Loading...
HomeMy WebLinkAbout05050050.3EGRESS STAIR OPEN STAIR TO FIRST r,_'tife Safety Plan - Second Scale: 1/16 " = V -0" EGRESS STAIR OPEN STAIR FROM SECOND Life Safety Plan - First 1 Scale: 1/16 " = V -0" Life Safety Plan - Attic File Storage Scale: 1/16 " = 1' -0" CODE SUMMARY Project summary: Abbreviated Summary: New construction of a two -story office building over a two story partially recessed parking garage. Garage: reinforced concrete walls, concrete slab on grade, precast concrete floor and roof slab; steel post and beam interior structure. Offices: Steel structural frame; steel barjoists floor joists and roof rafters; wood stud infill exterior wall panels; wood stud interior nonloadbearing walls; composite steel - concrete floor deck; brick masonry veneer, insulated nailbase roof decking over steel roof deck; dimensional shingle roofing, clad wood windows; gyp - crete floor topping; fully sprinklered. 4 -stop hydraulic elevator; plumbing, heating, cooling, ventilating, electrical, and signal systems. Sump pump system with generator backup. Plaza: waterproofing membrane; plaza pavers on pedestals; railing; stone paving; brick and limestone trim. Applicable Codes: BUILDING CODE: 2003 Indiana Building Code Building height (highest roof) FIRE CODE: 2003 Indiana Fire Code Building height: (highest element) PLUMBING CODE: 1999 Indiana Plumbing Code Number of exits: ELECTRICAL CODE: 2004 Indiana Electrical Code Parking Spaces MECHANICAL CODE: 2003 Indiana Mechanical Code Handicapped Parking Spaces ENERGY CODE: Indiana Energy Conservation Cod Elevator Hoistways ELEVATOR SAFETY CODE: 2002 Indiana Elevator Safety Code Occupancy Office Building: Group B office building. Classifications: Parking garage: Group S, division 2, Enclosed Number of stair enclosures Parking Garage Construction Type: Type VB Construction, based upon nonseparated uses and Occupancy Data: unlimited area a. Office Occupant Load [302.3.2, 503.1] Allowable Area: Unlimited C. Office Occupant Load Actual Areas: t d. Parking Occupant Load (1.5) 1. Total Gross Building Floor Area: 76,844 sf 2. Total Gross Office Building Area: 24,540 sf 3. Total Gross Parking Area: 52,344 sf 4. Total Net Office Area: 18,345 sf 5. Total Net Parking Area: 42,133 sf 6. Total Net Storage Room (Attic): 1,218 sf t: Areas and Volumes are calculated per AIA Document D101 The Architectural Area and Volume of Buildings Area is limited to Building No. 4 and parking areas below Building 4, west plaza, and Building 5. Buildings No. 3 and No. 5 are not included in these area calculations or summary data Allowable Height: 2 stories allowed [504.2] 3 Stories actual [502.11 Occupancy Separations: Occupancy separations not required between B Occupancy and accessory S2 uses. [Table 302.3.3, footnote e] Building Elements - Building elements, including structural frame, floor and roof are Fire - resistive permitted to be of unprotected construction Requirements [Table 601] Shaft enclosures are required to be 1 -hour rated where floors have openings, except as permitted for utility penetrations [707.2, exc. 3, 711.4.3] Ducts connecting only 2 adjacent floors are permitted to have the annular space filled with a noncombustible material [715.6.3] Incidental Use Storage rooms over 100 sf and boiler rooms are not required to Separations: be separated with a fire -rated separation, based upon automatic sprinkler protection - walls are required to terminate at deck, with self - closing doors [Table 302.1.1, Sec. 302.1.1 ] Electrical Room Electrical transformer room required to be separated with 1- Separation: hour construction if containing oil- insulated transformers over 75kVA, or dry-type transformers over 112.5kVA; and the transformers are less than a Class 155 insulation system rating [450.42, 450.21(b), Electrical Code] Fire and Smoke Fire dampers are required at duct penetrations of shafts Dampers: Smoke dampers are required in transfer grills in smoke resistant walls. [715.5] Corridors: Corridors are permitted to be of non -rated construction throughout, based upon sprinkler protection [Table 1004.3.2.1] Elevator Lobbies: Fire -rated elevator lobby vestibules are not required where elevators adjoin corridors [707.14.1, exc. 4] Exit Travel Distance: Exit access travel distance is permitted to be a maximum of 250 feet [Table 1004.2.4] Panic Hardware: Required for doors in the means of egress serving any room with an occupant load of 100 or more [1003.3.1.9] Exit Access Doors from 2 exit access doors are required from rooms or suites with an Rooms: occupant load of 50 or more or where the common path of travel exceeds 75 feet [1004.2.1 ] Stair Enclosures: 4+ story Stair enclosures: 2 -hours 3 -story Stair enclosures:1 hour Automatic Sprinklers: Automatic sprinklers are required throughout based upon Unlimited area Elevator Hoistway and The elevator hoistway and machine room will be separated with Machine Room: 2 -hour construction in order to omit sprinklers from these spaces [903.3.1.1.1] Standpipes: Not required, since 2nd floor is less than 30 feet above the lowest level of fire department vehicle access [905.3.1 ] Fire Alarm System: Fire alarm system required [907.2.] Smoke Detectors: Smoke detectors are required for elevator recall, and for HVAC shutdown for systems delivering in excess of 2,000 cfm [3003.2], [606.1,IMC] Other Related Information: 1. Building height (highest roof) 2. Building height: (highest element) 3. Number of exits: 4. Parking Spaces 5. Handicapped Parking Spaces 6. Elevator Hoistways 7. Elevator Assemblies 8. Elevator Type 9. Number of stair enclosures 10. Interior Finishes: 11. Occupancy Data: a. Office Occupant Load b. Parking Occupant Load C. Office Occupant Load d. Parking Occupant Load (1.5) 53'-9" 62'-4" 11 direct exits 121 total spaces 4 accessible spaces 2 hoistways 1 car; 4 stops each 2500 capacity, hydraulic 2 enclosures 2 -hour rated Class A f inishes for shell 246 persons allowable 384 persons allowable 90 persons actual 182 persons actual PEDCOR DESIGN GROUP Architecture / Project Managment: 335 Ridgepoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) T U T 2'% f,, 33126 ..STATE OF . �R� � N Developer: P E D C 0 R DEVELOPMENT CO. U) Project: W U ON;t m Wo06� Q� �o � U m a U D-i E LU W Issue Date Drawn By Checked By 02/28/2005 Revisions: 3/1/05 Print Date Project Number: 0401.00 Sheet Title: Life Safety Sheet Sheet Number: '1 "�O l