HomeMy WebLinkAboutA-11m
}
_J
m
m
CD
0
TRUSS
BLOCK',
ELEVA
MATC,t
HOLD D01""
SEE F /S-
MALL SR
FACE BR
C.77 LIAA
RIND
SEALANT
HEAD A -3
SCALE: 1 1/2 " -1' -0' A A -9
C.) l.Imer-)
7TQ N�
INSULATION
2X6 FRAMING
INSULATION
FOR VAPOR BARRIER
DETAILS SEE SHEET A -20
2X6 FRAMING
AT 16' 0. C•
INSULATION
VAPOR BARRIER
5/8" GYPSUM BOARD
5 /4 i x 3 -1/4" NET)
�AR7 W007 -�N�
JAMB A -9
SCALE: 1 1/2''1' -0' B
CLAP WOO C7
VIi��JD�N
GUT L1ME STC
RIM
CONCRETE
FOUNDATION
S/8' GYPSUM BOARD
VAPOR BARRIER
2X4 HORIZONTAL
BLOCKING AT 24" 0 -C
WHERE WALL OCCURS
HALL WHERE OCCURS
(FOR DETAIL AT SHEAR
WALLS SEE M/S-2)
3/4' X 3-1/4' ( NET)
1+A?5DWDOD 7NYM,,.
JAMB (� A -9
SCALE: 1 1/2"-l'-O' `�'
_/4� x 5- V.41 (NtT-)
HAl'ivwc�� TRIG
VAPOR BARRIER
2X6 FRAMING AT 16' 0. C•
INSULATION
S/8" GYPSUM BOARD
4" RUBBER BASE
SILL A -3
SCALE: 1 1/2 " -1' -0' D A -9
OM l T T�-p
WALL SHEATHING
FACE BRICK
3 1/2' X 3 1/2' X —
1/4" ANGLE LINTEL BY
GENERAL CONTRACTOR
SEALANT -ALL AROUND -
EXTERIOR ONLY
MECHANICAL LOUVER —
SEE SECTION L /A -6
A -2 A -3
A -7
2X6 FRAMING
5/8' GYPSUM BOARD
(2) 2X6 HEADER W/
2X6 TOP & BOTTOM PLATE
1ELEVATION
1071-01
5/6' GYPSUM BOARD
(JAMB AND SILL SIMILAR)
LOUVER HEAD DETAIL A -2
SCALE: 1 1/2 " -1' -0' G A -6
2X4 FRAMING
(2) 2X4 HEADE
W/ 1/2' WOOD
SPACER
kGGRE.C%&7 = 504R0
WiE _ C> l W,&L L S H EACH i N v
SELALANT
MECHANICAL LOWER
SEE SECTION 1
ON SHEET M-7
(JAMB AND SILL SIMILAR)
LOUVER' HEAD DETAIL
SCALE: 1 1/2' -1' -0'
•
A -2
A -3
18" WIDE 30: BASE SHEET CONTINUOUS
IN VALLEY -NAIL IN PLACE
ROOFING 1S* FELT UNDERLAYMENT
OF FLOW • T YP 1 GAL ALL PEH l ML I LH
ROOF AREAS.
VALLEY FLASHING DETAIL
SCALE: NONE
�J
N
Jo
i
l f '
TYPE- � ������,r� - , � �� � ;a. �. �_ .v �-� 't�-�'�4
8' WIDE METAL FLASHING IN 6' -0" MINIMUM
LENGTHS. LAP 6" IN DIRECTION OF FLOW
24" WIDE CORROSION RESISTANT METAL VALLEY
WITH 1" "V" CRIMP -LAP B" IN DIRECTION OF FLOW
A -2
I�IMJ � 1 V LJLv
(TYPICALI
PROFILE
S N
$J\�, q;o
o
N0.
9T/�DF
iAN�
�141T�
13
U12
Q
N
W J�j
N EL�
agm?g
0
PROJECT NUMBER
DA E
.w
Q
c�
O
Q �
w .--�
U
W
O
SHEET NUMBER
t
'
OF 2�
INSULATION
TRUSSED
2X6
FRAMING
RAFTER
AT
16" 0. C.
2X6 CEILING
2X6
PLATE
FRAMING AT
VAPOR BARRIER BEHIND
TOP
AND BOTTOM
i
16" 0. C.
5/8" GYPSUM BOARD
FOR CEILING CONDITION
ELEVATION
11081-08
AT FOYER 152- SEE
DOOR HEAD DETAIL C -A -10
'
S/8' GYPSUM BOARD
SUSPENDED CEILING
WITH VAPOR BARRIER
2X6 TOP PLATE
BEAM B -9
BOTTOM ELEVATION
(3) 2X8 HEADER W/
OF BEAM 1107'-2*
1/2" WOOD SPACERS
I
15/4a x 3-V4, (OMT)
j
i- �P.RVV�cr�D TRIAD
l
VAPOR BARRILR
HEAD
A -9
E
SCALE: 1 1/2 " =1' -0`
FOR VAPOR BARRIER
DETAILS SEE SHEET A -20
2X6 FRAMING
AT 16' 0. C•
INSULATION
VAPOR BARRIER
5/8" GYPSUM BOARD
5 /4 i x 3 -1/4" NET)
�AR7 W007 -�N�
JAMB A -9
SCALE: 1 1/2''1' -0' B
CLAP WOO C7
VIi��JD�N
GUT L1ME STC
RIM
CONCRETE
FOUNDATION
S/8' GYPSUM BOARD
VAPOR BARRIER
2X4 HORIZONTAL
BLOCKING AT 24" 0 -C
WHERE WALL OCCURS
HALL WHERE OCCURS
(FOR DETAIL AT SHEAR
WALLS SEE M/S-2)
3/4' X 3-1/4' ( NET)
1+A?5DWDOD 7NYM,,.
JAMB (� A -9
SCALE: 1 1/2"-l'-O' `�'
_/4� x 5- V.41 (NtT-)
HAl'ivwc�� TRIG
VAPOR BARRIER
2X6 FRAMING AT 16' 0. C•
INSULATION
S/8" GYPSUM BOARD
4" RUBBER BASE
SILL A -3
SCALE: 1 1/2 " -1' -0' D A -9
OM l T T�-p
WALL SHEATHING
FACE BRICK
3 1/2' X 3 1/2' X —
1/4" ANGLE LINTEL BY
GENERAL CONTRACTOR
SEALANT -ALL AROUND -
EXTERIOR ONLY
MECHANICAL LOUVER —
SEE SECTION L /A -6
A -2 A -3
A -7
2X6 FRAMING
5/8' GYPSUM BOARD
(2) 2X6 HEADER W/
2X6 TOP & BOTTOM PLATE
1ELEVATION
1071-01
5/6' GYPSUM BOARD
(JAMB AND SILL SIMILAR)
LOUVER HEAD DETAIL A -2
SCALE: 1 1/2 " -1' -0' G A -6
2X4 FRAMING
(2) 2X4 HEADE
W/ 1/2' WOOD
SPACER
kGGRE.C%&7 = 504R0
WiE _ C> l W,&L L S H EACH i N v
SELALANT
MECHANICAL LOWER
SEE SECTION 1
ON SHEET M-7
(JAMB AND SILL SIMILAR)
LOUVER' HEAD DETAIL
SCALE: 1 1/2' -1' -0'
•
A -2
A -3
18" WIDE 30: BASE SHEET CONTINUOUS
IN VALLEY -NAIL IN PLACE
ROOFING 1S* FELT UNDERLAYMENT
OF FLOW • T YP 1 GAL ALL PEH l ML I LH
ROOF AREAS.
VALLEY FLASHING DETAIL
SCALE: NONE
�J
N
Jo
i
l f '
TYPE- � ������,r� - , � �� � ;a. �. �_ .v �-� 't�-�'�4
8' WIDE METAL FLASHING IN 6' -0" MINIMUM
LENGTHS. LAP 6" IN DIRECTION OF FLOW
24" WIDE CORROSION RESISTANT METAL VALLEY
WITH 1" "V" CRIMP -LAP B" IN DIRECTION OF FLOW
A -2
I�IMJ � 1 V LJLv
(TYPICALI
PROFILE
S N
$J\�, q;o
o
N0.
9T/�DF
iAN�
�141T�
13
U12
Q
N
W J�j
N EL�
agm?g
0
PROJECT NUMBER
DA E
.w
Q
c�
O
Q �
w .--�
U
W
O
SHEET NUMBER
t
'
OF 2�