Loading...
HomeMy WebLinkAboutP-1F0_ I F Fol G...._....... CO ACCU -3 ACCU -2 ACCU -4 ACCU -6 ACCU -7 ° ^ - ....... SCALE: 1/8 " =1' -0" Ro Ro F0_ I RO ACCU -1 ACCU -3 ACCU -5 ACCU -8 F0_ oF01a _ .._ ACCU -9 ACCU -10 ACCU -11 ACCU -12 Fol ACCU -13 CO Pinnacle Inc . v A Consulting Group 501 FLETCHER AVENUE FLETCHER POINTE BUILDING -T A w, A- TO TATTIT A AT A Af'in2 SECOND FLOOR PLUMBING SCALE: 1/8 " =1' -0" Copyright 2002 All designs appearing herein shall not be duplicated, produced, or otherwise used without the written consent of DKO Architecture, PC LOW POINT OF 4° CORRUGATED PERF. ......... FLEXIBLE ....... ... . 3 3 z DRAINAGE c-) a Cn TILE, TO SUMP 1" CW WC —H PIT, REFER TO �N WC —H 1104 U —H STRUCTURAL L -H 1. -.. CW......:::: L -H FIRST FLOOR PLUMBING SCALE: 1/8 " =1' -0" -�. _ .._ V. CW. t 2' HW ............ ... 1... C :FD -2 ,........ ... 1' 2 HYV / W FD 2 REFER TO BASEMENT WATER FROM SUMP 3° PUMPED GROUND `.. - ....... WATER FROM SUMP FOR GAS CONTINAl10N HIGH POINT IF PUMP, PUMP TO A PUMP, PUMP TO A ........ O NEW GAS SERVICE, 800 MBH ......... CONTACT ... 3 v v WH1 POSSIBLE AND Q. ..... CONNECTED LOAD, ............... ....... ...... 3 TERMINATION WITH c�0u U VC)...... LOCAL GAS COMPANY PRIOR TO ................. ' ....... v _ :::::.......... STEEL HARDWARE OPENING, REFER TO BIDDING FOR EXACT INSTALLATION FOUNDATION PLUMBING CLOTH OVER SITE UTILITIY ,'A OPENING, REFER TO DRAWINGS FOR AND COORDINATION. INCLUDE SCALE: 1/8 " =1' -0" SITE UTILITIY M ........................ DRAWINGS FOR ....... ... . i. ALL FEES IN BID FOR THIS kb- -G CONTINUATION AND GRADE/ELEVATIONS GRADE /ELEVATIONS Z ..... INSTALLATION. ... REFER TO SITE UTILITY DRAWING FOR EXTEND 3/8° COLD �' V STACK _ CONTINUATION OF THIS SERVICE - WATER LINE TO HEADER UP `� = a ................. COFFEE MAKER SK- a . :A TsSI Q 1 1 /2° G .........:::: ......:........................ FD -2. o o FD -2 z ...... . - 5 .. F -7 ..,. ILE ** *NOTE: ROUTE CONDENSATE LINES _ FROM FURNACE UNIT THIS FLOOR 1 1/2° G TO ADJACENT FLOOR DRAIN ............ ... .. ......... SK -A :.. V............... ............... ;.. ............................... FIRST FLOOR PLUMBING SCALE: 1/8 " =1' -0" -�. _ .._ .......... 3° PUMPED GROUND WATER FROM SUMP 3° PUMPED GROUND 2" PUMPED GROUND PUMP, PUMP TO A WATER FROM SUMP - - WATER FROM SUMP HIGH POINT IF PUMP, PUMP TO A PUMP, PUMP TO A POSSIBLE AND HIGH POINT IF .................... ......................................... ............................... HIGH POINT IF GRAVITY TO SWAIL POSSIBLE AND POSSIBLE AND TERMINATION WITH GRAVITY TO SWAIL GRAVITY TO SWAIL ANIMAL STAINSLESS TERMINATION WITH TERMINATION WITH S ANIMAL STAINSLESS ANIMAL STAINSLESS CLOTH OVERRE STEEL HARDWARE STEEL HARDWARE OPENING, REFER TO CLOTH OVER FOUNDATION PLUMBING CLOTH OVER SITE UTILITIY OPENING, REFER TO OPENING, REFER TO DRAWINGS FOR SITE UTIUTIY SCALE: 1/8 " =1' -0" SITE UTILITIY CONTINUATION AND DRAWINGS FOR DRAWINGS FOR GRADE /ELEVATIONS CONTINUATION AND CONTINUATION AND GRADE/ELEVATIONS GRADE /ELEVATIONS FPWH -A +18° ABOVE GRADE PLUMBING GENERAL NOTES: A .ALL DOMESTIC SUPPLY PIPING SHALL BE COPPER TYPE L, LEAD FREE SWEAT JOINTS. B ALL SANITARY WASTE AND VENT PIPING SHALL BE PVC, SCHEDULE 40, GLUE JOINT. INSULATE TO MEET 25/50 SMOKEIFLAME RATING IN ALL RETURN AIR PLENUM SPACES. C .FIRESTOP ALL FIRE RATED BARRIERS PENETRAIONS. D .PROVIDE KNEE INSULATION KITS UNDER ALL LAVATORIES FOR ADA COMPLIANCE. E .PROVIDE QUARTER STOP SHUT -OFF VALVES AT EACH FIXTURE. F .INSULATE WITH VAPER BARRIER ALL DOMESTIC HOT AND COLD WATER PIPES ENTIRELY FOR CONDENSATION AND ENERGY PURPOSES. G .ALL FIXTURE FAUCETS SHALL BE ANTI -SCALD TYPE. H .ALL FIXTURES IN KITCHENS, MOP SINKS, AND HOSE BIBBS/WALL HYDRANTS SHALL HAVE INTEGRAL VACUUM BREAKERS. I .ALL PLUMBING INSTALLATION SHALL MEET LOCAL, STATE, AND FEDERAL CODES HAVING JURISDICTION. J .SLOPE ALL SANITARY PIPING INSIDE BUILDING 1/8" PER FOOT UNLESS REQUIRED OTHERWISE. K .DO NOT ROUTE ANY PIPES DIRECTLY OVER ELECTRICAL PANELS OR THROUGH DEDICATED ELEVATOR SPACES. U aooa e � C U O „U Cn mom 5� Ube t U �w¢ zQz �ow a� x D d A 920246 a / / /jam �iS' �hq �iriiTli�i UT �*`•`` l.~ \ \�� Phase Date CD 04/18/05 0 0 Project No. Drawn by: 0410 MJHAROLD P1