Loading...
HomeMy WebLinkAboutA-4PERFORATED 1 ELEVATION1 TOP OF 118'-2 11/16' 1 RIDGE PERFORATED METAL SOFFIT r- cc, c; J r m U1 N (D O m 4. DASHED LINE INDICATES FOLDING TRUSSED RAFTERS-SEE- PARTITION HEADER BETWEEN ROOF FRAMING PLAN TRUSSED RAFTERS -SEE DETAIL G /A -18 ON SHEET S -3 VAPOR BARRIER BEHIND 7/8" METAL 12 FURRING CHANNELS BEHIND 5/8" 53/81 GYPSUM BOARD 2X12 OVERBUILD -SEE ROOF SHEETFS -3ING PLAN T R THIS PANEL i1EAM VERTICAL -4 - C OLUMN SECTION A A_1 SCALE: 1/4 " -1' -0" S 3 C -3 F 18 THIS THIS PANEL PANEL SLOPES VERTICAL , I. V-0' BUILDING SYMMETRICAL ABOUT CENTERLINE ELEVATION I TOP OF TRUSSED 1281-8 3/8' RAFTER AT RIDGE 'R BEHIND BOARD ELEVATION I TOP OF 1081-00 WALL PLATE PERFORATED METAL SOFFIT R19 INSULATION FACE BRICK ELEVA-TIONJ TOP OF 1001-01 FLOOR L I NE 2' -0 "X 2' -6" ACCESS DOOR IN DRAFT SEPARATION WALL SEE SHEET S -3 AND DETAIL G /A -S COMPOSITION SHINGLES ON ROOF SHEATHING \ 8 OPP. VAPOR BARRIER BEHIND -6 ELEVATION I TOP OF S /8" GYPSUM BOARD 116'-Io BEARING PLATE S /8" GYPSUM BOARD I SKIP TROWEL FINISH ENTIRE i WALL & CEILING SURFACE FTHIS PANEL SLOPES THIS PANEL PERFORATED METAL SOFFIT VERTICAL � 91-01 L A 19 ELEVAT 109 TOP OF —� 1081-00 WALL PLATE _ / 1 I ACOUSTIC I WALL PANEL SEE SHEET A -3 I i F037R 44 HARDWOOD BASE -WALL COVERING ON- 5/8" GYPSUM BOARD SOLID BLOCKING AT 4'-0" 0. C. ELEVATION I TOP OF 1001-08 FLOOR LINE S Nq aQ N0. F i NP L m U) a 11 t �w 01.13 :[2 w N �am d 0 aciNon gmzg PROJECT NUMBER DATE f o C � � r- C/) LL1 ona' 6E2 T J � O SHEET NUMBER OF �1