EST7NG E'QUlPMENr AND PERSGWNEI AND M irWM 7Hf REWIRED 7ESTS: 7ES7:S MUST Be WITNESSED BY ary PERSONNEL. 5) USE Or MECHANICAL PULLING DEWAES /S NOT PeRmI rro. tlnn B) DEREC770W 7ES77HO SHALL NOT BE PEwoRMEO UNTIL THE CITY OF CARMEL TESTATI COMPLETED AND ACCEP7E 7R�f7VCH BACKML HAS BEEN STANDARD DETAILS SPECIFICATIONS IN PLACE FOR AT LEAST SO D Y1 cats Jw%wy n�eo �w. N,� T. w. e,,, y, w4 1k..4rq N«n« ma L e e CONCRETE SPECIFICATIONS 1) MATERIALS A) CEMENT: ASW C150 TYPE / OR # B) AOMEGA IE.• AS 7M CJJ C) ADM /X7URES• 1. AIR &MA /NING.• ASTM C160 Z neiR.• AASY•170 M2 :1 J PROM /B/Tf0 ADM I=RES C�TAIN#VG MOREETNAN a05X MLaNDf Ol STURES ARE NOT Amur 7E0 D) GLASS A CGWGyPE7E SHALL BE AS FMLOW37 28 -DAY CAMPRE/SgSTEI�E STRENOW (PST) 1300 RA w a 45 MINI MaviwT CANTE7VT T (POUNDS/CY) 564 stump (INCHES) 2-4 AIR CONTENT 6. ox f) PRE`MOCOfO .oNr n7LLER: ASPHALT 77PE IN CONFORMANCE Wt7H ASW D994, W.R. MEADOWS SEAL 710H4,, GYP EOUAI, F) REINFORCING BARS• ASW A615 OR ASW A816, &TADE 60 =0' a Powment ---- -- Select Excavated Materlol Or Sooc/ol �1 Approved Excavated Material Bockf#1 Hand Tomped In 6' Loyers Unless Otherwise Directed Note: Select Excavated Mater/ol Or Special Bockfill Shall Be Placed Under All Pavements And Wfthln The Lknils Shown Above. Special 8ock/1ll Shall Conform To /NDOT 211.02h Select Excavated Material Shall Be Approved By Enpineer. Sir to In' Mtn, finished V'w t -0' Povanrnf _ ment Mortar f,-tw /sthp RMps !785'A in. 12' Max. J' -J' Relnl. Concrete till Eeernlrie Cone 21-S' Top A.S. T.M. C478 id' Note: 5' -0' Dlo. M.H. 's J' 6' Require rrans /t/on r)Po I- Sections. 4' -0' D/a for W Sewers 18' J -11" it Smoller Precast Bose - Section r}Pr y_ A.S. rM, C478 1' -0 Dka far a Sower 21' I 3' -60 & JO' 6' Nbtert/pht nex/b/e „bhb Shah' Be Res -Sedl (Prke Bros.), Lock dbht (Interpoce Co.), Kor- N -Seol (U.S Class 'A' Cone. Ppe), Or Equal. Cana Fbl `7 ° 4w 4 —_ d CITY OF CARMEL r TYPE I & ii STANDARD DETAILS MANHOLES al« Jenny If" SWO Net To We Dr o.e op �. � 0tve4 NeT« ep Note: Preformed But)Y Rubber StaYant Between MH Adbstk[p Rhps May Be Usrd In Usu Of Cement Mortar Channel Shelf Unless Otherwise OMected onels Mo. I ANUAMU Ut I AILa JtU l IUNAL FLAN �n,r«y If10 twMr Not To fete wen bolors.. i5a.wing No" G4 MH nwne s Cover Neenah R-1042, Or Equal for Ntrf"ghf stallat/ons Neenah R- 1916 -F, Or Equal 1M' Mtn. f7nished / Powrrnont "Ad)/stlnp —N. H10 7hroaded Rod (4 Repd) RAvps • q 2- H*xlh' Preformed Bufyl Rubber Sealant Strps, Concrete SoJlant Inc. r)pe CS -SD? Or Equal In Eoch Joktt. E/ata Precast Concrete Catch Bosh May Be Used /n Lieu Of Masonry Construction Shown. Provide 6' to 12" Of Adbolinp Rhys. not dote Top Of Costknp E /evrrllon As Shown On Drowlnys And Frome Lead To Moh Lho - FLAT GRATE — PLAN Invert Vevat /on- As Requlred ro• I Square 11 a• 4- - Expdn /on t Joht (T 000 r I L Concrete Curb East Jordan 704A or equal CURB GRATE — PLAN �6 j4 0 /2 EW- rop R Batton, SECTION b CITY OF CARMEL CATCH BASIN STANDARD DETAILS DETAIL Dale J«wwy tee soul« Not To two Dro n Ir � Dro.Mq N.. Cti SEWER PIPE 1) ALL SEWtR PIPE SHALL BE PVC PIPE MIN. SVR Jd 2) FAR PIPE 15- INCHES D/AM£7ER AND wALLER. PIPE, nr W4 AND .0N)WO SMIUS SHALL CONFORM ro AS7M 0 -10.74 EXCEPT 7HA r THE STANDARD DYMiN376W RA AO OF 7HE OuME DVAMENR Or 7HE PW TO WALL 7NlCKNESS MALL NOT Exam ,TS J) FAR P/PE /B- INCHES DIAMETER AND LARGER. PIPE f7777NO4 AND ,ON77NO SYSTEMS SHALL CONFORM 712 ASM r -679 WTH A T -1 WALL 7MCKNESS 4) ovr SYSTEMS SHALL Of ELASMWE77/C SEAL (GAS(Er) TYPE.. SEALS SHALL Ca*-O M 70 ASW F-477 REOWREMENIS ,CYNT MATERIALS A/VIO 7ES7WG SHALL CGWfOiRM rO A= D-J212 Aff1Q lPfWNM 5) AU SE'RNCE COWHEC77 NS SHALL BE MADE USNG A WYE ANO A BENID. 7EES SHALL BE USED ONLY AS DIRECTED BY 7HE ary 7ErS AND WYES SHALL BE DYE CAST OR FAC7WY FABRI►CAIED. ALL SERWCE PIPE SHALL Be SW ja 6) CGWN£C77GWS 70 E4S7WNG P/P1NG SHALL BE MADE USNG nE,1 &E REPAIR COUPLINGS BY PFRNCO OR EQUAL. 11140 i NO 00 giawa 4" of imp bf(�4.EIi/t(AfC 0 e� CITY OF CARMEL PIPE STANDARD DETAILS SPECIFICATIONS ■ deee.y IM eve MM To bee pirew er Jw •alt `awl Nre« Ckli ALL WVU MAIN AND SEVER PIPING SHALL BE 71:V D IN ACCORDANCE W17H INDIANA CODE AND IDEM RE MA 17ONS AIR PRffSVRE ACCEPTANCE TEST 1) CQVTRACrOR SHALL PREFORM AN AIR PRESSURE 7ESr ON ALL ORAWTY SEDER PIPE IN ACCORDANCE Wt7H AS7M F -1417 SPECV70A 17ONS T) 7HE GOW7RACr W SHALL FURNISH ALL EOU/PM£NT, MA7ERIALS, LABOR, AND CONDUCT me TfSr UNDER 019S><RVAMN OF drY PERSONAL. J) MrST MEINQQ A) LOW PRESSURE AIR TEST MEltlao SHALL BE WE IWE PRESSURE DROP METHOD, THE PRE3wRE USE'0 IN 7HE 7>rST wAa B£ 7Hf STATED PRESSURE mrAin THAN THE AVE'RAOF BACK PRESSURE OF ANY GROUND WfA TE'R ABOVE THE PIPE: THE 77Mf RETJtIIRED fw 1NE PRESSURE IN THE 7ESr SE'CAAN rO DROP 1.0 pslp SHALL BE MEASWED USING A STW WA 7CN. IF INC AME EXCEEDS WE 77Mf DETERMINED FROM A57M F -1417 7HE SEC770N FAITS FORGE MAIN AND WA7F'R MANN PRESSURE AND LEAKAGE 7FSTS !)AND LEAK TEST ON ALL MAINS UNDER 7Hf LABOR, N AND NA ON OF q7Y P RSONAL RY FAR THE HYDROSTATIC PRESSURE 2) 7ESrS PRESSURE SHALL Of 100 PS OR 150X Or NORMAL PIPE OPERA WO PRESSURE, WH ICH EVER /S GREATER. J) LEAKAGE 7E ST PREsSI'/RE SHALL NOT BE LESS 7NAN 7HE MAXIMUM OPMA IWO PRESSURE' or 7HE PIPE: THE DURA17AN or THE LEAKAAf TEST SMALL NOT BE LESS THAN TWt7 HOURS ALLOWABLE LEAKAGE SHALL NOT EXGIEEO 9 poll?h Or PIPE DIAMETER PER MILE Or PIPE /H 24hr. DE7'LfCIIAN TEST OF PVC SEVER PIPE 1) ,Wj jZ . LAG t1MEC71oN- &T'ORE fWAL ACCEPTANCE OF SEWER L#VES; ALL SCC77ONS Of' SENfR PIPE 6- INCHES AND LARGER SPEC0E0 DIAMETER SHALL Of MEASURED FOR WR77M RING DinfCP W BY THE CONTRACTOR AND W7NESSED BY THE Pry. MAXIMUM DEFLECAON UNDER FULL LOAD SHALL NOr EYAE£D 5X Or WE ASW DESYGNATED AWRAGEE INSYDE DIAMETFR AS DE7SRM#VED BY THE LABORATORY FOR THE SFEGYf/ED PbP/IVGi J) rAIL lRES- SHOULD A PIPE EXCEED 7HE ALLOWABLE D£fIEVM,, THE CON7RACTOR SHALL REPLACE 7HOSE PIPES AND RETLcST THE SEC17CW J) EYX/1WWr- IrS7)NO SHALL BE GO -NO -GO PULL 7HR000H OAGES OF A TYPE APPROVED BY THE Q?Y A METAL OR PLASTIC GAUGING RWO OF O/AMET£R EOUAL 70 95X Or THE SPECIM AVERAGE WAX PIPE D/AMiF SHALL BE 107H EACH GAGE: 4) THE CONTRACTOR SHALL fURN/SH 7EST7NG E'QUlPMENr AND PERSGWNEI AND M irWM 7Hf REWIRED 7ESTS: 7ES7:S MUST Be WITNESSED BY ary PERSONNEL. 5) USE Or MECHANICAL PULLING DEWAES /S NOT PeRmI rro. tlnn B) DEREC770W 7ES77HO SHALL NOT BE PEwoRMEO UNTIL THE CITY OF CARMEL TESTATI COMPLETED AND ACCEP7E 7R�f7VCH BACKML HAS BEEN STANDARD DETAILS SPECIFICATIONS IN PLACE FOR AT LEAST SO D Y1 cats Jw%wy n�eo �w. N,� T. w. e,,, y, w4 1k..4rq N«n« ma L e e CONCRETE SPECIFICATIONS 1) MATERIALS A) CEMENT: ASW C150 TYPE / OR # B) AOMEGA IE.• AS 7M CJJ C) ADM /X7URES• 1. AIR &MA /NING.• ASTM C160 Z neiR.• AASY•170 M2 :1 J PROM /B/Tf0 ADM I=RES C�TAIN#VG MOREETNAN a05X MLaNDf Ol STURES ARE NOT Amur 7E0 D) GLASS A CGWGyPE7E SHALL BE AS FMLOW37 28 -DAY CAMPRE/SgSTEI�E STRENOW (PST) 1300 RA w a 45 MINI MaviwT CANTE7VT T (POUNDS/CY) 564 stump (INCHES) 2-4 AIR CONTENT 6. ox f) PRE`MOCOfO .oNr n7LLER: ASPHALT 77PE IN CONFORMANCE Wt7H ASW D994, W.R. MEADOWS SEAL 710H4,, GYP EOUAI, F) REINFORCING BARS• ASW A615 OR ASW A816, &TADE 60 =0' a Powment ---- -- Select Excavated Materlol Or Sooc/ol �1 Approved Excavated Material Bockf#1 Hand Tomped In 6' Loyers Unless Otherwise Directed Note: Select Excavated Mater/ol Or Special Bockfill Shall Be Placed Under All Pavements And Wfthln The Lknils Shown Above. Special 8ock/1ll Shall Conform To /NDOT 211.02h Select Excavated Material Shall Be Approved By Enpineer. Sir to I 'W'` I .1' -9" V'w t -0' or 4' p, P-1, f,-tw 4' r0' J =6' J' -J' 4' till 1, -10 21-S' 4' id' J' -0' J' 6' N" Thor W t!' J -11" J' -4' 6" J4" 1 4' -J' Jt•6' 6- J7" I 3' -60 1,11' 6' JO' 5-9w 4�_ jw $a Js• e� -J- s �i• 6. �4J' a =r1• e' 6' Layrfe'ro Ppe cetnlwfhe 7, -4. p" t7t " fro' 6 -0" ___. �_ 6' 6e" 0. -r' e' 71" 6' -6" t0' 76" !D =J" t 0" I =0' MhAnum — thoYttunbed ptvurtd ExlttAgp Pewmont Sae cvt strepnt Eee spoo/e/ BMW lhdr Powmont 4iwt 0*8 Or Mole EYd"If Twwod h 6' Ldl4v, 4;eom foaimy Shay con mrin to bteor tu.otb TRENCH SCHEDULE we rab/i Is rr AS7M O -JOJA Nall Th1anets Clove Mkt JO rr 6'-!S" Me' ASIA! F-970 1W lhhatneov Wen r-1 fbr 16 =Jdt fr arbor noxhle Ppµ Mhh►Wn 7hnoh Wdth V' Shd MOet Mowlcotww'a RoWlrements. undetw6#4 £rte I i Alotrla/ Md 7 h>rtrtao rAwvw unn CITY OF CARMEL TRENCH DETAIL & STANDARD DETAILS 'TRENCH SCHEDULE Dele: ja" I NY too* hall Not re fool. Drown In 'b0" Nmrr D,owh Nam*: Cw! [nglnsu,, Nt. q A MIN. 6" DIA. PIPE CLEANOUT SHALL BE INSTALLED WITHIN THREE (3) FEET OF OUTSIDE BUILDING WALL. A PLUG SPECIFIED BY THE PIPE MANUFACTURER SHALL BE USED TO ENSURE 100° WATERTIGHTNESS. 1 1/8 BEND S FROM BUILDING (TYPICAL) TRUNK LINE LATERAL MINIMUM SIZE = 6" �1 /8 BEND BUILDING LATERAL MINIMUM SIZE = 6" COMPACTION OF GRANULAR BACKFILL IS CRITICAL UNDER WYE AND BEND. IF PROPER COMPACTION CANNOT BE ACHIEVED, PLACE A MIN. OF 6" OF CLASS B CONCRETE AROUND 1/8 BEND. SERVICE WYE PLAN VIEW 1" C. I. LOCATOR ROD OR MAGNETIC TAPE INSTALLED PER SECTION 7.02 -C ALL = _ 30° btLL HULtb bNALL BE PROVIDED UNDER PIPE 00 �NAN . P 1" SURFACE #11 OR #12 ��P � \STE 'y0�► W..-O 3" BINDER #9 %i0. * ` 10000418 STATE OF •/ �'�`'•'• /NDIA10- - "' 8" BASE #5D F�s)ONAL .' WELL COMPACTED, WELL DRAINED SUBGRADE TYPICAL PAVEMENT SECTION WITHIN RIGHT —OF —WAY VARIFq IgFF PI ANSI ELEVATION C? SERVICE CONNECTION FOR SHALLOW SEWERS (LESS THAN 15' DEEP) DW POINT F GUTTER 0.5" 'RADE AGGREGATE H VARIES NOTES: EXPANSION JOINTS ARE REQU :RED AT STORM INLETS. CONTRACTION JOINTS SHOULD BE INSTALLED AT 10 FOOT SPACINGS. SPACING SHALL BE 5 FEET ON CURVE RADII. CONTRACTION JOINTS SHALL BE _TOOLED OR SAWN IN CONTINUOUSLY POURED CURBS TO A DEPTH OF V2" MINIMUM. TYPICAL ROLL CURB DETAIL WITH REVERSED SLOPE GUTTER a oe INTEGRAL WALK AND CURB DETAIL T TACTILE WARNING ON BASE C04" CONCRETE SLAB ON FILL ­i° + SECTION A--A HANDICAPPED RAMP DETAIL FROM 6" CURB S. SN V�•''C,�sTE''••F� * ' 19800417 ���FS •!II!DI AN�.•�'G��� .n 2 CC Q U) (D 3;: 0 co w Q C) CM �L c CL OB W tr a � Q £xconoted A/otrAv h fhpowd Q Artov LfMots Ofhwvko Ot octod II Q _ 0 Ne/w Lhder £x/sthp Sear.rt Mar Lhoo, Z V Got Lhor, TM�oAono Aa le And' t. Y. J W voetrkal co &#46 0000 INfh & w/r sedwf Metwiw to The Cenfrr/ho Of fie 0doithp Uiflfy Thor W Q for l�exblo Ppe MINI U/d Or ProAlo, WaNt eJ Q Oronulr AodA p MetwAol Shot Be P/ocod 0 --. And Hand romped h 0 Lows To A MhMum Q W Of i =O' Abow Pot ,.� ••. ;;,� :• � •oi• Bed Ppe h *#441od f,Yonular IL Beo'dhp MetrlW Hond romped M 6' Layrfe'ro Ppe cetnlwfhe 8edslhp Meterlal Sha# Carnwm "M' "a t/' At To /HOOT ACUOt, Sko No. 6 Tcp 0/ Ppe }` . No 1. W N the ANX4'"UM MWM fr np/d Ppes. 'U' to 7Ae Alhbnym NWth rr nex,bh Ppos In Aocardanoe Wth ASW 0 -tJ 21. unn CITY OF CARMEL TRENCH DETAIL & STANDARD DETAILS 'TRENCH SCHEDULE Dele: ja" I NY too* hall Not re fool. Drown In 'b0" Nmrr D,owh Nam*: Cw! [nglnsu,, Nt. q A MIN. 6" DIA. PIPE CLEANOUT SHALL BE INSTALLED WITHIN THREE (3) FEET OF OUTSIDE BUILDING WALL. A PLUG SPECIFIED BY THE PIPE MANUFACTURER SHALL BE USED TO ENSURE 100° WATERTIGHTNESS. 1 1/8 BEND S FROM BUILDING (TYPICAL) TRUNK LINE LATERAL MINIMUM SIZE = 6" �1 /8 BEND BUILDING LATERAL MINIMUM SIZE = 6" COMPACTION OF GRANULAR BACKFILL IS CRITICAL UNDER WYE AND BEND. IF PROPER COMPACTION CANNOT BE ACHIEVED, PLACE A MIN. OF 6" OF CLASS B CONCRETE AROUND 1/8 BEND. SERVICE WYE PLAN VIEW 1" C. I. LOCATOR ROD OR MAGNETIC TAPE INSTALLED PER SECTION 7.02 -C ALL = _ 30° btLL HULtb bNALL BE PROVIDED UNDER PIPE 00 �NAN . P 1" SURFACE #11 OR #12 ��P � \STE 'y0�► W..-O 3" BINDER #9 %i0. * ` 10000418 STATE OF •/ �'�`'•'• /NDIA10- - "' 8" BASE #5D F�s)ONAL .' WELL COMPACTED, WELL DRAINED SUBGRADE TYPICAL PAVEMENT SECTION WITHIN RIGHT —OF —WAY VARIFq IgFF PI ANSI ELEVATION C? SERVICE CONNECTION FOR SHALLOW SEWERS (LESS THAN 15' DEEP) DW POINT F GUTTER 0.5" 'RADE AGGREGATE H VARIES NOTES: EXPANSION JOINTS ARE REQU :RED AT STORM INLETS. CONTRACTION JOINTS SHOULD BE INSTALLED AT 10 FOOT SPACINGS. SPACING SHALL BE 5 FEET ON CURVE RADII. CONTRACTION JOINTS SHALL BE _TOOLED OR SAWN IN CONTINUOUSLY POURED CURBS TO A DEPTH OF V2" MINIMUM. TYPICAL ROLL CURB DETAIL WITH REVERSED SLOPE GUTTER a oe INTEGRAL WALK AND CURB DETAIL T TACTILE WARNING ON BASE C04" CONCRETE SLAB ON FILL ­i° + SECTION A--A HANDICAPPED RAMP DETAIL FROM 6" CURB S. SN V�•''C,�sTE''••F� * ' 19800417 ���FS •!II!DI AN�.•�'G��� .n 2 CC Q U) (D 3;: 0 co w Q C) CM �L c CL OB W tr a � Q z Q Q II Q _ 0 W Z V t. Y. J W u o� Q W Q z eJ Q 0 Q W Q Wo IL Mgt W F V tI� Z V tJ c'n C Y �1' 0- LL h•wi } Z Qr z N � N w u°ovr� co Uri P z cis Z un 00 m LL .4 a a c IG Cr A u s CL t].. DATE: JULY 23,1999 SCALE: 1" 40' PROJECT NO. 111-1187 SHEET NO. 0108 1187det.dgn