Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
05050050.67
vp tV 1 J Q7G sheet E103 for continuation —1 OA / � 1 U GENERAL NOTES: A. All 120v., 20 amp circuits over 100' in length shall be # 10 AWG. B. Conduit system shall be emt above main level ceiling. Contractor may use M.C. cable for branch circuits above accessible ceiling. All homeruns to the panel shall be EMT conduit. C. Contractor shall coordinate with all other trades to avoid conflicts of space. D. Contractor shall coordinate the exact location of all devices with all other trades prior to rough —in. Exact location to be determined in the field. E. Refer to sheet E701 for symbols and details. F. Refer to sheet E601 for riser diagram. G. Refer to sheet E601, E602 and E603 for panel schedules. H. Contractor shall coordinate with the mechanical and plumbing contractors for exact locations of equipment prior to rough —in PLAN NOTES: O1 Contractor shall provide and install a 125 amp disconnect switch with 125 amp dual element fusing for elevator equipment. Coordinate exact location with elevator installer prior to rough —in. 0 Contractor shall provide and install a lockable toggle switch for elevator cab lighting. Provide a dedicated circuit to switch as shown on plan. 0 Contractor shall provide and install a dedicated G.F.I. receptacle for elevator equipment use. ® Contractor shall provide a telephone rough —in for dedicated elevator cab phone line. l� Contractor shall provide and install a weatherproof light switch, light fixture and G.F.I. receptacle in elevator pit. Mount devices at 12" below top of pit. ® Contractor shall make connection to flow and tamper switches at each level at each branch off of the main fire riser as required. OContractor shall make the necessary connection to PIV valve as required. Refer to site plan for exact location. u�� :4- PEDCOR DESIGN[ GROUP Architecture / Project Managment: 335 Ridgepoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) ©Copyright 2004 ` %II111111 /I.,/ OBER �� ; • �c�STE� • �� -� N0. 13968 o! Luz STATE O •• of ONA Consulting Engineer: JOHN OBERLIES CONSULTING ENGINEERS INC. Mech an lcaI • Electrical • Clvll • Sanitary Developer: P E D_C 0 R ? � * � �ep, tex DEVELOPMENT CO. U) Project: W U O� m WO06CU �ZaC: Q � �o C .j E -� w m U V �m a U D W Issue Date Drawn By Checked By 02/28/2005 GWI SLl Revisions: Project Number: 0401.00 MEI 24187 Sheet Title: Bldg. #4 Lower Level Parking Electrical Plan 4 Build in #4 Lower Level Parking Electrical Plan J E101 Scale: 1/8" = 1' -0" (P PLAN NORTH Sheet Number