Loading...
HomeMy WebLinkAbout05050111.9J 0 } m i� 0 g 0 0 0 a 0 F- a I a U to J a DIRECTION -H OF FLOW `V #8 STONE (1' — MIN. THICKNESS) PLAN TOP OF DAM 4" EMERGENCY OVERFLOW WEIR _i BOTTOM OF DAM SECTION B -B 2' 1 (MIN) I - � v CV III , Ili ;ill, I'1 !1;; 1►� I�— .I_, #1 STONE III — SECTION A -A MAINTENANCE: 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT, REMOVING SEDIMENT AND MAKING NEEDED REPAIRS IMMEDIATELY. 2. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZES, REMOVE AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION MATERIAL, AND RE- STABILIZE. ROCK CHECK DAM DETAIL NOT TO SCALE SEASONAL SOIL PROTECTION CHART STABILIZATION PRACTICE JAN. FEB. , AR. APR, MAY JUNE I JULY AUG. SEPT. { � OCT. I ( NOV. i DEC. PERMANENT SEEDING A I I - DORMANT SEEDING B I I ' B I I TEMPORARY SEEDING " �'I I E SODDING I MULCHING G — A = KENTUCKY BLUEGRASS 100 LBS. /ACRE; CREEPING RED FESCUE 100 LBS. %ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS. /ACRE B = KENTUCKY BLUEGRASS 120 LBS. /ACRE; CREEPING RED FESCUE 120 LBS. /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS. /ACRE C = SPRING OATS 3 BUSHELS /ACRE D = WHEAT OR RYE 2 BUSHELS /ACRE E = ANNUAL RYEGRASS 40 LBS. /ACRE ( 1 LB /1000 SO. FT. ) F = SOD G = STRAW MULCH 2 TONS /ACRE * /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER ** = IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER SUPPLYING SOD TEMPORARY SURFACE STABILIZATION: LOOSEN TOP 4 INCHES OF SOIL AND INCORPORATE TEMPORARY SEED INTO TOP 11/2 INCH, IF LESS THAN 1 INCH OF TOPSOIL EXISTS, INCORPORATE 1 INCH OF ORGANIC MATER SUCH AS COMPOST, PEAT, OR TOPSOIL INTO EXISTING SOIL BEFORE SEEDING. PERMANENT SEEDING INSTRUCTION: SEE B12 ON SHEET C5.3. FLAN EXTEND APRON TO LENGTH SHOWN ON EROSION CONTROL PLAN APRON END SECTIION' 7 \ NO OVERFALL �- STORM PIPE SECTION FILTER FABRIC OUTLET PROTECTION DETAIL NOT TO SCALE NOTES: 1. FOUNDATION SHALL BE GEOTEXTILE FABRIC FOR STABILIZATION AND FILTRATION OR WELL- GRADED GRAVEL FILTER LAYER AT LEAST 6 IN. THICK 2. STONE SHALL BE HARD, ANGULAR, AND HIGHLY WEATHER - RESISTANT RIPRAP STONE AT A THICKNESS OF 12 IN. MINIMUM OR TWO TIMES THE STONE DIAMETER, WHICHEVER IS GREATER 3. MAKE SURE THE TOP OF THE RIPRAP APRON IS LEVEL WITH OR SLIGHTLY BELOW THE RECEIVING STREAM. (RIPRAP SHOULD NOT RESTRICT THE CHANNEL OR PRODUCE AN OVERFALL) PROVIDE CROSS BRACING WHEN NECESSARY WOOD, METAL, OR SYNTHETIC FRAME X � I i A I A I Z r l 1,14 Ali i IJ J _J _1 -1J.11.1_.L.Li7 Ll_I � Nftl BURIED GEOTEXTILE FABRIC. 4oz. MIN, 3' MAX. FRAME DETAIL BURIED GEOTEXTILE BURIED GEOTEXTILE FABRIC. 4oz. MIN. FABRIC. 4oz. MIN. COMPACTED FILL --N, �' *mll INLET SECTION A -A TRENCH DETAIL SILT FENCE INLET FILTER NOT TO SCALE STONE BAGS DRAINAGE STRUCTURE SEDIMENTATION CONTROL NOT TO SCALE NOTE: INLET PROTECTION BAGS (SUCH AS THE SNAKE BAG BY VOLM BAG COMPANY, INC. OR EQUIVELANT) SHALL BE PLACED AND MAINTAINED AROUND NEWLY CONSTRUCTED DRAINAGE STRUCTURES. FILL BAGS APPROXIMATELY HALF FULL WITH #5 STONE. BAGS TO BE LAYERED 1 TO 3 HIGH AS NEEDED, AND TO REMAIN IN PLACE UNTIL SITE WORK IS COMPLETED. NOTE: IF CUTS BECOME GREATER THAN 3' AN NORTH AMERICAN GREEN STRAW /COCONUT ADDITIONAL 6' OF SOIL MUST BE FIBER SEEDED EROSION CONTROL BLANKET - REMOVED & REPLACED // S150 FOR USE ON 3:1 SLOPES FOR SEED. I i � �••1 MPX \ 1 /4 "; FT.- -- I AS SHOWN ON PLANS _ BANKS TO BE SEEDED & MULCHED PER THE SEASONAL SOIL PROTECTION CHART & APPROXIMATE SEEDING DATES FOR INDIANA TYPICAL GRASSED WATERWAY SECTION NOT TO SCALE i7•' 1.3 3' r Q 0 e 0 of AIl1A1 1A nWCAI MIN. 3l OR �8Q° o�• . �O� o.O ° 0.0 0° .o O o o 0 ° ° O 000. .0 p ° O O o O°O° a C) O 0 .O 0 Co 0 . a ° 0'Q° OJ b ° °. 0O o ho ° 0 ` 6`06 D 0 O' o O H ° ,o w 0 0;O�0°.0 • O O0° 0.0 0 0 �O 0 0 ° 0 �.°Uo Q� 0O ° ° Ld b0 O 0 Q 0 0 � 0 0 0 0.0 Or 0 0 O o O 0. 0 ° dO0 O O � � 0 0 o0°C O ° 0b°. (0 q � g b ° 40 0 0 O' 00 Oqj 0 0 0. .0 0 0. ° ° 1 O 6" MIN.NO. 2 CRUSHED STONE GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE c-n a nc OnCTC DC'D FILTER FABRIC FLOW WIRE WOOD POST �I =1 I I_ •loll , � I I f -^ EXTEND FABRIC & -- WIRE TO 4" BELOW SURFACE 300 275 250 225 200 SLOPE 175 LENGTH 150 FT. 125 100 75 50 25 SILT FENCE CONSTRUCTION NOT TO SCALE I 1 STAPLE PER SQ. YD. 112 1 /1f LCJ 1 .K• GENERAL STAPLE RECOMMENDATIONS B C 3' C C E3 A A x op x x x x 1 STAPLE PER SQ. YD. 112 1 /1f LCJ 1 .K• GENERAL STAPLE RECOMMENDATIONS B C C C C E3 A A B B 4:1 3:1 2:1 1:1 llnhVVIVGL LINING SLOPE GRADIENT d NOTE: POSTS SHALL HAVE A MINIMUM LENGTH OF 36 INCHES PLUS BURIAL DEPTH. POST MATERIAL SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE DURING INSTALLATION AND TO SUPPORT APPLIED LOADS. FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO DETERIORATION FROM ULTRAVIOLET AND HEAT EXPOSURE. C 3' 2 STAPLES PER SQ. YD. ADDITIONAL STAPLES AS REQUIRED DUE TO DEPTH OF FLOW (8) \ x x NOTES CHANNEL LININGS UTILIZE STAPLE PATTERN "C" WITH ADDITIONAL STAPLES ON SIDE SLOPES AT PROJECTED WATER LINE. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. Architects T Consultants Engineers Ffi E 1 kMERICAN CONSULTING, INC. 1260 SHADELAND STATION INDIANAPOLIS, IN 46256.3917 I 317547.5580 317543.0270 :opyright (C) 2005 — American Consulting. Ina i a I I PR BLOCK C, LLC. 8463 CASTLEWOOD DRIVE INDIANAPOLIS, INDIANA MEDFORD PLACE t (LOT 3) AT WEST CARMEL CENTER F CONSULTANTS F E T,qy JG %STER No. * 19900549 STALE OF �••.(ND IAN *.•;'SR CERTIFIED BY DATE- 03 /3V06 ocn CHECKED BY, AF ISSUED FOR- DATE- ACE PROJECT IN2004.0948 TITLE- EROSION a CONTROL DETAILS C5m2