Loading...
HomeMy WebLinkAbout05050050.9e O I c O I a 00 N 00 N C 0 I C 0 1 I RM H OD O � I I I tO N M I w I N io I V1 v2 v3 v4 v5 153' -0" 17' -4" 62' -4" 15'- 7'3(6" 1' -0" 17' -4" 18' -2" _ _ 24' -0" _ _ 18' -2" _ 16'- 1113(6" 1' -0" 5' -1 7' -6 "'- v6 12' -6)(6" v7 25' -JIXr," 20' -0" 57' -8X6" 7' -6" v8 W Z iJ a 25' -6" 25' -1" V9 ) ( 1 1' -8' 8" ' -0" a I 1 � I N I I 1 T SLAB 0 PERIMETER -(20'-6), UNO -- - - - - -- r - I/r -t[1 -o j -, I I o I I RETARDER OVER 12" DRAINAGE FILL I I i---- - - - - -- R — - I —� o 1 4 - - -- - - - - -- - - -- cwlz L I J L - - - - -_ _ WF60 T/F (22' 6') i L— I —J F6.5 L— T/f o -107 Q —J F6.5 T/ -(Y2' -1Q7 I - - - -- r I T CONC -(20'-6") r I I N I L--- Q , - - - - -- — - -- WF60 TA - (22� -6"� 7 I/ , I S1M 1 / I J 9/S404 a I 1 � I N I I 1 T SLAB 0 PERIMETER -(20'-6), UNO 6" THICK SLAB ON GRADE w/ 6x6- 2.9xW2.9 WWF OVER PLASTIC VAPOR RETARDER OVER 12" DRAINAGE FILL I I T SLAB -(20'-6) / / / I 29 -2" 6" THICK SLAB ON GRADE w/ 6x6- 2.9xW2.9 WWF OVER PLASTIC VAPOR 10" RETARDER OVER 12" DRAINAGE FILL CURB 1 I I r SD i r I L/ / yt�`°° I a I I PILASTER FOR FTG ABOVE -\I - - -- - - -- ------------ - - - - -- o - 1---� I I I I I CW16 I i 1 ° I `° I I I I I I JQ '2 Iv I I I I I I , ° -- - - - - - -- " ------- - - - - --J F7.5 I I F7.5 I WF60 T/F —(22'-6-) — — — — T/t -(12' -10� ° — — — — TA -(22' -107 I i 3' I 1 1� 1 Ico N i T AMP SLAB — SLOPES I I I o co I I 6" THICK SLAB ON GRADE w/ I t o I I I I ►- 66-2.902.9 WWF OVER PLASTIC VAPOR 1 I I T N N I I I I cp RETARDER OVER 12" DRAINAGE FILL _ I CURB I W I - —D I. I I I I I c 1 I I NPILASTER FOR FTG ABOVE L------------------------------- - - - - -J a o - - - - -J I 5 CW12 CW16 Q I a ° - -- - -- I _ --- - - - - -- - - - - -- ---------- - - - - -- wO TF(=�- - - - -------------- - - - - -- =60 T/F - (22' —s' - - - - - -- FS /- 22' s) � ) PILASTER FOF G a ABOVE, SEE '3/S402 2' -0 I ' 4 1' -0' I 1_0• i z� 47' -5V 7' -6' 1 82' -09i6" = a 17' -4" 137' -0" 9' iV I I I i� O I N I N I N BLDG NO. 5 FOUNDATION PLAN PLAN NOTES 1. ELEVATIONS (f), ARE FROM NOMINAL FIRST FLOOR ELEV +(0' -0 "), 7. 18'0 CONCRETE ENCASEMENT, FULL HEIGHT. SEE CIVIL DRAWINGS. 8. SEE CIVIL DRAWINGS FOR ALL PERIMETER DRAIN TILE LOCATIONS AND SCALE: %" = 1' -0" 2. SEE S100 FOR GENERAL NOTES AND S401 FOR SCHEDULES. INFORMATION. 0' 1' 2' 4' 8' 16' 3. SEE ARCH DWGS FOR ALL DIMENSIONS NOT SHOWN. CONTRACTOR 9. SEE ARCH DWGS TO VERIFY RAISED SLAB AREA LIMITS AND RAMP PLAN NORTH SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION AND NOTIFY SLOPES. ARCHITECT /ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 4. PILASTERS ARE CENTERED UNDER COLUMNS UNLESS NOTED OTHERWISE. 5. SEE S102 AND S104 FOR T/W AND T/P ELEVATIONS NOT SHOWN ON THIS PLAN. 6. AREAWAY BASE SLABS 4" THICK SLAB ON GRADE w/ 6x6 W1.4xW1.4 WWF OVER COMPACTED DRAINAGE FlLL.. SEE CIVIL DRAWINGS TO COORDINATE UNDERSLAB DRAINS AND PENETRATIONS THROUGH WALLS AND OR FOOTINGS. PROVIDE NOMINAL 4" DIA BLOCKOUT IN FTG AT CENTER OF AREAWAY, FlLL w/ COMPACTED DRAINAGE FlLL n B D E 0 H J K L PEDCOR DESIGN GROUP Architecture / Project Managment: 335 Ridgepoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: C. Rodney McComas No. =-� 860325 -51 0'• STATE OF ��i FJ+'•..�ND I AMR••'. � ��� MoCOMAS SfRUCfUiu WMIIW FORM B04M NATION& MIMTMIn 1717 Fact 116M SbveL BAD 200 Cannl. MGM 4WX �7— '"" "JIICOglli.l¢Cp11 .�17 —. '—Q Faw Developer: P E D C 0 R DEVELOPMENT CO. Project: LL 0 q�t W LU 0 06 CU za� --0 O z . RiRRRRa J w 0 C) _ U � U � ^Q L.L Issue Date Drawn By Checked By 02/28/05 nth JIJ1 Revisions: MEI Project Number: 24187 Sheet Title: BLDG NO. 5 FOUNDATION PLAN Sheet Number: S 16