Loading...
HomeMy WebLinkAboutCorrespondenceConn, Angelina V From: Boone, Rachel M. Sent: Thursday, December 20, 2012 3:32 PM To: Conn, Angelina V Subject: RE: Planning Dept. Review Comments for Coots Henke Wheeler building addition (# 12110011 ADLS Amend) Hi Angie, Just wanted to let you know I talked to Brian Cross from Civil Site. He clarified for me that they are buying about four parking spaces from the racquet club and that it is not shared parking between the two buildings. So when I asked about the square footage of the parking lot in relation to landscaping per the CDRL Rd. Overlay on the comments, we won't be able to apply that provision to the other parking areas. I think we knew that, but at least they're confirming the shared /not shared thing. Rachel Planning Administrator City of Carmel Department of Community Services - 3rd Floor One Civic Square Carmel, IN 46032 317 - 571 -2417 317.571.2426 fax From: Boone, Rachel M. Sent: Monday, December 17, 2012 3:00 PM To: 'Dave Coots'; 'bcross @civilsite.net' Cc: Conn, Angelina V; Littlejohn, David W; Mindham, Daren; Donahue -Wold, Alexia K Subject: Planning Dept. Review Comments for Coots Henke Wheeler building addition ( #12110011 ADLS Amend) Good afternoon, Dave — Please reply to each of the preliminary review comments for the ADLS Amendment application via email or letter correspondence by January 2nd. Additional review comments might be voiced at the December 19 TAC meeting. Thank you. Preliminary Planning /Zoning Dept. review comments: General site: 1. Please submit an overall site plan on one page. A smaller scale plan would help us to fully see the entirety of the project. This would be helpful in your info packets, too. 2. Please show driveway connection on site plan to new Fifth Third Bank and even (possibly) onto office building to the west. 3. Please show the square footage of the new building addition on the plans. 4. Please indicate where permeable pavers and bio- swales will be utilized. 5. Where is the dumpster located? 6. Please show what does the dumpster enclosure will look like or is planned to be. It must be similar in construction and materials to the principle building per Ch. 19.05.02 and 23F.11.05. 7. Will there be any ROW dedication or any additional ROW dedicated? Please check with the Engineering Dept. to see if this is required. 1 Conn, Angelina V From: Sent: To: Cc: Subject: Dave, Goe)\-.s 13tevti€Ie4' Foley, Amanda J Thursday, December 20, 2012 9:02 AM 'Dave Coots' 'Brian Cross'; Duncan, Gary R; Barnes, David R; Littlejohn, David W; Pickett, Libby J; Conn, Angelina V Thoroughfare Plan Commitment I looked up what Fifth Third Bank did to meet the City's Thoroughfare Plan requirements. They dedicated the additional 10 feet of right -of -way required by the Thoroughfare Plan but were not required to install (or make a commitment for the installation of) the path along Carmel Drive. So you will only be required to dedicate additional right -of -way for your project. As I mentioned in the meeting yesterday, we will need you to enter into a Consent to Encroach for the portion of your existing parking lot which will be located within the new right -of -way limits. Libby Pickett in our office will be able to help you with the Consent to Encroach process once the right -of -way is dedicated. Please let us know if you have any questions. Thank you, Amanda Foley Staff Engineer City of Carmel Department of Engineering 317 -571 -2309 (direct) afoley@carmel.in.gov 1 Citizens Water's response for the 124942 TAC meeting agenda topics: CARMEL '.TECHNICAL ADVISORY COMMI1'1'EE MEETING AGENDA Date: Wednesday, December 19, 2012 Place: Dept. of Community Services Conference Room, 3"` Floor, Cannel City Hall. Time: 9:00 a.m. Angie, The Department of Public Utilities of the City of Indianapolis d /b /a Citizens Water (CW) has reviewed the below listed TAC agenda topics. CW's response for each topic is stated in the Bold Blue Text below each topic description. Duane A. Whiting Real Estate - Property Planner c th1 m energy group.. Owens Gas I C6tlzensTtfrmal 1 Cltizeras Water 1220 Waterway Boulevard Indianapolis, IN 46202 Tel 317 - 263 -6418 dwhiting @citizensenergygroup.com 9:00 a.m. Docket No. 12110012 DP Amend /ADLS Amend: St. Vincent Carmel Hospital Women's Health Center. The applicant seeks site plan and design approval for a 96,703 sq. ft. building addition (4 stories tall) and for a 512 -space parking lot expansion. The site is Located at 13500 N. Meridian St. The site is zoned B -6 /Business (in the US 31 Overlay Zone) and OM /MM -Old Meridian District/Mixed Medical. Filed by Jon Sheidler of Woolpert, Inc. CW has no objection, this site is outside CW's Service Area, it is served by Carmel Utilities. 9:15 a.rn. Docket No. 12110011 ADLS Amend: Coots, Henke & Wheeler and Carmel Racquet Club. The applicant seeks site plan and design approval for a building addition to the law firm and for a parking expansion at the racquet club. The site is located at 225 & 255 E. Carmel Dr. The site is zoned B -8 /Business and is partially within the Carmel Drive — Range Line Rd. Overlay Zone. Filed by Dave Coots of Coots, Henke & Wheeler. CW has no objection, this site is outside CW's Service Area, it is served by Carmel Utilities. 9:25 a.m. Docket No. 12110013 SP: Gray Oaks Subdivision - Construction Plans only. The applicant seeks construction plans approval for 40 residential lots on 23.8 acres. (The secondary plat will be submitted for review later.) The site is located at 14412 N. Gray Rd. and is zoned R- 11Residenee Filed by The Old Town Design Group, LLC. CW has no objection, this site is outside CW's Service Area, it is served by Carmel Utilities. 9:35 a.m. Docket No. 12090019 DP /ADLS: Sterler Productions (Park Northwestern, Lot 8A1). The applicant seeks approval for a 10,000 sq. ft. building and parking area. The site is located at 4796 Northwestern Dr. and is zoned I -1 /Industrial. Filed by Bud Snyder of Hewes Concrete Polishing, LLC, for Sterler Holdings, LLC. CW has no objection, this site is outside CW's Service Area, it is served by Carmel Utilities. WWW.CARMEL.IN.GOV Page 1 of 2 ONE CIVIC SQ. CARMEL. IN 46032 (317) 571 -2417 December 17, 2012 Brian Cross Civil Site Group, Inc 643 Massachusetts Ave, Ste 200 Indianapolis, IN 46204 RE: Coots, Henke, & Wheeler and Carmel Racquet Club Dear Mr. Cross: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings submitted for the December 19, 2012 Technical Advisory Committee meeting, and comments from the Alternative Transportation and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) The City of Cannel's Subdivision Control Ordinance and Bicycle and Pedestrian Plan requires a 10' multi -use path along Carmel Dr. Please revise the plans to reflect these changes. 2) Please provide a pedestrian connection from the exterior multi -use path along Carmel Dr to the buildings on the site. 3) The City of Carmel Parking Ordinance requires that all commercial developments include bicycle parking. Bicycle parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) automobile parking spaces. The City of Carmel Parking Ordinance also requires that bicycle racks be installed within fifty (50) feet of the entrance designated as the main entrance of the building for which the racks are required. 4) ADA Standards for Accessible Design requires five (5) accessible parking spaces for parking facilities that provide 101 to 150 total parking spaces. Please revise the plans to add these spaces. 5) Please indicate ADA compliant handicap ramps at all crossings, adjacent to all ADA parking spaces and to all of the entrances of the building(s). ONE CIVIC SQUARE Page 1 C ARl'MIEL, INDIANA 46032 317/571 -2417 We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It. is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571 -2417. Sincerely, David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Rachel Boone, Department of Community Services Engineering Department Review Project File ONE CIVIC SQUARE Page 2 CARMEL, INDL°1NA 46032 317/571 -2417 5u, EYOR'S opFl\ C' p Tr! , `(� ye.) 6)(?).--‘i December 11, 2012 .Kenton C. Ward, COEM Surveyor of J- (amilton County (Phone (317) 776-8495 `Far (3 r7) 776 -9628 Civil Site Group, Inc. ATTN: Brian Cross, P.E. 643 Massachusetts Avenue, Suite 200 Indianapolis, IN 46204 VIA E -MAIL: bcross(acivilsite.net RE: Carmel Racquet Club Dear Mr. Cross, Suite 188 One Hamilton County Square Noblesville, Indiana 4606o -223o We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on November 20, 2012, for this project and have the following comments: 1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES fall in a Carmel Wellhead Protection Zone. 3. The proposed project does partially fall in the Moffit Williamson Regulated Drain Watershed, but all improvements and storm water discharge do not drain to a Hamilton County Regulated Drain. 4. Please direct all stormwater questions to the City of Carmel Engineering Department. 5. The Hamilton County Surveyor's Office has no comments or concerns on this project and no permits will be required from our office. Should you have any questions, I can be reached at 317- 776 -8495. Sincerely, Greg Hoyes, AC, CFM, CPESC Plan Reviewer CC: Angie Conn — Carmel DOCS, John Thomas — Carmel Engineering Dave Barnes — Carmel Engineering, Greg Ilko — Crossroad Engineers Conn, Angelina V From: Lane, Aaron [alane @gpdgroup.com] Sent: Monday, December 10, 2012 5:31 PM To: 'Brian Cross' Cc: Conn, Angelina V; 'DCoots @chwlaw.com' Subject: RE: 5th 3rd Bank & Racquet Club site, Carmel, IN Attachments: L -101 Landscape Plan_V6- 120712.pdf; L -101 Landscape Plan_V7- 120712.pdf; Photometric Plan_V7- 343867- 1 1 091 2.pdf; C- 141_Utility Plan_V9- 343867- 110912.pdf; C- 401_Utility Profiles_V5- 343867- 1 1 091 2.pdf; C -121 Grading Plan_V7- 343867- 101912.pdf; C -111 Site Plan_V6- 343867- 080812.pdf; C -132 SW PP Plan_V6- 343867- 080812.pdf; C -133 SW PP Plan_V3- 343867- 080812.pdf; C -134 SWPP Plan_V3- 343867- 080812.pdf; C -131 SW PP Plan_V6- 343867- 080812.pdf; C -503 Site Details_V6- 343867- 080812.pdf; T -001 Title Sheet_V6- 343867- 080812.pdf; C -501 Site Details_V5- 343867- 062612.pdf; C -502 Site Details_V5- 343867- 062612.pdf; C -001 General Notes_V5- 343867- 062612.pdf; C -002 General Notes_V2- 343867- 062612.pdf; C -101 Demolition Plan_V5- 343867- 062612.pdf Brian, Attached is the PDF Plan set of the 5/3 Bank at 205 E. Carmel Drive. The contact information for this site is below. Jeffrey Wagner 5/3 Bank, Regional Director (248) 603 -0726 Jeffrey.wagner @53.com Please let me know if you have any questions. Thanks. Aaron R. Lane, E.I. GPD GROUP Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.cotn tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752 AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE / YOUNGSTOWN Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the original message. Please consider the environment before printing this ernail. From: Brian Cross [mailto:bcross(acivilsite.net] Sent: Monday, December 10, 2012 4:41 PM To: Lane, Aaron Cc: 'Conn, Angelina V'; DCootsOchwlaw.com Subject: 5th 3rd Bank & Racquet Club site, Carmel, IN Aaron, It was nice to speak with you this afternoon. Please review the attached proposed design plans that will improve the Carmel Racquet Club property. At this time, we do not show cross access to /from the 5/3 Bank site. The City of Carmel would like the Carmel Racquet Club and 5/3 Bank to discuss this possibility. Please forward me a current design set of the 5/3 Bank site (PDF format) for our review. Thank you. 1 Conn, Angelina V From: Brian Cross [bcross @civilsite.net] Sent: Monday, December 10, 2012 4:41 PM To: Alane @gpdgroup.com Cc: Conn, Angelina V; DCoots @chwlaw.com Subject: 5th 3rd Bank & Racquet Club site, Carmel, IN Attachments: DKGR003.00.0.TS.pdf; DKGR003.C2.0.DP.pdf; DKGR00311.0.LP.pdf; DKGR003.L2.0.LP.pdf; DKGR003.SLP.pdf; DKGR003.survey- 001.ALTA.pdf; DKGR003.survey- 002.ALTA.pdf; DKGR003.TOPOsurvey.pdf; DKGR003.C2.1.DP.pdf Aaron, It was nice to speak with you this afternoon. Please review the attached proposed design plans that will improve the Carmel Racquet Club property. At this time, we do not show cross access to /from the 5/3 Bank site. The City of Carmel would like the Carmel Racquet Club and 5/3 Bank to discuss this possibility. Please forward me a current design set of the 5/3 Bank site (PDF format) for our review. Thank you. Brian Cross Civil Site Group, Inc. 643 Massachusetts Avenue Suite 200 Indianapolis, IN 46204 Phone: 317- 423 -3305 Fax: 317- 423 -3306 Cell: 317 - 513 -1921 1 December 4, 2012 • JAMES BRAINARD, MAYOR Mr. Brian Cross, P.E. Civil Site Group, Inc. 643 Massachusetts Avenue, Suite 200 Indianapolis, IN 46204 RE: Carmel Racquet Club parking lot expansion - Project Review #1 Dear Mr. Cross: The City received your development plan on November 16, 2012. The project is scheduled for review at the December 19, 2012 Technical Advisory Committee meeting. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Please provide all current easements for entire affected tracts to pertinent sheets with correct calls for each. 2. Are any offsite easements proposed for this project? 3. Please omit Sheet Ll .0. Landscape Plan; Sheet L2.0, Landscape Plan; and Sheet SLP, Site Lighting Plan & Photometric Plan from construction sets to be submitted for review by this department. The Department of Engineering does not have approval authority over landscape plans or photometric plans. Please remove the titles for the Landscape Plan and Site Lighting Plan & Photometric Plan from the Sheet index. 4. Please provide a Drainage Summary in accordance with the Stormwater Technical Standards Manual 102.02 xi. m. A table with the appropriate information is sufficient. 5. Please provide the 100 -year elevation of the infiltration detention pond. 6. Please indicate the bottom slope of the infiltration detention pond. A minimum I% slope is required. 7. Please indicate a subsurface drain in the infiltration detention pond. 8. Stormwater runoff will be increased to the existing stormwater outlets in the existing Racquet Club and Coots, Henke, and Wheeler parking lots. Please check the capacity of these outlets and analyze the outfalls. 9. Please indicate the storm sewer system to the nearest outfall for the swale on the southeast side of the Racquet Club property. 10. There is an existing outlet on the southwest corner of the existing parking lot that is directed to the Fifth Third Bank property to the west. This storm sewer is not indicated on Fifth Third's construction plans. Please contact Aaron Lane, the project engineer at GPD Group, 614- 859 -1611, to determine the condition of this pipe. 11. Please verify the capacity of the existing pipe, west of the Racquet Club's property, which the detention pond will outlet. Please check the hydraulic grade line of this pipe and downstream outfall at Medical Drive. 12. The existing Racquet Club roof drainage, at the south side of the building, needs to be intercepted and directed to the detention pond. There are existing drainage issues on the south side of the Racquet Club building which need to be corrected with this project. The opening inthe pipe in this area needs to closed back up, and the roof downspouts need to be enlarged to accommodate the full amount of ninoff from the building in this area. 13. All construction on the south side of the property, near the proposed detention facility, should be careful due to the existing retaining walls along this property line. 14. Portions of new impervious surfaces are not indicated to be detained with this project. New impervious surfaces shall be detained. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CAR.MEL, IN 46032 OFFICE 317.571.2441 FAX 317.771.2439 EMAIL engineeringnecarmel.in.gov Mr. Brian Cross, P.E. December 4, 2012 RE: Carmel Racquet Club parking lot expansion- Project Review #1 Page 2 of 5 15. Will protection/guard rail be provided along the north side of the detention facility? 16. Please provide more spot shots along the drive leading from the existing Racquet Club parking to the proposed parking lot. 17. Please include the City's Curbing Policy in the plan set. 18. The Thoroughfare Plan indicates a 50 -foot half right -of -way for Carmel Drive. Please indicate this on the plans. A Consent to Encroach will be required for the existing Coots, Henke, and Wheeler parking lot. GENERAL INFORMATION 19. These comments represent the Department of Engineering's first review of the development plan for this project, 20. We request that all responses to our continents be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 21. it is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 22. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. if you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 23. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and perfonnance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off -site easements necessary to install utilities to serve the development are secured. e. SWPPP is approved. f. All fees are paid. 24. The Department reserves the right to provide additional comments based upon subsequent reviews. 25. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. Please contact Mr. John Thomas regarding storm water quality requirements. 26. An approved right -of -way permit is required prior to commencing any work in the public right -of -way and for construction equipment access from the City's right -of -way. 27. If it will be necessary to relocate existing utilities, the costs for such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one foot of the outside edge of the proposed right -of -way. 28. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City G1S Department for the requirements. 29. Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Perimeter Street and Right -of -Way — City of Carmel (Carmel Drive) c. Water — City of Carmel Utilities d. Sanitary Sewers — City of Carmel Utilities e. Storm Sewers/Drainage — City of Carmel. Mr. Brian Cross, P.E. December 4, 2012 RE: Carmel Racquet Club parking lot expansion- Project Review #1 Page 3 of 5 f. Legal Drains — Hamilton County Surveyor's Office. 30. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities. The Owner will receive 3 sets, one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final approval. 31. Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities Distribution Carmel Utilities Collection 3450 West 1315' Street 901 North Range Line Road Westfield, IN 46074 Carmel, IN 46032 32. Carmel Utilities subscribes to "Holey Moley" who should be contacted directly for all water main locations. 33. The following items will be sent electronically upon request regarding this correspondence and project: a. Project Approval Checklist b. Perfonnance /Maintenance Guarantees c. Utility Jurisdictions /Right of Way Permits d. Availability (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY 34. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. 35. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable). 36. Water Availability and Sanitary Sewer approval from the Board will be required. This is an EDU approval based upon the proposed use of the site. Reference Items #33 to #35 below for additional details /explanations. Please note that if an entryway or other irrigation system is planned for this development, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. 37. Commercial Curb Cut Approval. Please provide 8'/ x 11 exhibits with the request for approval. Provide all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drives or streets, relationship to the location of previous curb cut, etc. 38. Temporary Construction Entrance Approval. A construction entrance is not shown on the development plan, but will be required on the construction plans when this project gets to that stage. 39. The installation of any permanent, privately owned and /or maintained improvement (signs, decorative street signs. walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. 40. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. Mr. Brian Cross, P.E. December 4, 2012 RE: Carmel Racquet Club parking lot expansion- Project Review #1 Page 4 of 5 41. Dedication of right -of -way if not platted. This is based upon the City of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be advised that all Right-of-Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City. The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request. 42.' Any open pavement cuts of City right -of -way will require Carmel Board of Public Works and Safety approval. BONDING REOUIREMENTS 43. Please contact Mr. Dave Barnes to review performance guarantee requirements. Please contact Mr. John Duffy to review water and sanitary sewer bonding requirements. 44. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes, and materials, etc. 45. Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 46. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 47. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 48. Any work in the dedicated right -of -way will require an approved Right -of -Way Permit and a License & Permit Bond. 49. The bond amount is determined by our Right -of -Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right -of -Way Permit. 50. Please contact our Right -of -Way Manager, Fred Glaser, to arrange right -of -way permitting and bonding. AVAILABILITY AND CONNECTION FEES 51. We defer to Carmel Utilities regarding this issue. 52. if an entryway or overall site irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. 53. These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Carmel Utilities. If you have questions, please contact me at 571 -2441. Sincerely, ry R. uncan, r. P.E. Assistant City Engineer Department of Engineering /R44 Mr. Brian Cross, P.E. December 4, 2012 RE: Carmel Racquet Club parking lot expansion - Project Review ##1 Page 5 of 5 cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Cannel Utilities Paul Pace, Carmel Utilities Paul Arnone, Cannel Utilities Greg Hoyes; Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrapps\userdata\z\ hared\ DHILL\ CARMELRACQUETCLUBPARKtNGLOTEXPANS IONREV #1 pf, Carmel Carmel Po Ilse Department S fare Carmel, Iudiana..46032 November 28, 2012 Brian Cross, P.E. Civil Site Group, Inc. 643 Massachusetts Avenue, Suite 200 Indianapolis, IN 46204 RE: Coots Henke Wheeler / Racquet Club Dear Mr. Cross: The above mentioned project has been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Tiihothy J. Green Chief of Police TJG:vb cc: Dept. of Community Services (317) 571 -2500 A Nationally Accredited ,Law'Enforcement Agency Fax (317) 571 -2512 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Conn, Angelina V Tuesday, November 20, 2012 5:31 PM 'Brian Cross' 'Dave Coots'; Hollibaugh, Mike P; Boone, Rachel M. 5th 3rd Bank & Racquet Club site 5th 3rd Bank site plan.pdf Good evening, Brian — Please take a look at these 5th 3rd Banks plans, to see how we can connect the Racquet Club site (and the Coots Henke Wheeler site) to the 5th 3rd Bank site with a driveway connection, as part of your petition. Thanks! Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317 - 571 -2417 1 F: 317 - 571 -2426 1 E: aconnacarmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 1 Conn, An • elina V From: Sent: To: Cc: Subject: Brian, Greg Ilko [gilko @crossroadengineers.comj Tuesday, November 20, 2012 10:37 AM bcross@civilsite.net Duncan, Gary R; Foley, Amanda J; Thomas, John G; Greg Noyes; Conn, Angelina V Coots Henke & Wheeler / Carmel Racquet I received a packet with regards to the Coots Henke & Wheeler building Addition /Carmel Racquet Club Parking Lot Expansion today. Per the City of Carmel Stormwater Technical Standards Manual, Section 102.07 ADLS Development Plan Submission, the following information needs to be submitted for our review: Construction Plans (in accordance with Section 102.02) ii. Stormwater Drainage Technical Report (in accordance with Section 102.03) Stowmwater Pollution Prevention Plan (in accordance with Section 102.04) Please review all applicable sections and confirm that required information and data is included within your resubmittal. Full size, hard copy plans and calculations can be delivered to my attention. Sincerely, Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317 - 780 -1555 ext. 112 Mobile: 317 - 408 -3609 Fax: 317 - 780 -6525 1 Conn, Angelina V From: Brian Cross [bcross @civilsite.net] Sent: Monday, November 19, 2012 9:31 AM To: Conn, Angelina V; Donahue -Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Lux, Pamela K; Duncan, Gary R; Foley, Amanda J; Redden, Nick; Barnes, David R; david .lucas @hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Krueskamp, Theresa A; Shirley Hunter; rfarrand @ccs.kl2.in.us; sk4986 @att.com Cc: Tingley, Connie S; Mike Beesley; 'John Albrecht' Subject: Coots Henke & Wheeler / Carmel Racquet Club Attachments: DKGR003.00.0.TS.pdf; DKGR003.C2.0.DP.pdf; DKGR003.C2.1.DP.pdf; DKGR003.L1.0.LP.pdf; DKGR003.L2.0.LP.pdf; DKGR003.SLP.pdf; DKGR003.survey- 001.ALTA.pdf; DKGR003.survey- 002.ALTA.pdf; DKG R003.TOPOsurvey.pdf The attached files are being sent to you as a member of Carmel TAC. Paper copies will arrive shortly, if applicable to the plan submittal preference identified on the TAC member list. Thank you. Brian Cross Civil Site Group, Inc. 643 Massachusetts Avenue Suite 200 Indianapolis, IN 46204 Phone: 317- 423 -3305 Fax: 317- 423 -3306 Cell: 317- 513 -1921 1