Loading...
HomeMy WebLinkAboutSchneider/ENG/Addl Serv 2/18,955/106th path illinois to ditch Schneider Corporation Engineering-2013 Appropriation#202-401; P.O. #26573 Connect Not To Exceed$18,955.00 QQROp� ADDITIONAL SERVICES AMENDMENT TO t; AGREEMENT FOR PURCHASE OF GOODS AND SERVICES Oct THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ("Agreement") entered into by and between the City of Carmel and Schneider Corporation (the "Vendor"), as City Contract dated May 4, 2011 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". Furthermore, the terms of the Agreement shall be amended to include the E-verify requirement as stated in Indiana Code § 22-5-1.7 et seq., which is attached hereto and incorporated herein as Exhibit "B", as well as the required E-verify Affidavit, attached hereto and incorporated herein as Exhibit "C". Also, pursuant to I.C. § 5-22-16.5, Vendor shall certify that in signing this document, it does not engage in investment activities within the Country of Iran. The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA Schneider Corporation by and through its Board of Public Works and Safety By: By: c(7)-eael James Brainard, Presiding Officer Authorized Signature Date: f/— IC/-4t M�KQSStJ-Ew, �l.Ac s iLa %l. Printed Name Mary A n Bur en—Member Date: — /3 .5Fiutcsz- T"rtosEcf M 114,E1=-. Title • t t.t/ . Lod S. Watso , n emner FID/TIN: 3S- (0-1 cig Date: 3 to Last Four of SSN if Sole Proprietor: ATTEST: /�j' / //J ru Date: FEB .kl 22-120k 3 /Diana Cordray, IAMC, GlWrk-Treasurer Date: \U++a:i01�INa,,F w-S Nw4AN4Laurp,ncs ia&G W a 5t�xEOAwtW!\1J11+5C14\21ff R CORPORrATION A5/y J,'Ufl110131:51 P.\U o . . 0 o00 February 18, 2013 CITY` OF C` ARVIEL JAMES BRAINARD, MAYOR Mr. Michael Krosschell Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216 RE: Additional Service Amendment#2, PO #26573 Dear Mr. Krosschell: As we discussed, the City of Carmel has a need for additional professional services. Pursuant to our current contract with Schneider, dated May 4, 2011, I have requested and received from you the proposed scope of services and fee estimates for the following work task: Additional Service Amendment#2— 11-05; 1066 Street Path, Illinois to Ditch Design Services, supplement Not to Exceed: $18,955.00 Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates, and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services"performed on City contracts must be billed separately from the original contract and other additional services. More importantly, the invoice must reference the appropriate Additional Service# and P.O. #shown above. Invoices received without the Additional Service# referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Carmel with your professional, quality services. If you should have any questions, please give me a call. Sincerely, , mss . . Michael T. McBride, .E. City Engineer Exhibit Ai' Reviewed and approved by: / S. C. Enge •ing Director of Administration DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CAIE IEL, IN 46032 OFFICE 317.571.2441 FAX 317.57]2439 EMAIL engineering @carniel.in.Gov CONTRACT AMENDMENT No. 1 PROJECT NAME: 106th Street Trail TSC JOB NO. 7391.002 RE: Professional Services Agreement between The City of Carmel ("Owner") and The Schneider Corporation ("Engineer") dated May 4, 2011. Reason for Change: Add special wooden guardrail feature to separate automobile traffic from pedestrian and bicycle traffic along the 106th Street pedestrian trail connector between Ditch Road and Illinois Street. SCOPE OF SERVICES Research and Coordination with INDOT • Coordinate with INDOT effective and aesthetically appealing barrier separation Revise Design Model • Add Guardrail and Redesign Cross Sections • Add Short Block Walls where necessary to limit RJW and land disturbances Revise Cross Sections • Revise 22 Cross Section sheets Revise Plan&Profile Sheets • Revise 8 plan and profile sheets Revise Typical Section • Revise Typical Details Quality Control &Additional Est for Changes • Review Revisions, • Additional cost Estimate for Changes • Coordination with INDOT, Carmel and Staff over changes Total: $18,995.00 FEE SCHEDULE Original Fee for Services as outlined in "Fee Schedule--Attachment B"to said Agreement: $125,617.50 Prior adjustments: $ 0.00 Fee Additions by this Change Order: $ 18.955.00 Fee Deletions by this Change Order: S 0.00 Final Adjusted Fee: $144,572.50 OWNER ENGINEER The Schneider Corporation By: By: Print: Print: Michael Krosschell, RLA Title: Title: Senior Project Manager Date: Date: January 16, 2013 74 Professional Services Agreement Between Ver. 10196 The Schneider Corporation and The City of Carmel January 16.2013 T97k\7391\002\docssconlrect1.2013.01.10 Contract Amendment BD1.docx