HomeMy WebLinkAbout07020031.3SEE SHEET 52.3 FOR COLUMN BASE DETAILS I/2" EXPANSION COLUMN ISOLATION JOINT JOINT MATERIAL (TYP.) FILL W/CONCRETE Ilk FINISH FLOOR El PER PLAN 4. 00 ° O ° d T/FTG. EL. PER PLAN ° ° .ed. d W a d . d . d QC to U in ° d d d ° d d ° d d 4 d SECTION FT--- PRECAST PANEL I/2" EXPANSION JOINT MATERIAL (TYP.) FINISH FLOOR EL. 4 ° PER PLAN z u0. W T /PAD EL. PER PLAN 2 - #5 CONT . PRECAST CONNECTION HARDWARE DESIGNED E INSTALLED BY PRECAST CONTRACTOR GROUT E SHIMS BY PRECAST CONTRACTOR °� . /// KtlW0KC;IN07 PER PL AN 21 —OII In SECTION 5 SCALE: 314" = I' -O" FINISH FLOOR EL. PER PLAN 10" EXTERIOR FACE OF PRECAST INSULATION PER ARCH. PER SITE DWGS. _ d - - - -- a I -111 —III -1 I N T/FTG. EL. d d d ° d • Z1 11/13/06 LI\ 1 V \I GROUT E SHIMS BY d ERECAST CONTRACTOR ' S a d d f PER SITE DWGS. ,_ =1 �--a O PRECAST CONNECTION I I-1 I EEI I E d in HARDWARE DESIGNED E � - IIIIIIIIIII111 ° 11111111 ° SECTION e - 1 - #4 CONT. #4 DOWELS @ 24" O.G. 2-10" 8'1 CONCRETE FOOTING PER PLAN PRECAST PANEL PRECAST CONNECTION HARDWARE DESIGNED 8 INSTALLED BY PRECAST CONTRACTOR a SECTION z 3/4" .I T d d 0 GRANULAR FILL (TYP) WATERPROOFING PER SPECIFICATION PRECAST CONNECTION - HARDWARE DESIGNED t INSTALLED BY PRECAST CONTRACTOR b 2 - #5 CONT. QJC� m lull HOI STWAY d ° a a d �. • • ° .d d a ° SECTION e SCALE: BAN I'-ON 11/13/06 FINISH OR EL. PER 4.d FIN. GRADE EL. r--' 1 GROUT E SHIMS BY d ERECAST CONTRACTOR ' S a d d °N PER SITE DWGS. ,_ =1 �--a W PRECAST CONNECTION I I-1 I EEI I E d PERMITS HARDWARE DESIGNED E � - IIIIIIIIIII111 ° 11111111 ° 2 ESI #2 1/2" EXPANSION a RIGID INSULATION m JOINT MATERIAL ° PER ARCH. z_ T/FTG. EL. —1 l I1 T /CONCRETE SLAB d A PER SITE DWGS. ° OIL Z PER PLAN ° ° d ° is O PER SITE DWGS. — III — III d. d DRILL AND EPDXY d a Fo a #4 BARS x 6' -O" @ 24" O.G. 711111111111 ° ° SEE SHEET 52.3 FOR W/4 1/4" MIN. EMBEDMENT d d =i COLUMN BASE DETAILS USE HILTI HIT HY150 a to QC d.. ° d EPDXY SYSTEM PER PLAN dd d . ad d CONCRETE FOOTING Fy ° . AND REINFORCING O BY PRECAST ° PER PLAN SECTION z 3/4" .I T d d 0 GRANULAR FILL (TYP) WATERPROOFING PER SPECIFICATION PRECAST CONNECTION - HARDWARE DESIGNED t INSTALLED BY PRECAST CONTRACTOR b 2 - #5 CONT. QJC� m lull HOI STWAY d ° a a d �. • • ° .d d a ° SECTION e SCALE: BAN I'-ON SECT I ON Fio`� SCALE: 314" = I' -O" F2.I FINISH FLOOR EL. PER PLAN Z 9 314" PRECAST a PANEL N T /PIT SLAB EL. PER PLAN N pJC• � m REINFORCING PER PLAN SEE PLAN PRECAST PANEL 11/13/06 PRECAST PANEL a 06 -213 S a d d °N 0. d FINISH GRADE OR W PRECAST CONNECTION PAVEMENT EL. °a PER SITE PERMITS HARDWARE DESIGNED E � _z F 11111111 ° 2 ESI #2 1/2" EXPANSION a b m JOINT MATERIAL ° ° d W W T /CONCRETE SLAB d A PER SITE DWGS. ° � Z FINISH GRADE EL. _ _ is ° o� PER SITE DWGS. — III — III —I I ° DRILL AND EPDXY d a Fo a #4 BARS x 6' -O" @ 24" O.G. 711111111111 ° ° SEE SHEET 52.3 FOR W/4 1/4" MIN. EMBEDMENT d - T/FTG. EL. I I =i COLUMN BASE DETAILS USE HILTI HIT HY150 a d EPDXY SYSTEM PER PLAN dd d . ad e Fy SHIMS AND GROUT d d ° ° O BY PRECAST ° b . °' ' WALL FOOTING BEYOND ° m Z ° a ° ' 1 d d a . . PRECAST CONNECTION f CONCRETE HARDWARE DESIGNED t p FOOTING PER INSTALLED BY PRECAST d ° ° PLAN CONTRACTOR GROUT t SHIMS BY PRECAST CONTRACTOR T/FTG. EL. d d d d d.. °. • d • SECT I ON Fio`� SCALE: 314" = I' -O" F2.I FINISH FLOOR EL. PER PLAN Z 9 314" PRECAST a PANEL N T /PIT SLAB EL. PER PLAN N pJC• � m REINFORCING PER PLAN SEE PLAN PRECAST PANEL SECTION Fi`� 3,Q ° a -------- GRANULAR FILL (TYP) WATERPROOFING PER SPECIFICATION d SEE PLAN FOR T /BM EL. FINISH FLOOR EL. PER PLAN 4 -1/2" m x0' -3 314" WEDGE ANCHORS (2 -1/3" MIN. EMBED) (2 -N.5., 2 -F.5) STAGGER LOCATION HORIZ. TO MAINTAIN VC,. TO G. MIN. SPACING BETWEEN ANCHORS. d. HOI5TWAY SECTION -r 1/2' EXPANSION JOINT MATERIAL 1 /20 xI' -6" SMOOTH DOWEL — @ IW O.G. @ DOOR LOCATIONS (I) -#4 GONT. ONLY FINISH FLOOR EL.- @ 18" O.G. PER PLAN d d o 2-011 . 11/13/06 �'— COLUMN PER PLAN 06 -213 S — ISOLATION JOINT °N 0. FILL WITH CONCRETE W PRECAST CONNECTION ° PERMITS HARDWARE DESIGNED E 8 1 /2" EXPANSION _z F INSTALLED BY PRECAST ° 2 ESI #2 CONTRACTOR JOINT MATERIAL m C) ° FINISH FLOOR EL. W W PER PLAN � Z FINISH GRADE EL. _ _ — I dpi 4 PER SITE DWGS. — III — III —I I ° aQ a O In 711111111111 ° ° SEE SHEET 52.3 FOR - T/FTG. EL. I I =i COLUMN BASE DETAILS d PER PLAN dd d . ad Z W 1 a d.. SHIMS AND GROUT d d ° ° O BY PRECAST ° b . °' ' WALL FOOTING BEYOND ° m CONTRACTOR ° ° a ° ' 1 d d a . . CONCRETE N FOOTING PER ° ° PLAN SECTION Fi`� 3,Q ° a -------- GRANULAR FILL (TYP) WATERPROOFING PER SPECIFICATION d SEE PLAN FOR T /BM EL. FINISH FLOOR EL. PER PLAN 4 -1/2" m x0' -3 314" WEDGE ANCHORS (2 -1/3" MIN. EMBED) (2 -N.5., 2 -F.5) STAGGER LOCATION HORIZ. TO MAINTAIN VC,. TO G. MIN. SPACING BETWEEN ANCHORS. d. HOI5TWAY SECTION -r 1/2' EXPANSION JOINT MATERIAL 1 /20 xI' -6" SMOOTH DOWEL — @ IW O.G. @ DOOR LOCATIONS (I) -#4 GONT. ONLY FINISH FLOOR EL.- @ 18" O.G. PER PLAN d d o 2-011 . O iv in #4 @ 18" O.G. 2-O" VOW. . d Q, ° 0 RIGID INSULATION PER ARCH. 4 ° a a ° °.d d CONCRETE ° ° . A FOOTING PER ad • • SECT I ON P`� SCALE: 3/4' = 1' -(1 . GRANULAR FILL f TYP) -J SILL ANGLE WHERE REOV. BY ELEVATOR SUPPLIER 4Tp ° N d HOI STWAY WATERPROOFING PER SPECIFICATION PRECAST CONNECTION - HARDWARE DESIGNED t INSTALLED BY PRECAST CONTRACTOR 2 - #5 CONT. SECTION F8 FINISH FLOOR EL. PER PLAN 9 3/4" PRECAST p- PANEL N T /PIT SLAB EL. PER PLAN 0. V m REINFORCING PER PLAN x a 12 11/13/06 o 06 -213 S d °N 0. I I W m rn FOR: PERMITS 11/13/06 T/FTG . EL. _z F E51 #1 A PER PLAN 2 ESI #2 1/2/07 .d- m C) vz W W z v � O iv in #4 @ 18" O.G. 2-O" VOW. . d Q, ° 0 RIGID INSULATION PER ARCH. 4 ° a a ° °.d d CONCRETE ° ° . A FOOTING PER ad • • SECT I ON P`� SCALE: 3/4' = 1' -(1 . GRANULAR FILL f TYP) -J SILL ANGLE WHERE REOV. BY ELEVATOR SUPPLIER 4Tp ° N d HOI STWAY WATERPROOFING PER SPECIFICATION PRECAST CONNECTION - HARDWARE DESIGNED t INSTALLED BY PRECAST CONTRACTOR 2 - #5 CONT. SECTION F8 FINISH FLOOR EL. PER PLAN 9 3/4" PRECAST p- PANEL N T /PIT SLAB EL. PER PLAN 0. V m REINFORCING PER PLAN x a 12 11/13/06 o 06 -213 SCALE: d °N ? I I W m rn FOR: PERMITS 11/13/06 r` r` 12/11/06 E51 #1 12/21/06 2 ESI #2 1/2/07 .d- a C) vz W W z v � z S2 Z p F V) aQ a In can °' °- 3 V° cn m O OM �o M r EMZ� " cu ' .O N a(j)aT Z ca cc O r 'v C M _ W z z WO �QI — oZ Z �Q 0 m W ZwZ � U W z Q� UQ W Jo� oU�N � M a m U Z Oco) Ga Z~ � W O� um DWG. DATE: 11/13/06 JOB NUMBER: 06 -213 SCALE: AS NOTED CREATED BY: J.W.G. CHECKED BY: J.A.L. ISSUED FOR: PERMITS 11/13/06 CONSTRUCTION 12/11/06 E51 #1 12/21/06 2 ESI #2 1/2/07 i i I