HomeMy WebLinkAboutP-1F0_ I
F
Fol
G...._.......
CO
ACCU -3
ACCU -2
ACCU -4
ACCU -6
ACCU -7
° ^
- .......
SCALE: 1/8 " =1' -0"
Ro
Ro
F0_ I
RO
ACCU -1
ACCU -3
ACCU -5
ACCU -8
F0_
oF01a
_ .._
ACCU -9
ACCU -10
ACCU -11
ACCU -12
Fol
ACCU -13
CO
Pinnacle Inc .
v
A Consulting Group
501 FLETCHER AVENUE FLETCHER POINTE BUILDING
-T A w, A- TO TATTIT A AT A Af'in2
SECOND FLOOR PLUMBING
SCALE: 1/8 " =1' -0"
Copyright 2002
All designs appearing
herein shall not be
duplicated, produced,
or otherwise used
without the written
consent of
DKO Architecture, PC
LOW POINT OF 4°
CORRUGATED
PERF. .........
FLEXIBLE ....... ... .
3 3 z
DRAINAGE c-) a
Cn
TILE, TO SUMP 1" CW
WC —H
PIT, REFER TO �N WC —H 1104 U —H
STRUCTURAL
L -H 1. -.. CW......:::: L -H
FIRST FLOOR PLUMBING
SCALE: 1/8 " =1' -0"
-�.
_ .._
V. CW.
t 2' HW ............ ...
1... C :FD -2 ,........ ...
1' 2 HYV
/
W FD 2
REFER TO BASEMENT
WATER FROM SUMP
3° PUMPED GROUND
`..
- .......
WATER FROM SUMP
FOR GAS CONTINAl10N
HIGH POINT IF
PUMP, PUMP TO A
PUMP, PUMP TO A
........
O
NEW GAS SERVICE, 800 MBH .........
CONTACT
...
3
v v WH1
POSSIBLE AND
Q. .....
CONNECTED LOAD, ...............
....... ......
3
TERMINATION WITH
c�0u U
VC)......
LOCAL GAS COMPANY PRIOR TO .................
' .......
v _
:::::..........
STEEL HARDWARE
OPENING, REFER TO
BIDDING FOR EXACT INSTALLATION
FOUNDATION PLUMBING CLOTH OVER
SITE UTILITIY
,'A
OPENING, REFER TO
DRAWINGS FOR
AND COORDINATION. INCLUDE
SCALE: 1/8 " =1' -0" SITE UTILITIY
M
........................
DRAWINGS FOR
....... ... .
i.
ALL FEES IN BID FOR THIS kb- -G
CONTINUATION AND
GRADE/ELEVATIONS
GRADE /ELEVATIONS
Z .....
INSTALLATION.
...
REFER TO SITE UTILITY DRAWING FOR
EXTEND 3/8° COLD
�' V STACK
_
CONTINUATION OF THIS SERVICE -
WATER LINE TO
HEADER UP
`� = a
.................
COFFEE MAKER
SK-
a
.
:A
TsSI
Q
1 1 /2° G
.........:::: ......:........................
FD -2.
o
o
FD -2
z ...... .
-
5
..
F -7
..,.
ILE
** *NOTE: ROUTE CONDENSATE LINES
_
FROM FURNACE UNIT THIS FLOOR
1 1/2° G
TO ADJACENT FLOOR DRAIN
............
... .. .........
SK -A
:..
V...............
............... ;.. ...............................
FIRST FLOOR PLUMBING
SCALE: 1/8 " =1' -0"
-�.
_ .._
..........
3° PUMPED GROUND
WATER FROM SUMP
3° PUMPED GROUND
2" PUMPED GROUND
PUMP, PUMP TO A
WATER FROM SUMP
- - WATER FROM SUMP
HIGH POINT IF
PUMP, PUMP TO A
PUMP, PUMP TO A
POSSIBLE AND
HIGH POINT IF
....................
......................................... ............................... HIGH POINT IF
GRAVITY TO SWAIL
POSSIBLE AND
POSSIBLE AND
TERMINATION WITH
GRAVITY TO SWAIL
GRAVITY TO SWAIL
ANIMAL STAINSLESS
TERMINATION WITH
TERMINATION WITH
S
ANIMAL STAINSLESS
ANIMAL STAINSLESS
CLOTH OVERRE
STEEL HARDWARE
STEEL HARDWARE
OPENING, REFER TO
CLOTH OVER
FOUNDATION PLUMBING CLOTH OVER
SITE UTILITIY
OPENING, REFER TO
OPENING, REFER TO
DRAWINGS FOR
SITE UTIUTIY
SCALE: 1/8 " =1' -0" SITE UTILITIY
CONTINUATION AND
DRAWINGS FOR
DRAWINGS FOR
GRADE /ELEVATIONS
CONTINUATION AND
CONTINUATION AND
GRADE/ELEVATIONS
GRADE /ELEVATIONS
FPWH -A
+18° ABOVE
GRADE
PLUMBING GENERAL NOTES:
A .ALL DOMESTIC SUPPLY PIPING SHALL BE COPPER TYPE L, LEAD FREE SWEAT JOINTS.
B ALL SANITARY WASTE AND VENT PIPING SHALL BE PVC, SCHEDULE 40, GLUE JOINT.
INSULATE TO MEET 25/50 SMOKEIFLAME RATING IN ALL RETURN AIR PLENUM SPACES.
C .FIRESTOP ALL FIRE RATED BARRIERS PENETRAIONS.
D .PROVIDE KNEE INSULATION KITS UNDER ALL LAVATORIES FOR ADA COMPLIANCE.
E .PROVIDE QUARTER STOP SHUT -OFF VALVES AT EACH FIXTURE.
F .INSULATE WITH VAPER BARRIER ALL DOMESTIC HOT AND COLD WATER PIPES ENTIRELY
FOR CONDENSATION AND ENERGY PURPOSES.
G .ALL FIXTURE FAUCETS SHALL BE ANTI -SCALD TYPE.
H .ALL FIXTURES IN KITCHENS, MOP SINKS, AND HOSE BIBBS/WALL HYDRANTS SHALL HAVE
INTEGRAL VACUUM BREAKERS.
I .ALL PLUMBING INSTALLATION SHALL MEET LOCAL, STATE, AND FEDERAL CODES HAVING
JURISDICTION.
J .SLOPE ALL SANITARY PIPING INSIDE BUILDING 1/8" PER FOOT UNLESS REQUIRED OTHERWISE.
K .DO NOT ROUTE ANY PIPES DIRECTLY OVER ELECTRICAL PANELS OR THROUGH DEDICATED
ELEVATOR SPACES.
U
aooa
e � C
U O
„U
Cn
mom
5�
Ube
t
U
�w¢
zQz
�ow
a�
x
D
d
A
920246 a
/ / /jam �iS' �hq �iriiTli�i UT �*`•`` l.~ \ \��
Phase Date
CD 04/18/05
0
0
Project No. Drawn by:
0410 MJHAROLD
P1