Loading...
HomeMy WebLinkAbout07020031.6TH I RD FLOOR, FRAMING PLAN •� I. TOP OF SLAB ELEVATION = +50' -C' 2. TOP OF STEEL (T /S) ELEVATION = +2q -8 °. B. JOIST BEARING LVB) ELEVATION = +29' -3V' U.N.O. 4. SPLICE ALL COLUMNS PER DETAIL ON 52:3. 5. SEE SECOND FLOOR FRAMING PLrNN FOR COLUMN SIZES. 6. ALL STEEL WIDE FLANGE SHAPE SHALL CONFORM TO ASTM 572 GRADE 50. 7. INSTALL BRIDGING IN ACCORDANCE WITH 5.11. SPECIFICATIONS. 8. VALUES NOTED AT BEAM ANIP JOIST C IRT —i:-R ENDS ARE MAXIMUM SERVICE REACTIONS. MINIMUM DE: 16N RE,04TION = 20 KIPS IF NO VALUE IS SHOWN. — x 11/13/06 a. 06 -213 r') O AS NOTED d- co U � c,' Z I I FOR: o`n-> Ln 11/13/06 CONSTRUCTION 12/11/06 ESI #1 O U :3 2 ESI #2 N O Q Q W -E N co O E W 3 Z O mWmZ a �Z OFCn °o 0 o-4- 1 0 cn 3 } m m p W vM cooz E co �G>N� ON a(j)aT Z rM c� M C t� z z W 13� 0 > LL Z Z owQ 0 mWZwJ � L U LLI o z J �a o- W o c) oU�N � M co Ir- a r U Z CC a °oa � c� z �Q LL DWG. DATE: 11/13/06 JOB NUMBER: 06 -213 SCALE: AS NOTED CREATED BY: J.W.G. CHECKED BY: J.A.L. ISSUED FOR: PERMITS 11/13/06 CONSTRUCTION 12/11/06 ESI #1 12/21/06 2 ESI #2 1/2/07 � SHEET NO. A zom i �I e