HomeMy WebLinkAbout05050111.13o; a CN U. 0 0 N N U 0 M 0 in 0 0 a 0 W 0 a 0 a U N F O J a CLAY TOWNSHIP SANITARY SEWER SPECIFICATIONS 1. Standard specifications of the District and Indiana Department of Transportation shall apply for all work and materials. Pipe shall be installed in accordance with Section 715. 2. Sanitary sewer pipe shall be PVC in accordance with ASTM D -3034 (S,D.R. 35) and ASTM 2321. PVC pipe shall have grooved bell and gasket. The pipe shall be made of PVC plastic having a cell classification of 12454B. 3. PVC sewer fittings shall conform to the requirements of ASTM D- 3034 -89 specification. Fittings in sizes through 8" shall be molded in one piece with elastomeric joints and minimum socket depths as specified in sections 6.2 and 7.3.2. Fittings 10" and larger shall be molded or fabricated in accordance with section 7.11 with manufacturers standard pipe bells and gaskets. Wall thickness of fittings :3hail be SDR 26 as defined in section 7.4.1 of specifications. Gaskets for elastomeric joints shall be molded with a minimum crasssectionai area of 0.20 square inches and conform to ASTM F -477 specification. Fittings shall be manufactured by Harco or equal. 4. All sanitary manholes shall be precast concrete manholes in accordance with ASTM C -478 and Section 720. 0 -rings shall conform to C -443. Kent Seal or equivalent shall also be applied to all joints and between riser rings and castings. kt,anhole step spacing shall be no more than 16- inches. Manholes shall be air tested for leakage in accordance with ASTM C1244 -93, Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test. A. Installation and operation of vacuum equipment and indicating devices must be in accordance with manufacturers recommendations and performance specifications which have been provided by the manufacturer and accepted by the Engineer. The vacuum equipment must be capable of testing the entire manhole, including the casting and riser rings. B. With the vacuum tester set in place: 1. Connect the vacuum pump to the outlet port with the valve open. 2. Draw a vacuum of ten (10) inches of Hg. and close the valve. C. Accepted standards for leakage will be established from the elapsed time for a negative pressure change from ten (10) inches to nine (9) inches of mercury. The maximum allowable leakage rate for a four (4) foot diameter manhole must be in accordance with the following: Minimum Elapsed Time for a Manhole Depth Pressure Change of 1 Inch Hg 10 feet or less 60 seconds >10 feet but <15 feet 75 seconds >15 feet but <25 feet 90 seconds For manholes five (5) feet in diameter, add an additional fifteen (15) seconds and for manholes six (6) feet in diameter, add on additional thirty (30) seconds to the time requirements for four (4) foot diameter manholes. For all manholes deeper than twenty -five (25) feet, the Engineer will determine the applicable minimum elapsed time. D. If the manhole fails the test, necessary repairs must be made and the vacuum test and repairs must be repeated until the manhole passes the test. E. If manhole joint sealants are pulled out during the vacuum test, the manhole must be disassembled and the joint sealants replaced. F. Manholes will be subject to visual inspection with all visual leaks being repaired. 5. Butyl rubber coating shall be applied around each manhole joint from 6- inches above to 6- inches below each joint. The appropriate primer shall be applied prior to applying the rubber coating. Inside joints to be filled with precoat plug material. 6. The manhole chimneys, including all riser rings shall be sealed using infi- S":ield Uniband or approved equal. Prior to placement, the top 4- inches of the manhole cone and casting frame shall be cleaned and primed. The Uniband shall extend from 3- inches below the top of the cone section to 2- inches over the flange of the manhole casting frame. 7, The casting elevations are set by plan. However, the castings are to be adjusted in the field by the Engineers representative should a discrepancy occur between plan grade and existing grade. New manhole ring and cover shall be installed to establish grade. Maximum height of adjusting rings shall be 12- inches. 8. Backfill around all structures and all cuts under paved areas with granular material. Trenches opening within 5 -feet of paved roadways shall be backfilled with granular material in accordance with Section 211. Back-Fill under sidewalks shall be granular; unless the walks are constructed a minimum of 6 months after backfill has been in place. 9. The Contractor shall be responsible for verifying that all state highways, city, and county permits have been obtained by the developer prior to start of construction. 10. The Contractor shall be required to furnish the developer's Engineer with a set of prints, marked in red pencil, showing actual sewer location and invert, to include lateral location, depth and length. Such asbuilt prints must be received by t-ie Engineer before the final contract payment can be authorized. The sanitary sewer laterals and stubs termination shall be indicated on the surface with a metal fence post set immediately above the said termination point. CLAY TOWNSHIP REGIONAL WASTE DISTRICT SUMMARY OF LATERAL INSTALLATION REQUIREMENTS 1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90 days of notice providing a sewer is within 300 feet for Hamilton County or 100 feet for Boone County of the property line. Only one building may connect to the sewer main per lateral unless otherwise approved by the District. 2. No foundation or other storm water drains shall be interconnected to the sewer lateral installed and connected to the District's sanitary sewer. 3. The existing sewer line from the building to the septic tank may only be used if it is located under a building addition, patio, porch, or paved driveway, Air test is required to show if acceptable for re -use. The property owner shall bear the cost of all testing. The District inspector must be onsite for the duration of the air test. 4. The owner or contractor shall notify the District prior to covering the installed lateral so that the District can make an inspection to determine compliance with the District's sewer use ordinance. Such notification shall be made 24 hours prior to the need for the inspection. If the inspection fails and a second inspection is required, or contractor is not an site for scheduled inspec tion, or fails to cancel inspection, an additional fee of $75.00 will be due. This must be paid prior to the time of the follow up inspection. 5. Property owners are herby advised that the County Board of Health regulates the operation and maintenance of pri vote sewage disposal (septic) systems. The County Ordinance provides in part that, upon connection to a public sewer, a septic tank shall be abandoned and filled with earthen material in a safe and sanitary manner. Please contact the appropriate Count y Board of Health for further information. 6. Acceptable Pipe Materials: PVC PIPE: SDR 35, ASTM D - 3034, SIX INCH PIPE PVC PIPE: SDR 21, ASTM D - 241, SIX INCH PIPE GASKETS JOINTS ASTM D - 3212 GASKETS ASTM F - 477 FITTINGS SDR - 26 DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO MORE THAN 300 FEET APART. 7. Bedding: Use fill sand or Number 8, 9, or 11 stone. Fill material is to be placed from 6 inches below to 6 inches above the pipe. The trench should be a minimum of 18 inches wide. 8. Laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used meeting SDR 21-and ASTM D 2241. Any proposed installation requiring pressure pipe shall be reviewed and acce pted by the District and the District's engineer prior to installation. 9. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical coupling shall be used. 10. Laterals shall terminate within 3 feet of th a building :finless the conditions in item #3 above are met. No glued pipe shall be installed outside of the building foundation walls. 11. Additional information on District standards and specifications may be obtained from the District's office during business hours of 8:00a.m. to 5:00p.m. Monday through Friday. All District standards can be located on our web site at http://www.ctrw.d.org Clay Township Regional Waste District 10701 North College Suite A. Indianapolis, IN 46280 Phone: 844 9200 Fax: 844 9203 12. Septic effluent shall not be pumped out into the sanitary sewer system. 13. The District shall inspect ALL laterals. Please call the District office at 844.9200 24 hours prior to time of inspection. 14. Contractors shall lay 14 gauge - stranded wire the entire length of the lateral.. Wire is to be placed on top of the lateral. The District inspector will verify placement of the wire. After inspection, bedding is to be placed on top. 11. All sanitary sewer lines upon completion will be required to pass a low pressure air test. Said test shall be conducted according to ASTM 1417 -92, and shall be witnessed by an Engineer and a representative of the District. The testing shall be in accordance with Table 1. Add 0.5 psig for each foot of water above the sewer line being tested. 12. Deflection tests shall be performed on all flexible* pipe after the final backfill has been in place at least 30 days. No pipe shall exceed a vertical deflection M i5eflection test results. ( *The following are considered non - flexible pipes: concrete pipe, ductile iron pipe, and cast iron pipe). The deflection test shall be perf ormed with anise -point mandrel. Proving rings shall be available. 13. All mandrel testing shall be observed by a professional engineer representative for certification and a representative of the District. 14. The ends of laterals are to be plugged tight with a braced plastic disc or cap capable of withstanding a low pressure air test without leakage. 15. Bedding for flexible pipe shall be No. 8 crushed stone from 6- inches below the pipe to 12- inches above the pipe. Bedding for rigid pipe shall be No. 8 crushed stone from 6- inches below the pipe to the spring line of the pipe and from this point to 12- inches above shall be - fill sand or equivalent. Manholes shall be placed on no toss than 6 inche.. of No. 8 crushed stone bedding. 16. Water and sewer line crossings and separations shall be in accordance with 327 LAC 3 -6 -9. 17. Trench shall be opened sufficiently ahead of pipe laying to reveal obstruction, and shall be properly protected and /or barricaded when left uncttended. 18. No water shall be permitted to flow into the sanitary sewer system during construction. Contractor shall utilize a pump to keep the water level below the pipe. Pump discharge shall be directed to a storm outlet in accordance with state and federai laws and regulations (327 IAC 3- 6 -20). Any pipe entering existing sewers shall be plugged with screw type mechanical, braced plug until such time as all tests or, the sewers have been completed and the lines have passed all punch lists. 19. All sewer laterals installed by the mainline Contractor shall be bedded the some as the main line sewer. 20. Forty -eight (48) hours notice shall be given to the District prior to the start of sewer construction. Also, 48 hours notice shall be given prior to doing any testing on the sewer. 21. Manhole castings shall be stamped SANITARY SEWER (Neenah Casting R 1642A or equal) and be self- sealing type. The casting flange shall be 34 inches and the clear opening shall be 24 inches. Waterproof castings shall be Neenah R- 1916 -F1 and stamped SANITARY SEWER. 22. The minimum slope for sewer acceptance by the Clay Township Regional Waste District are: Size of Pipe Minimum Constructed Siope 3 -inch 0.40 % 10 -inch 0.28 % 12 -inch 0.22 % 15 -inch 0.15 % 18 -inch 0.12 % 23. The Contractor shall provide measurements of the slope of the sewer for each manhole section as construction progresses. Such measurements shall be certified by a Registered Land Surveyor or Engineer and be available on -site for observation by the District's Inspector. No more than three manhole sections car be constructed in advance of such measurements. 24. In the event the Contractor does not meet the minimum siooes, the sewer section and any other affected sewer sections shall be reconstructed to meet such minimum slopes. 25. Laterals are to be traced with a minimum size of 14 gouge wire from the wye to the terminus. The contractor for the building or home will extend the wire from this terminus to the building cleanout adjacent to the building. TABLE 1 MIINI%1UfA SPECIFIED TIME REQUIRED FOR.? I.Opsig DROP FOR SIZE A \D LE`CrTH OF PIPE; INDIC.'CI'ED FABLE I Pipe I Diameter in. n4inimmr Time, m in: s Cengih fbr Nfinimum Time, fl Time for Longer Length, S Specification 'rime for Length a,) Shown, mints _ 6 66" & LARGER 6 100 ft 150 ft 300 ft ^SG 300 ft 350 J 4009 450 ft 4 3:4R 597 0.;60 L 3:46 3:46 1 3: 16 3 16 _ 3: 16 3:16 3:46 3:46 6 5:40 386 0.851 L 5:40 5:40 5:40 1 5:40 5:40 5-40 5:42 6:24 8 7:34 298 1.5201. 31 ':.34 7:34 7:3b 8:52 10:08 11:24 10 826 239 2.37.1 L 9:'S 9:28 ?' S 9'63 1 L52 13:51 15:49 17 48 12 11:20 199 3.118 L 11 20 11:20 1.:21 14:1 17:05 19:58 fi 2"'47 25:38 16 14: 10 158 5342 L• 1 1 10 14:10 17: -18 1 22:15 26 :42 31:09 35:36 40:04 18 1700 1.3-1 7.682 L 17'00 19:13 25:33 32:03 26 27 44:52 51.16 57:41 21 19:50 114 10.470 L 18:60 26:10 3 -i: i -1 43.37 1 52:21 61:00 69:48 78:31 24 22:40 1 89 13.674 L 22-17 1 34:11 15-31 56:58 1 65:22 79:46 1 91:10 102:33 27 30 25:30 28:20 SR 80 17.306 L 2 i .3881. 28:51 96:37 43:16 53:25 5?: 11 "' i :13 ?2:07 89::,2 96:32 1 OS:50 100:57 12 =1:38 115:22 1 142:25 129:48 160:15 33 31:10 72 25.552 L -19 05 6435 SS 10 107:49 1 129:15 150:43 17221 193:53 38 34:00 86 30.788 L 61:17 76:55 102.12 L 12, 153:80 179:29 1 20 5: 07 230:16 I 0 l oZ 0 WA TER MAIN --' SEWER 10' MIN. `\J WATER MAIN" SEWER_, CLASS 150 MECH. JOINT CAST IRON PIPE 10' .M, ".N. IF LESS THAN 18- ' OR IF WATER MAIN IS BELOW SEWER � I � IF LESS THAN 10, VERTICAL SEPARATION SHALL BE NO LESS THAN 18". I W 1 3 I I Z W ti WA TER i MAIN i \ :SY� 2 SANI TAR Y SEWER CONC. J FLEXIBLE COUPLING COLLAR ( TYP) OR ADAPTER ( TYP ,1 MIN CROSSO TIER & SEPARA TION REQUIREMENTS FOR WA TER MAINS & SEWERS NOT TO SCALE CONCRETE COLLAR BEDDING MATERIAL HEAVY DUTY LAMPHOLE CASTING W/ SOLID LID, Y " NEENAH R -1974 OR EQUAL BEND !� 11 /4D . i CONCRETE CRADLE CLEANOUT DETAIL NOT TO SCALE NOTE: CLASS "A" BEDDING TO BE UTILIZED FOR ALL CLEANOUT INSTALLATIONS (SEE DETAIL) D+8" MIN. CAREFULLY TAMPED < BACKFILL 1714 ;r� -� I an 1 4D =I ?T ='i I i- - Ti i i i ITT' i i _� CONCRETE CLASS "A" BEDDING CONCRETE CRADLE NOT TO SCALE • CTRWD- ° EDGE OF PAVEMENT, CURB, GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT -OF -WAY IF WITHIN 5' OF EDGE OF PAVEMENT, USE #8 CRUSHED STONE OR APPROVED EQUIV. CLASS I BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE TO MIN. OF 12" ABOVE TOP OF PIPE, AND "B" BORROW COMPACTED TO 95% STANDARD PROCTOR DENSITY TO TOP OF TRENCH. LEGEND Bc= OUTSIDE DIAMETER D= INSIDE DIAMETER d= DEPTH OF BEDDING MATERIAL BELOW PIPE MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT M(NIMUNI WIDTH � � il�ll�l' 1:25 I3c.. -� 12' • II_ i iii: II III =- I�I 1- �MIN. 12" IF NOT WITHIN 5' OF EDGE OF PAVEMENT, Bc USE #8 CRUSHED STONE HAND TAMPED OR WALKED INTO PLACE TO MIN. F 12" ABOVE TOP OF O PIPE, AND REGULAR d BACKFILL TO TOP OF TRENCH. N OTE: ALL INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. A MINIMUM 9" OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. DEPTH OF BEDDING MATERIAL BELOW PIPE D d (MIN) 27" & SMALLER 6 30" TO 60" 6 66" & LARGER 6 PLASTIC PIPE (PVC & HDPE) BEDDING DETAIL NOT TO SCALE 5-0" BEDDING MATERIAL COMPACTED TO 95% BY PROCTOR METHOD. LONGITUDINAL SECTION 5' -0' TRENCH SECTION UNDER PAVEMENT NOT TO SCALE NOTES: 1.) CONTRACTOR TO CONSULT SPECIFICATIONS FOR COORDINATION OF MATERIALS TO BE USED. Clay Township Regional Waste District http : / /www.ctrwdsewers.org/ • 1317) 8AA -9200 • Fax j3 i 7j 844 -9203 August 2000 :a CORE- AND SEAL WITH ° BOOT NOTE: DROP PIPES SHALL BE OPPOSITE FROM STEPS WHEN POSSIBLE. le OF #8 CRUSHED STONE -/ - - - - - � 1" STAINLESS STEEL STRAP WITH 2) 1 4 "Ox 3 1/4. LG, EEL STAINLESS ST EXPANSION °I ANCHOR AT V MAXIMUM SPACING (MINIMUM OF TWO SANITARY SEWER )I •. STRAPS) NATIVE UNDISTURBED SOIL -r `✓ . > • PVC PIPE WITH 30' FILL EXCAVATED SPACE )� �~ i BEND SHALL MATCH OUTSIDE OF MANHOLE AND INCOMING PIPE UNDER PIPE WITH #8 ° GROUT MANHOLE BOTTOM CRUSHED STONE TO A �l ri TO PROVIDE SMOOTH FLOW MINIMUM OF 6" ON EACH i CHANNEL TRANSITION SIDE OF PIPE -;11 L `. G- INSIDE DRQP DETAIL NOT TO SCALE f rr: f j Architects :r Consultants Engineers 2 if AMERICAN "ONSULTING, NC. 160 SHADELAND STATION 01ANAPOLIS, IN 46256.3917 175475580 317543.0270 ,pyright (C) 2005 - Ammiccn Consulting, Inc. PR BLOCK C, LLC. 8463 CASTLEWOOD DRIVE INDIANAPOLIS, INDIANA MEDFORD PLACE (LOT 3) AT WEST CARMEL CENTER CONSULTANTS GG�� f ETgyq mow` P�,OSTER fh NO. * 19900549 STALE OF CERTIFIED BY DATE- 03/3U05 DRAWN BY, PED CHECKED BY- AF ISSUED FOR- DATE- ACE PROJECT IN2004.0948 TITLE SANITARY SEWER DETAILS / SPECIFICATIONS C6.2