Loading...
HomeMy WebLinkAboutS-6r- m m J D m OD 0 r- 0 E NOTE: BLOCK ALL SHEATHING 2X4 BLOCKING BETWEEN EDGES AT SHEAR WALLS. NAIL TR -2 TRUSSES AT W/ IOd AT 12" O.C. AT 48" O.C. INTERMEDIATE SUPPORTS. STAGGER SHEATHING ON OPPOSITE SIDE OF SHEAR WALL SO VERTICAL JOINTS DO NOT ALIGN AT A COMMON STUD. / D _6 (3) -2X6 CONT. STRUT AT ROOF SHEATHING. STAGGER SPLICES. NAIL SHEATHING TO STRUT W/ 10d AT 4" O.C. 2X6'S AT 16" O.C. W/ WALL SHEATHING EACH SIDE. NAIL SHEATHING TO STUDS W/ 10d AT 4" O.C. AT EDGES. (2) -2X6 SILL PLATE W/ 5/8'0 X 15' ANCHOR BOLTS AT 16" O.C. AT SHEAR WALL "A" SEE L /3-2. U AT SHEAR WALL "B ". S -3 SEE M/S -2. " =1' AT SHEAR WALL "C ". K P SEE N /S -2 OPP. - AT SHEAR WALL "D" SEE N /S -2 S1M. SHEAR WALL ELEVATION ROOF SHEATHING W/ 10d NAILS AT 4" O.C. INTO TRUSS BLOCKING. SCALE: 1/8 " =1' -0" SECTION (4)- SIMPSON A34 OR f ELEVATION EQUAL AT EACH TRUSS BLOCKING TRUSS BLOCKING-AT TR -1 SCALE: 3/4 " =1' -0" ROOF SHEATHING W/ 10d NAILS AT 4" O.C. INTO TRUSS BLOCKING. ELEVATION PRE- FABRICATED TRUSS --1 BLOCKING AT 48" O.C. SHAPE TOP TO MATCH ROOF SLOPE. ALL MEMBERS OF TRUSS BLOCKING ARE 2X4'S. TR -2 AT 24" O.C. TR -1 AT 24- O.C. ELEVATION \- 116' -1' SIMPSON A3S OR EQUAL - 3 1/2' --- FRAMING ANCHORS. NAIL TO WALL PLATE AND TRUSS. S -3 A -6 ROOF SHEATHING W/ 10d NAILS AT 4" 0. INTO 2X4 BLOCKING. 2X4 BLOCKING (LAIC FLAT) AT 48" O.C. SIMPSON 22 CLIP OF EQUAL AT EACH END OF BLOCKING. 2X6 BLOCKING AT 4E 0. C. NAIL TO TOP PLATE W/ (2) 10d AT 8" O.C. -2X6 bE1WtEi1 STUD; WHEVEpi - T%OSSE5 Ou NOT DEAAM DiFeCTLY AWb t 57UO S - 2 A35 ff'AWAG ANC1•IOAS EACH K CS -3 S -7 S -8 A -6 ROOF SHEATHING W/ I"' NAILS AT 4" O.C. I� 2X4 BLOCKING. 2X4 BLOCKING (LAID I \ I FLAT) AT 48" O.C. 1 SIMPSON Z2 CLIP OR i EQUAL AT EACH END BLOCKING. � I TIT 2X6 BLOCKING AT 48' 0. C. NA 1 L TO TOP PL 4--- _ _ _ W/ t 21- l Od AT 8" 0. A ELEVATION TRUSS BLOCKING AT TR -2 SCALE: 3/4 " =1' -0" SFE- _1yOTE _ DCTAIL _ G S -3 S -8 A-6 A -13 SECTION SECTION , NAIL SHEATHING TO EACH 2X6 AT SHEAR WALL EDGES AND TO EACH TOP AND BOTTOM PLATE W/ 10d NAILS AT 4" O.C. PENETRATIONS THRU SHEAR WALL BY MECH- ANICAL DUCT. SEE H /S -6 FOR TYPCIAL FRAMING. SEE MECH- ANICAL DRAWINGS FOR SIZE AND ELEVATION OF DUCT AT EACH SHEAR WALL. AT SHEAR WALL "A" & "D ". SEE L /S -2. AT SHEAR WALL 'B" b "C ". SEE M /S -2. SHAPED It ON TOP OF TA-3'S. TOP CHORD OF (3)- TR -3'S AT HIP. (2) -16d NAILS AT EACH TRUSS. 2X6 BLOCKING BETWEEN TRUSSES. 1/2 "0 BOLTS AT 34 "(1) 0. C. AT TOP CHORD TR -IA THRU TR -lE. NOTE: FOR DETAIL TTOM CHORD OF TR -3'S. SEE G /S -6- DETAIL 5-3 SCALE: 3/4 " -1' -0" D S -8 BOTTOM CHORD OF (3)- TR -3'S AT HIP. 1 SIMPSON LSU210 X 45'L/ LSU210 X 45'R SKEWED HANGERS OR EQUAL. 1/2 "0 BOLTS AT 34"(±) O.C. AT BOTTOM CHORD. TR -IA THRU TR -lE. NOTE: FOR DETAIL AT TOP CHORD OF TR -3' S. SEE D /S -6. DETAIL S -3 SCALE: 3/4 " =1' -0" S-8 ROOF SHEATHING 2X6 RIDGE BLOCKING. SIMPSON MST27 OR EQUAL W/ (15) -16d NAILS EACH END (3) -2X6 CONT. STRUT AT ROOF SHEATHING. NAIL SHEATHING TO STRUT W/ 10d AT 4" O.C.-STAGGER SPLICE. NAIL EACH 2X6 TO THE ADJACENT 2X6 W/ IOd NAILS AT 8" O.C. 2X4 BLOCKING BETWEEN TRUSSES AT 48' O.C. DETAIL SCALE: 3/4" -1' -0' E 2X6 AT 16" O.C. STUD WALL. 2X6 WALL SHEATHING ON EACH SIDE OF SHEAR WALL• NAIL SHEATHING AT EDGES AROUND OPENING WITH IOd AT 4" O.C. -- -- OPENING FOR MECH. DUCT. SEE MECH. DWGS. FOR SIZE a ELEVATION. 2X6 ELEVATION 5EC)1oN NOTE: SEE MECH. WGS. FOR DUCT LOCATION. DETAIL A -14 SCALE: 3/4 " =1' -0' 2X8 AT 16" O.C. STUD WALL. 2X8 PLATE (2)- 2X10'S 2X8 PLATE OPENING FOR MECH. DUCT. SEE MECH. DWGS. FOR SIZE & ELEVATION. - 2X8 PLATE (2) -2XB'S ELEVATION NOTE: SEE MECH. W FOR DUCT LOCATION. DETAIL S -3 SCALE: 3/4 " =1' -0" A -14 t zeS lu 13 2 3: W u W U) WJ� N W 0 � W g1025 04 m � PROJECT NUMBER MR DATE el C/o �. LLJ0 V � � Q C/) v- w O � � 6E2 =50 V O SECTION SHEET NUMBER OF i0